TC 82 |
Solar photovoltaic energy systems |

Project Reference |
Document Reference |
Init. Date |
Current Stage |
Next Stage |
Working Group |
Project Leader |
Fcst. Publ. Date |
---|---|---|---|---|---|---|---|
PNW TS 82-1549
Tracker structure design using local wind conditions
|
82/1549/NP |
PRVN
2019-04 |
2019-05 |
WG 7 | Kenji Araki | 2022-03 | |
PNW TS 82-1599
Extended-stress testing of photovoltaic modules for risk analysis – Part 2: Durability characterization of polymeric component materials and packaging sets.
|
82/1599/NP |
PRVN
2019-09 |
2019-10 |
WG 2 | Nancy Phillips | 2021-11 | |
IEC 60891 ED3
Photovoltaic devices - Procedures for temperature and irradiance corrections to measured I-V characteristics
|
82/1541/CD | 2017-10 |
ACDV
2019-04 |
TCDV
2019-09 |
WG 2 | Christos Monokroussos | 2020-12 |
IEC 60904-1 ED3
Photovoltaic devices - Part 1: Measurement of photovoltaic current-voltage characteristics
|
82/1619/CDV | 2014-11 |
CCDV
2019-09 |
PRVC
2019-12 |
WG 2 | Harald Muellejans | 2020-12 |
IEC 60904-5/AMD1 ED2
Amendment 1 - Photovoltaic devices - Part 5: Determination of the equivalent cell temperature (ECT) of photovoltaic (PV) devices by the open-circuit voltage method
|
82/1530/RR | 2018-11 |
ACD
2018-11 |
CD
2019-09 |
WG 2 | guangchun Zhang | 2021-05 |
IEC 60904-8/AMD1 ED3
Amendment 1 - Photovoltaic devices - Part 8: Measurement of spectral responsivity of a photovoltaic (PV) device
|
82/1512/RR | 2018-11 |
ACD
2018-11 |
CD
2019-03 |
WG 2 | Stefan Winter | 2021-03 |
IEC 60904-9 ED3
Photovoltaic devices - Part 9: Classification of solar simulator characteristics
|
82/1539/CDV | 2014-08 |
TFDIS
2019-11 |
DECFDIS
2020-01 |
WG 2 | Werner Herrmann | 2020-07 |
IEC 60904-9-1 ED1
Photovoltaic devices - Part 9-1: Collimated beam solar simulator performance requirements
|
82/972/NP | 2015-08 |
ACD
2015-08 |
CD
2019-03 |
WG 7 | Stephen Askins | 2021-01 |
IEC 60904-10 ED3
Photovoltaic devices – Part 10: Methods of linear dependence and linearity measurements
|
82/1637/CDV | 2017-03 |
CCDV
2019-11 |
PRVC
2020-01 |
WG 2 | Elena Salis | 2020-12 |
IEC 61215-1 ED2
Terrestrial photovoltaic (PV) modules - Design qualification and type approval - Part 1: Test requirements
|
82/1628/CDV | 2017-08 |
CCDV
2019-10 |
PRVC
2020-01 |
WG 2 | Ingrid Repins | 2020-12 |
IEC 61215-1-1 ED2
Terrestrial photovoltaic (PV) modules - Design qualification and type approval - Part 1-1: Special requirements for testing of crystalline silicon photovoltaic (PV) modules
|
82/1629/CDV | 2017-08 |
CCDV
2019-10 |
PRVC
2020-01 |
WG 2 | Ingrid Repins | 2020-12 |
IEC 61215-1-2 ED2
Terrestrial photovoltaic (PV) modules - Design qualification and type approval - Part 1-2: Special requirements for testing of thin-film Cadmium Telluride (CdTe) based photovoltaic (PV) modules
|
82/1630/CDV | 2017-08 |
CCDV
2019-10 |
PRVC
2020-01 |
WG 2 | Ingrid Repins | 2020-12 |
IEC 61215-1-3 ED2
Terrestrial photovoltaic (PV) modules - Design qualification and type approval - Part 1-3: Special requirements for testing of thin-film amorphous silicon based photovoltaic (PV) modules
|
82/1631/CDV | 2017-08 |
CCDV
2019-10 |
PRVC
2020-01 |
WG 2 | Ingrid Repins | 2020-12 |
IEC 61215-1-4 ED2
Terrestrial photovoltaic (PV) modules - Design qualification and type approval - Part 1-4: Special requirements for testing of thin-film Cu(In,GA)(S,Se)2 based photovoltaic (PV) modules |
82/1632/CDV | 2017-08 |
CCDV
2019-10 |
PRVC
2020-01 |
WG 2 | Ingrid Repins | 2020-12 |
IEC 61215-2 ED2
Terrestrial photovoltaic (PV) modules - Design qualification and type approval - Part 2: Test procedures
|
82/1633/CDV | 2017-08 |
CCDV
2019-10 |
PRVC
2020-01 |
WG 2 | Ingrid Repins | 2020-12 |
IEC 61701 ED3
Salt mist corrosion testing of photovoltaic (PV) modules
|
82/1564/CDV | 2016-12 |
TFDIS
2019-11 |
DECFDIS
2020-01 |
WG 2 | Sean Fowler | 2020-07 |
