TC 94

All-or-nothing electrical relays

 
export to xls file

TC 94 Work programme (23)

Project

Reference

Document

Reference

Init.

Date

Current

Stage

Next

Stage

Working

Group

Project

Leader

Fcst. Publ.

Date

PNW 94-492 ED1

All-or-nothing electrical relays – Tests and Measurements – Part 7-54: Critical DC load current test

94/492/NP PNW
  • PNW
  • New work item proposal

2021-04

PRVN
  • PRVN
  • Preparation of RVN

2021-06

WG 3 Takahiro Ide 2023-09
PNW 94-493 ED1

All-or-nothing electrical relays – Tests and Measurements – Part 7-53: Slow decrease and increase of supply voltage

94/493/NP PNW
  • PNW
  • New work item proposal

2021-04

PRVN
  • PRVN
  • Preparation of RVN

2021-06

WG 3 Takahiro Ide 2023-09
PNW 94-494 ED1

All-or-nothing electrical relays – Tests and Measurements – Part 7-52: Coil overvoltage

94/494/NP PNW
  • PNW
  • New work item proposal

2021-04

PRVN
  • PRVN
  • Preparation of RVN

2021-06

WG 3 Takahiro Ide 2023-09
PNW 94-495 ED1

All-or-nothing electrical relays – Tests and Measurements – Part 7-51: Reset behavior at coil voltage drop

94/495/NP PNW
  • PNW
  • New work item proposal

2021-04

PRVN
  • PRVN
  • Preparation of RVN

2021-06

WG 3 Takahiro Ide 2023-09
PNW 94-496 ED1

All-or-nothing electrical relays – Tests and Measurements – Part 7-50: Momentary drop in supply voltage

94/496/NP PNW
  • PNW
  • New work item proposal

2021-04

PRVN
  • PRVN
  • Preparation of RVN

2021-06

WG 3 Takahiro Ide 2023-09
PNW 94-497 ED1

All-or-nothing electrical relays – Tests and Measurements – Part 7-49: Long term stability of sealing

94/497/NP PNW
  • PNW
  • New work item proposal

2021-04

PRVN
  • PRVN
  • Preparation of RVN

2021-06

WG 3 Takahiro Ide 2023-09
PNW 94-498 ED1

All-or-nothing electrical relays – Tests and Measurements – Part 7-47: Making and breaking capacities

94/498/NP PNW
  • PNW
  • New work item proposal

2021-04

PRVN
  • PRVN
  • Preparation of RVN

2021-06

WG 3 Kenjiro Hamada 2023-09
PNW 94-499 ED1

All-or-nothing electrical relays – Tests and Measurements – Part 7-48: Contact reliability test

94/499/NP PNW
  • PNW
  • New work item proposal

2021-04

PRVN
  • PRVN
  • Preparation of RVN

2021-06

WG 3 Kenjiro Hamada 2023-09
PNW 94-500 ED1

All-or-nothing electrical relays – Tests and Measurements – Part 7-46: Surge withstand test

94/500/NP PNW
  • PNW
  • New work item proposal

2021-04

PRVN
  • PRVN
  • Preparation of RVN

2021-06

WG 3 Takahiro Ide 2023-09
PNW 94-501 ED1

All-or-nothing electrical relays – Tests and Measurements – Part 7-45: Maximum cycling frequency

94/501/NP PNW
  • PNW
  • New work item proposal

2021-04

PRVN
  • PRVN
  • Preparation of RVN

2021-06

WG 3 Kenjiro Hamada 2023-09
PNW 94-502 ED1

All-or-nothing electrical relays – Tests and Measurements – Part 7-44: Salt mist

94/502/NP PNW
  • PNW
  • New work item proposal

2021-04

PRVN
  • PRVN
  • Preparation of RVN

2021-06

WG 3 Takahiro Ide 2023-09
PNW 94-503 ED1

All-or-nothing electrical relays – Tests and Measurements – Part 7-39: Tests: Insertion and withdrawal force (mating relay and socket)

94/503/NP PNW
  • PNW
  • New work item proposal

2021-04

PRVN
  • PRVN
  • Preparation of RVN

2021-06

WG 3 Marcello Grande 2023-09
PNW 94-504 ED1

All-or-nothing electrical relays – Tests and Measurements – Part 7-36: Fire hazard

94/504/NP PNW
  • PNW
  • New work item proposal

2021-04

PRVN
  • PRVN
  • Preparation of RVN

2021-06

WG 3 Ningyi LU 2023-09
PNW 94-505 ED1

All-or-nothing electrical relays – Tests and Measurements – Part 7-35: Resistance to cleaning solvents

94/505/NP PNW
  • PNW
  • New work item proposal

2021-04

PRVN
  • PRVN
  • Preparation of RVN

2021-06

WG 3 gao wei 2023-09
PNW 94-506 ED1

All-or-nothing electrical relays – Tests and Measurements – Part 7-17: Shock, Vibration and Acceleration

94/506/NP PNW
  • PNW
  • New work item proposal

2021-04

PRVN
  • PRVN
  • Preparation of RVN

2021-06

WG 3 Marcus Herrmann 2023-09
PNW 94-507 ED1

All-or-nothing electrical relays – Tests and Measurements – Part 7-15: Robustness of Terminals

94/507/NP PNW
  • PNW
  • New work item proposal

2021-04

PRVN
  • PRVN
  • Preparation of RVN

2021-06

WG 3 Marcus Herrmann 2023-09
PNW 94-508 ED1

All-or-nothing electrical relays – Tests and Measurements – Part 7-8: Timing

94/508/NP PNW
  • PNW
  • New work item proposal

2021-04

PRVN
  • PRVN
  • Preparation of RVN

2021-06

WG 3 Marcello Grande 2023-09
PNW 94-509 ED1

All-or-nothing electrical relays – Tests and Measurements – Part 7-7: Functional Tests

94/509/NP PNW
  • PNW
  • New work item proposal

2021-04

PRVN
  • PRVN
  • Preparation of RVN

2021-06

WG 3 Marcus Herrmann 2023-09
PNW 94-510 ED1

All-or-nothing electrical relays – Tests and Measurements – Part 7-5: Insulation resistance

94/510/NP PNW
  • PNW
  • New work item proposal

2021-04

PRVN
  • PRVN
  • Preparation of RVN

2021-06

WG 3 gao wei 2023-09
PNW 94-511 ED1

All-or-nothing electrical relays – Tests and Measurements – Part 7-2: Mechanical tests and weighing

94/511/NP PNW
  • PNW
  • New work item proposal

2021-04

PRVN
  • PRVN
  • Preparation of RVN

2021-06

WG 3 Jue WANG 2023-09
IEC 61812-1 ED3

Time relays for industrial and residential use - Part 1: Requirements and tests

94/487/CD 2019-12 ACD
  • ACD
  • Approved for CD

2021-04

4CD
  • 4CD

2021-05

MT 4 Shinji Ueno 2022-12
IEC 62246-4 ED1

Reed switches – Part 4: Systematic aspects for the application of reed switches in safety related parts of control systems

94/513/CD 2020-06 CD
  • CD
  • Draft circulated as CD

2021-04

PCC
  • PCC
  • Preparation of CC

2021-06

WG 6 Kenjiro Hamada 2022-12
IEC 62314 ED2

Solid-state relays

94/480/CDV 2018-04 PRVC
  • PRVC
  • Preparation of RVC

2020-12

2021-03

WG 9 Takahiro Ide 2022-03