SC 17C Work programme (6)

Project

Reference

Document

Reference

Init.

Date

Current

Stage

Next

Stage

Working

Group

Project

Leader

Fcst. Publ.

Date

PNW TS 17C-711

High-voltage switchgear and controlger - Part 316: Mobile substation using air and gas-Insulated switchgear assemblies

17C/711/NP PNW
  • PNW
  • New Work Item Proposal

2019-05

PRVN
  • PRVN
  • Preparation of RVN document

2019-08

/ eter.grossmann@siemens.com / 2022-06
PNW TS 17C-712

High-voltage switchgear and controlgear - Part 317 DC gas-insulated switchgear assemblies

17C/712/NP PNW
  • PNW
  • New Work Item Proposal

2019-05

PRVN
  • PRVN
  • Preparation of RVN document

2019-08

2022-06
IEC 62271-200 ED3

High-voltage switchgear and controlgear - Part 200: AC metal-enclosed switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV

17C/705/CD 2018-07 PCC
  • PCC
  • Preparation of CC

2019-06

2019-07

MT 14 G.C. Schoonenberg 2020-10
IEC 62271-213 ED1

High-voltage switchgear and controlgear - Part 213: Voltage detecting and indicating system

17C/708/CD 2015-10 PCC
  • PCC
  • Preparation of CC

2019-07

2019-10

JWG 34 Patrick Pipet 2020-09
IEC 62271-215 ED1

IEC 62271-215 Ed. 1: Phase comparator

17C/709/CD 2017-03 PCC
  • PCC
  • Preparation of CC

2019-07

2019-08

JWG 34 Yves Chollot 2020-10
IEC TR 62271-312 ED1

HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR – Part 312: Guidance for the transferability of type tests of high-voltage/low-voltage prefabricated substations

17C/707/CD 2019-02 PCC
  • PCC
  • Preparation of CC document

2019-06

CDM
  • CDM
  • Committee Draft to be discussed at Meeting

2019-10

2020-05