IEC 61724-1 ED2
Photovoltaic system performance - Part 1: Monitoring
|
82/1614/RR | 2019-07 |
ACD
2019-07 |
CD
2020-05 |
WG 3 | Michael Gostein | 2021-06 |
IEC 61730-1/AMD1 ED2
Amendment 1 - Photovoltaic (PV) module safety qualification - Part 1: Requirements for construction
|
82/1660/CD | 2017-01 |
CD
2019-12 |
PCC
2020-03 |
WG 2 | Nancy Phillips | 2021-01 |
IEC 61730-2/AMD1 ED2
Amendment 1 - Photovoltaic (PV) module safety qualification - Part 2: Requirements for testing
|
82/1661/CD | 2018-09 |
CD
2019-12 |
PCC
2020-03 |
WG 2 | Guido Volberg | 2020-12 |
IEC 61853-2/AMD1 ED1
Amendment 1 - Photovoltaic (PV) module performance testing and energy rating - Part 2: Spectral responsivity, incidence angle and module operating temperature measurements
|
82/1382/RR | 2018-01 |
ACD
2018-01 |
CD
2018-08 |
WG 2 | Kyumin Lee | 2020-12 |
IEC 62093 ED2
Power conversion equipment for photovoltaic systems - Design qualification testing
|
82/1652/CD | 2014-06 |
CD
2019-11 |
PCC
2020-02 |
WG 6 | Hironobu Igarashi | 2021-01 |
IEC 62108 ED3
Concentrator photovoltaic (CPV) modules and assemblies - Design qualification and type approval
|
82/1513/RR | 2018-11 |
ACD
2018-11 |
CD
2018-11 |
WG 7 | Kenji Araki | 2021-02 |
IEC 62109-1 ED2
Safety of power converters for use in photovoltaic power systems - Part 1: General requirements
|
82/1422/RR | 2018-04 |
ACD
2018-04 |
CD
2018-08 |
WG 6 | Timothy Zgonena | 2020-12 |
IEC 62109-2 ED2
Safety of power converters for use in photovoltaic power systems - Part 2: Particular requirements for inverters
|
82/1423/RR | 2018-04 |
ACD
2018-04 |
CD
2018-08 |
WG 6 | Timothy Zgonena | 2020-12 |
IEC 62109-3 ED1
Safety of power converters for use in photovoltaic power systems - Part 3: Particular requirements for electronic devices in combination with photovoltaic elements
|
82/1511/CDV | 2012-05 |
TFDIS
2019-11 |
DECFDIS
2020-01 |
WG 6 | Christian Justi | 2020-07 |
IEC TS 62257-1 ED4
Renewable energy and hybrid systems for rural electrification - Part 1: General introduction to IEC 62257 series and rural electrification
|
82/1518/RR | 2018-11 |
ACD
2018-11 |
CD
2019-04 |
JWG 1 | Leon Drotsché | 2020-12 |
IEC TS 62257-2 ED3
Renewable energy and hybrid systems for rural electrification - Part 2: From requirements to a range of electrification systems
|
82/1519/RR | 2018-11 |
ACD
2018-11 |
CD
2019-09 |
JWG 1 | Wuthipong Suponthana | 2020-12 |
IEC TS 62257-3 ED3
Renewable energy and hybrid systems for rural electrification - Part 3: Project development and management
|
82/1520/RR | 2018-11 |
ACD
2018-11 |
CD
2019-09 |
JWG 1 | Christopher West | 2020-12 |
IEC TS 62257-4 ED3
Renewable energy and hybrid systems for rural electrification - Part 4: System selection and design
|
82/1521/RR | 2018-11 |
ACD
2018-11 |
CD
2019-02 |
JWG 1 | Geoff Stapleton | 2020-12 |
IEC TS 62257-5 ED3
Renewable energy and hybrid systems for rural electrification - Part 5: Protection against electrical hazards
|
82/1522/RR | 2018-11 |
ACD
2018-11 |
CD
2019-02 |
JWG 1 | Geoff Stapleton | 2020-12 |
IEC TS 62257-6 ED3
Renewable energy and hybrid systems for rural electrification - Part 6: Acceptance, operation, maintenance and replacement
|
82/1523/RR | 2018-11 |
ACD
2018-11 |
CD
2019-03 |
JWG 1 | Sicheng Wang | 2020-12 |
IEC TS 62257-7-2 ED1
Renewable energy and hybrid systems for rural electrification – Part 7-2: Generator set – Off-grid wind turbines
|
82/1562/CD | 2018-11 |
TDTS
2019-12 |
CDTS
2020-01 |
JWG 1 | Charlie Dou | 2020-12 |
IEC TS 62257-9-1 ED3
Renewable energy and hybrid systems for rural electrification - Part 9-1: Integrated systems - Micropower systems
|
82/1610/RR | 2019-07 |
ACD
2019-07 |
CD
2020-05 |
JWG 1 | Geoff Stapleton | 2021-07 |
IEC TS 62257-9-4 ED3
Renewable energy and hybrid systems for rural electrification - Part 9-4: Integrated systems - User installation
