International Standards and Conformity Assessment for all electrical, electronic and related technologies

SC 65E

Devices and integration in enterprise systems

 
export to xls file

SC 65E Work programme (42)

Project

Reference

Document

Reference

Init.

Date

Current

Stage

Next

Stage

Working

Group

Project

Leader

Fcst. Publ.

Date

PNW 65E-659

Industrial automation equipment and systems - Predictive maintenance

65E/659/NP PNW
  • PNW
  • New Work Item Proposal

2019-07

PRVN
  • PRVN
  • Preparation of RVN document

2019-09

Chengcheng Wang 2022-04
PNW 65E-661

Engineering data exchange format for use in industrial automation systems engineering - Automation Markup Language - Part 5: Communication

65E/661/NP PNW
  • PNW
  • New Work Item Proposal

2019-07

PRVN
  • PRVN
  • Preparation of RVN document

2019-10

WG 9 Nicole Schmidt 2022-05
PNW 65E-663

Automation engineering of modular systems in the process industry – General concept and interfaces

65E/663/NP PNW
  • PNW
  • New Work Item Proposal

2019-08

PRVN
  • PRVN
  • Preparation of RVN document

2019-10

Gerald Mayr 2022-03
IEC 61804-3 ED4

Function Blocks (FB) for process control and Electronic Device Description Language (EDDL) - Part 3: EDDL syntax and semantics

65E/631/CDV 2017-05 PRVC
  • PRVC
  • Preparation of RVC

2019-02

2019-05

WG 7 Christian Diedrich 2020-07
IEC 61804-4 ED2

Function blocks (FB) for process control and electronic device description language (EDDL) - Part 4: EDD interpretation

65E/633/CDV 2017-05 PRVC
  • PRVC
  • Preparation of RVC

2019-02

2019-05

WG 7 Christian Diedrich 2020-07
IEC 61804-5 ED2

Function blocks (FB) for process control and electronic device description language (EDDL) - Part 5: EDDL Builtin library

65E/634/CDV 2017-05 PRVC
  • PRVC
  • Preparation of RVC

2019-02

2019-05

WG 7 Christian Diedrich 2020-07
IEC 61987-31 ED1

IEC 61987, Part 31: List of Properties (LOP) of infrastructure devices for electronic data exchange – Generic structures

65E/598/NP 2018-09 ACD
  • ACD
  • Approved for CD

2018-09

CD
  • CD
  • Draft circulated as CD

2019-12

WG 2 Klaus Bonnemann 2021-06
IEC 61987-32 ED1

IEC 61987, Part 32: Lists of properties (LOP) for I/O modules for electronic data exchange

