International Standards and Conformity Assessment for all electrical, electronic and related technologies

SC 34C

Auxiliaries for lamps

 
export to xls file

SC 34C Work programme (10)

Project

Reference

Document

Reference

Init.

Date

Current

Stage

Next

Stage

Working

Group

Project

Leader

Fcst. Publ.

Date

IEC 61347-1 ED4

Lamp controlgear - Part 1: General and safety requirements

34C/1492/CD 2019-02 CD
  • CD
  • Draft circulated as CD

2020-07

PCC
  • PCC
  • Preparation of CC document

2020-10

WG 1 Lukas Kastelein 2021-11
IEC 61347-2-1 ED2

Lamp controlgear - Part 2-1: Particular requirements for starting devices (other than glow starters)

34C/1493/CD 2019-02 CD
  • CD
  • Draft circulated as CD

2020-07

PCC
  • PCC
  • Preparation of CC document

2020-10

WG 1 Eike Friedrichs 2021-11
IEC 61347-2-2 ED3

Controlgear for electric light sources– Part 2-2: Particular requirements for DC or AC supplied electronic step-down convertors for filament lamps

34C/1494/CD 2019-02 CD
  • CD
  • Draft circulated as CD

2020-07

PCC
  • PCC
  • Preparation of CC document

2020-10

WG 1 Eike Friedrichs 2021-11
IEC 61347-2-3 ED3

Lamp control gear - Part 2-3: Particular requirements for a.c. and/or d.c. supplied electronic control gear for fluorescent lamps

34C/1495/CD 2019-02 CD
  • CD
  • Draft circulated as CD

2020-07

PCC
  • PCC
  • Preparation of CC document

2020-10

WG 1 Eike Friedrichs 2021-11
IEC 61347-2-7/AMD2 ED3

Amendment 2 - Lamp controlgear - Part 2-7: Particular requirements for battery supplied electronic controlgear for emergency lighting (self-contained)

34C/1490/CDV 2017-11 CCDV
  • CCDV
  • Draft circulated as CDV

2020-07

PRVC
  • PRVC
  • Preparation of RVC

2020-10

JWG 3 Fabio Pedrazzi 2021-09
IEC 61347-2-8 ED2

Lamp controlgear - Part 2-8: Particular requirements for ballasts for fluorescent lamps

34C/1496/CD 2019-02 CD
  • CD
  • Draft circulated as CD

2020-07

PCC
  • PCC
  • Preparation of CC document

2020-10

WG 1 Eike Friedrichs 2021-11
IEC 61347-2-10 ED2

Controlgear for electric light sources - Part 2-10: Particular requirements for electronic invertors and convertors for high-frequency operation of cold start tubular discharge lamps (neon tubes)

34C/1497/CD 2019-02 CD
  • CD
  • Draft circulated as CD

2020-07

PCC
  • PCC
  • Preparation of CC document

2020-10

WG 1 Eike Friedrichs 2021-11
IEC 61347-2-11 ED2

Lamp controlgear - Part 2-11: Particular requirements for miscellaneous electronic circuits used with luminaires

34C/1498/CD 2019-02 CD
  • CD
  • Draft circulated as CD

2020-07

PCC
  • PCC
  • Preparation of CC document

2020-10

WG 1 Eike Friedrichs 2021-11
IEC 61347-2-12 ED2

Lamp controlgear - Part 2-12: Particular requirements for d.c. or a.c. supplied electronic controlgear for discharge lamps (excluding fluorescent lamps)

34C/1499/CD 2019-02 CD
  • CD
  • Draft circulated as CD

2020-07

PCC
  • PCC
  • Preparation of CC document

2020-10

WG 1 Eike Friedrichs 2021-11
IEC 61347-2-13 ED3

Controlgear for electric light sources - Part 2-13: Particular requirements for d.c. or a.c. supplied electronic controlgear for LED modules

34C/1500/CD 2019-02 CD
  • CD
  • Draft circulated as CD

2020-07

PCC
  • PCC
  • Preparation of CC document

2020-10

WG 1 Eike Friedrichs 2021-11