International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 9

Electrical equipment and systems for railways

 
export to xls file

TC 9 Work programme (11)

Project

Reference

Document

Reference

Init.

Date

Current

Stage

Next

Stage

Working

Group

Project

Leader

Fcst. Publ.

Date

PNW 9-2605 ED1

Railway applications – Rolling stock – Fuel cell systems for propulsion - Part 1: Fuel Cell System

9/2605A/NP PRVN
  • PRVN
  • Preparation of RVN

2020-09

2020-10

2023-12
PNW 9-2614

Railway applications – Fixed installations - Electronic power converters - Part 2-1: DC Traction Applications - Diode rectifiers

9/2614/NP PNW
  • PNW
  • New Work Item Proposal

2020-07

PRVN
  • PRVN
  • Preparation of RVN document

2020-10

WG 50 Tomas Greif 2023-08
IEC 61375-2-6 ED2

Electronic railway equipment - Train communication network (TCN) - Part 2-6: On-board to ground communication

9/2629/RR 2020-09 ACD
  • ACD
  • Approved for CD

2020-09

CD
  • CD
  • Draft circulated as CD

2021-04

WG 43 Marco Predonzan 2023-06
IEC 61375-2-8 ED1

Electronic railway equipment - Train communication network (TCN) - Part 2-8: TCN conformance test of ETB, ECN and Communication profile

9/2604/CDV 2017-01 CCDV
  • CCDV
  • Draft circulated as CDV

2020-08

PRVC
  • PRVC
  • Preparation of RVC

2020-10

WG 43 Marco Predonzan 2021-08
IEC 62499 ED2

Railway applications - Current collection systems - Pantographs, testing methods for carbon contact strips

9/2611/CDV 2019-08 CCDV
  • CCDV
  • Draft circulated as CDV

2020-09

PRVC
  • PRVC
  • Preparation of RVC

2020-11

MT 62499 Wei Wang 2021-10
IEC 62590-1 ED1

Railway applications – Fixed installations – Electronic Power Converters – Part 1: General requirements

9/2593/CD 2019-09 ACD
  • ACD
  • Approved for CD

2020-07

2CD
  • 2CD

2021-03

WG 50 Tomas Greif 2022-01
IEC 62590-3-1 ED1

Railway applications - Fixed installations - Electronic power converters - Part 3-1: AC traction applications - Electronic power compensators

9/2580/CD 2019-03 ACDV
  • ACDV
  • Approved for CDV

2020-05

TCDV
  • TCDV
  • Translation of CDV

2021-01

PT 62590-3-1 Ryo TAKAGI 2022-04
IEC 62973-3 ED1

Railway applications - Rolling stock - Batteries for auxiliary power supply systems - Part 3: Lead acid batteries

9/2628/CD 2019-08 CD
  • CD
  • Draft circulated as CD

2020-09

PCC
  • PCC
  • Preparation of CC document

2020-12

PT 62973-3 Ying YANG 2022-12
IEC 62973-4 ED1

Railway applications - Rolling stock - Batteries for auxiliary power supply systems - Part 4: Secondary sealed nickel-metal hydride batteries

9/2548/CDV 2018-04 RFDIS
  • RFDIS
  • FDIS received and registered

2020-09

CFDIS
  • CFDIS
  • Draft circulated as FDIS

2020-12

PT 62973-4 Hideaki OHYAMA 2021-03
IEC 62973-5 ED1

Railway applications - Rolling stock - Batteries for auxiliary power supply systems - Part 5: Lithium-ion batteries

9/2569/NP 2020-03 ACD
  • ACD
  • Approved for CD

2020-03

CD
  • CD
  • Draft circulated as CD

2021-04

PT 62973-5 Takefumi Inoue 2023-12
IEC 63190 ED1

Railway applications – Fixed installations – Electric traction – Copper and copper alloy messenger wires for overhead contact line systems

9/2592/CD 2018-03 ACDV
  • ACDV
  • Approved for CDV

2020-09

TCDV
  • TCDV
  • Translation of CDV

2020-12

PT 63190 Vasily Kuryanov 2022-12