65E/599/NP 2018-09 ACD
  • ACD
  • Approved for CD

2018-09

CD
  • CD
  • Draft circulated as CD

2019-12

WG 2 Klaus Bonnemann 2021-06
IEC 62264-6 ED1

Enterprise/Control System Integration – Messaging Service Model

65E/616/CDV 2017-09 PRVC
  • PRVC
  • Preparation of RVC

2018-11

2019-02

JWG 5 Dennis L. Brandl 2020-07
IEC TR 62541-1 ED3

OPC unified architecture - Part 1: Overview and concepts

65E/605/CD 2017-07 ADTR
  • ADTR
  • Approved for DTR circulation

2018-09

TDTR
  • TDTR
  • Translation of DTR

2019-09

WG 8 Ingo Weber 2020-06
IEC TR 62541-2 ED3

OPC unified architecture - Part 2: Security Model

65E/606/CD 2017-07 ADTR
  • ADTR
  • Approved for DTR circulation

2018-09

TDTR
  • TDTR
  • Translation of DTR

2019-09

WG 8 Ingo Weber 2020-06
IEC 62541-3 ED3

OPC unified architecture - Part 3: Address Space Model

65E/601/CDV 2017-07 AFDIS
  • AFDIS
  • Approved for FDIS

2019-08

TFDIS
  • TFDIS
  • Translation of FDIS

2019-09

WG 8 Ingo Weber 2020-05
IEC 62541-4 ED3

OPC Unified Architecture - Part 4: Services

65E/602/CDV 2017-07 AFDIS
  • AFDIS
  • Approved for FDIS

2019-08

TFDIS
  • TFDIS
  • Translation of FDIS

2019-09

WG 8 Ingo Weber 2020-05
IEC 62541-5 ED3

OPC Unified Architecture - Part 5: Information Model

65E/603/CDV 2017-07 AFDIS
  • AFDIS
  • Approved for FDIS

2019-08

TFDIS
  • TFDIS
  • Translation of FDIS

2019-09

WG 8 Ingo Weber 2020-05
IEC 62541-6 ED3

OPC unified architecture - Part 6: Mappings

65E/607/CDV 2017-07 AFDIS
  • AFDIS
  • Approved for FDIS

2019-08

TFDIS
  • TFDIS
  • Translation of FDIS

2019-09

WG 8 Ingo Weber 2020-05
IEC 62541-7 ED3

OPC unified architecture - Part 7: Profiles

65E/608/CDV 2017-07 AFDIS
  • AFDIS
  • Approved for FDIS

2019-08

TFDIS
  • TFDIS
  • Translation of FDIS

2019-09

WG 8 Ingo Weber 2020-05
IEC 62541-8 ED3

OPC Unified Architecture - Part 8: Data Access

65E/609/CDV 2017-07 AFDIS
  • AFDIS
  • Approved for FDIS

2019-08

TFDIS
  • TFDIS
  • Translation of FDIS

2019-09

WG 8 Ingo Weber 2020-05
IEC 62541-9 ED3

OPC Unified Architecture - Part 9: Alarms and conditions

65E/610/CDV 2017-07 AFDIS
  • AFDIS
  • Approved for FDIS

2019-08

TFDIS
  • TFDIS
  • Translation of FDIS

2019-09

WG 8 Ingo Weber 2020-05
IEC 62541-10 ED3

OPC Unified Architecture - Part 10: Programs

65E/611/CDV 2017-07 AFDIS
  • AFDIS
  • Approved for FDIS

2019-08

TFDIS
  • TFDIS
  • Translation of FDIS

2019-09

WG 8 Ingo Weber 2020-05
IEC 62541-11 ED2

OPC Unified Architecture - Part 11: Historical Access

65E/612/CDV 2017-07 AFDIS
  • AFDIS
  • Approved for FDIS

2019-08

TFDIS
  • TFDIS
  • Translation of FDIS

2019-09

WG 8 Ingo Weber 2020-05
IEC 62541-12 ED1

OPC Unified Architecture Specification: Part 12 - Discovery

65E/615/CDV 2016-02 AFDIS
  • AFDIS
  • Approved for FDIS

2019-08

TFDIS
  • TFDIS
  • Translation of FDIS

2019-09

WG 8 Ingo Weber 2020-05
IEC 62541-13 ED2

OPC Unified Architecture - Part 13: Aggregates

65E/613/CDV 2017-07 AFDIS
  • AFDIS
  • Approved for FDIS

2019-08

TFDIS
  • TFDIS
  • Translation of FDIS

2019-09

WG 8 Ingo Weber 2020-05
IEC 62541-14 ED1

OPC Unified Architecture – Part 14: PubSub

65E/617/CDV 2017-11 AFDIS
  • AFDIS
  • Approved for FDIS

2019-08

TFDIS
  • TFDIS
  • Translation of FDIS

2019-09

WG 8 Jim Luth 2020-05
IEC 62714-2 ED2

Engineering data exchange format for use in industrial automation systems engineering - Automation markup language - Part 2: Semantics libraries

65E/597/RR 2018-05 ACD
  • ACD
  • Approved for CD

2018-05

CD
  • CD
  • Draft circulated as CD

2019-04

WG 9 Nicole Schmidt 2021-04
IEC 62714-4 ED1

Engineering data exchange format for use in industrial automation systems engineering - Automation Markup Language - Part 4: Logic

65E/654/CDV 2017-01 PRVC
  • PRVC
  • Preparation of RVC

2019-08

2019-11

WG 9 Nicole Schmidt 2020-07
IEC 62769-1 ED2

Field device integration (FDI) - Part 1: Overview

65E/588/CDV 2017-05 AFDIS
  • AFDIS
  • Approved for FDIS

2018-10

TFDIS
  • TFDIS
  • Translation of FDIS

2019-01

WG 7 Christian Diedrich 2020-04
IEC 62769-2 ED2

Field Device Integration (FDI) - Part 2: FDI Client

65E/589/CDV 2017-05 AFDIS
  • AFDIS
  • Approved for FDIS

2018-10

TFDIS
  • TFDIS
  • Translation of FDIS

2019-01

WG 7 Christian Diedrich 2020-04
IEC 62769-3 ED2

Field Device Integration (FDI) - Part 3: FDI Server

65E/590/CDV 2017-05 AFDIS
  • AFDIS
  • Approved for FDIS

2018-10

TFDIS
  • TFDIS
  • Translation of FDIS

2019-01

WG 7 Christian Diedrich 2020-04
IEC 62769-4 ED2

Field Device Integration (FDI) - Part 4: FDI Packages

65E/591/CDV 2017-05 AFDIS
  • AFDIS
  • Approved for FDIS

2018-10

TFDIS
  • TFDIS
  • Translation of FDIS

2019-01

WG 7 Christian Diedrich 2020-04
IEC 62769-5 ED2

Field Device Integration (FDI) - Part 5: FDI Information Model

65E/592/CDV 2017-05 AFDIS
  • AFDIS
  • Approved for FDIS

2018-10

TFDIS
  • TFDIS
  • Translation of FDIS

2019-01

WG 7 Christian Diedrich 2020-04
IEC 62769-6 ED2

Field Device Integration (FDI) - Part 6: FDI Technology Mapping

65E/593/CDV 2017-05 AFDIS
  • AFDIS
  • Approved for FDIS

2018-10

TFDIS
  • TFDIS
  • Translation of FDIS

2019-01

WG 7 Christian Diedrich 2020-04
IEC 62769-7 ED2

Field Device Integration (FDI) - Part 7: FDI Communication Devices

65E/594/CDV 2017-05 AFDIS
  • AFDIS
  • Approved for FDIS

2018-10

TFDIS
  • TFDIS
  • Translation of FDIS

2019-01

WG 7 Christian Diedrich 2020-04
IEC 62769-100 ED1

FIELD DEVICE INTEGRATION (FDI) – PART 100: Profiles – Generic protocols

65E/573/CDV 2017-10 AFDIS
  • AFDIS
  • Approved for FDIS

2018-10

TFDIS
  • TFDIS
  • Translation of FDIS

2019-01

WG 7 Christian Diedrich 2020-04
IEC 62769-101-1 ED2

Field device Integration (FDI) - Part 101-1: Profiles - Foundation Fieldbus H1

65E/620/CDV 2017-05 PRVC
  • PRVC
  • Preparation of RVC

2018-12

2019-03

WG 7 Christian Diedrich 2020-06
IEC 62769-101-2 ED2

Field Device Integration (FDI) - Part 101-2: Profiles - Foundation Fieldbus HSE

65E/621/CDV 2017-05 PRVC
  • PRVC
  • Preparation of RVC

2018-12

2019-03

WG 7 Christian Diedrich 2020-06
IEC 62769-103-1 ED2

Field Device Integration (FDI) - Part 103-1: Profiles - PROFIBUS

65E/622/CDV 2017-05 PRVC
  • PRVC
  • Preparation of RVC

2018-12

2019-03

WG 7 Christian Diedrich 2020-06
IEC 62769-103-4 ED2

Field Device Integration (FDI) - Part 103-4: Profiles - PROFINET

65E/623/CDV 2017-05 PRVC
  • PRVC
  • Preparation of RVC

2018-12

2019-03

WG 7 Christian Diedrich 2020-06
IEC 62769-109-1 ED2

Field Devices Integration (FDI) - Part 109-1: Profiles - HART® and WirelessHART®

65E/624/CDV 2017-05 PRVC
  • PRVC
  • Preparation of RVC

2018-12

2019-03

WG 7 Christian Diedrich 2020-06
IEC 62769-115-2 ED1

FIELD DEVICE INTEGRATION (FDI) – PART 115-2: Profiles – Modbus-RTU

65E/574/CDV 2017-10 AFDIS
  • AFDIS
  • Approved for FDIS

2018-10

TFDIS
  • TFDIS
  • Translation of FDIS

2019-01

WG 7 Christian Diedrich 2020-04
IEC 62769-150-1 ED1

FIELD DEVICE INTEGRATION (FDI) – PART 150-1: Profiles – ISA100.11a

65E/584/CDV 2017-10 AFDIS
  • AFDIS
  • Approved for FDIS

2018-10

TFDIS
  • TFDIS
  • Translation of FDIS

2019-01

WG 7 Christian Diedrich 2020-04
IEC TR 63082-1 ED1

Intelligent Device Management - Part 1: Concepts and Terminology

65E/653/DTR

2016-09 PRVDTR
  • PRVDTR
  • Preparation of RVDTR document

2019-05

2019-07

WG 10 Ian Verhappen 2020-04
IEC 63261 ED1

Representation of electrical & instrument objects in digital 3D plant models during engineering

65E/656/NP 2019-07 ACD
  • ACD
  • Approved for CD

2019-07

CD
  • CD
  • Draft circulated as CD

2019-12

PT 63261 Carsten Bödege 2022-06