|
82/1611/RR | 2019-07 |
ACD
2019-07 |
CD
2019-12 |
JWG 1 | Geoff Stapleton | 2020-12 |
IEC TS 62257-9-5 ED5
Renewable energy and hybrid systems for rural electrification - Part 9-5: Integrated systems - Laboratory evaluation of stand-alone renewable energy products for rural electrification
|
82/1612/RR | 2019-07 |
ACD
2019-07 |
CD
2019-10 |
JWG 1 | Arne Jacobson | 2020-12 |
IEC TS 62257-9-8 ED1
Renewable energy and hybrid systems for rural electrification – Part 9-8: Integrated systems – Quality standards for stand-alone renewable energy products with power ratings less than or equal to 350 W
|
82/1643/DTS | 2018-09 |
CDTS
2019-11 |
PRVDTS
2020-01 |
JWG 1 | Arne Jacobson | 2020-09 |
IEC TS 62257-12-1 ED3
Renewable energy and hybrid systems for rural electrification - Part 12-1: Recommendations for selection of lamps and lighting appliances for off-grid electricity systems
|
82/1617/DTS |
2018-11 |
APUB
2019-11 |
TPUB
2019-12 |
JWG 1 | Arne Jacobson | 2020-04 |
IEC 62446-1 ED2
Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 1: Grid connected systems - Documentation, commissioning tests and inspection
|
82/1601/RR | 2019-06 |
ACD
2019-06 |
CD
2020-05 |
WG 3 | Martin Cotterell | 2021-08 |
IEC 62446-2 ED1
Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 2: Grid connected systems - Maintenance of PV systems
|
82/1656/FDIS | 2015-08 |
CFDIS
2019-12 |
PRVD
2020-01 |
WG 3 | Greg Ball | 2020-04 |
IEC 62548 ED2
Photovoltaic (PV) arrays - Design requirements
|
82/1514/RR | 2018-11 |
ACD
2018-11 |
CD
2019-09 |
WG 3 | Ted Spooner | 2021-04 |
IEC 62759-1 ED2
Photovoltaic (PV) modules - Transportation testing - Part 1: Transportation and shipping of module package units
|
82/1515/RR | 2018-11 |
ACD
2018-11 |
CD
2019-04 |
WG 2 | Guido Volberg | 2020-12 |
IEC 62787 ED1
Concentrator photovoltaic (CPV) solar cells and cell-on-carrier (COC) assemblies - Reliability qualification
|
82/1602/CDV | 2012-02 |
AFDIS
2019-11 |
TFDIS
2020-03 |
WG 7 | Carlos Algora del Valle | 2020-11 |
IEC 62788-1-1 ED1
Measurement procedures for materials used in photovoltaic modules – Part 1-1: Encapsulants – Polymeric materials used for encapsulants
|
82/1655/CD | 2019-06 |
CD
2019-12 |
PCC
2020-01 |
WG 2 | David Miller | 2021-01 |
IEC 62788-1-4/AMD1 ED1
Amendment 1 - Measurement procedures for materials used in photovoltaic modules - Part 1-4: Encapsulants - Measurement of optical transmittance and calculation of the solar-weighted photon transmittance, yellowness index, and UV cut-off wavelength
|
82/1615/CDV | 2018-11 |
PRVC
2019-12 |
2020-02 |
WG 2 | David Miller | 2020-10 |
IEC 62788-1-6/AMD1 ED1
Amendment 1 - Measurement procedures for materials used in photovoltaic modules - Part 1-6: Encapsulants - Test methods for determining the degree of cure in Ethylene-Vinyl Acetate
|
82/1572/CDV | 2017-06 |
TFDIS
2019-11 |
DECFDIS
2020-01 |
WG 2 | David Miller | 2020-07 |
IEC 62788-1-7 ED1
Measurement procedures for materials used in photovoltaic modules – Part 1-7: Test procedure for the optical durability of transparent polymeric PV packaging materials
|
82/1360/CDV | 2016-04 |
RFDIS
2019-11 |
CFDIS
2020-01 |
WG 2 | David Miller | 2020-04 |
IEC TS 62788-2/AMD1 ED1
Amendment 1 - Measurement procedures for materials used in photovoltaic modules - Part 2: Polymeric materials - Frontsheets and backsheets
|
82/1650/RR | 2019-11 |
ACD
2019-11 |
CD
2020-09 |
WG 2 | Jürgen Jung | 2021-06 |
IEC 62788-2-1 ED1
Measurement procedures for materials used in photovoltaic modules - Part 2-1: Polymeric materials - Frontsheet and backsheet - Safety requirements
|
82/1653/CD | 2019-04 |
CD
2019-11 |
PCC
2020-02 |
WG 2 | Jürgen Jung | 2021-04 |
IEC 62788-5-1 ED1
Measurement procedures for materials used in photovoltaic modules - Part 5-1: Edge seals - Suggested test methods for use with edge seal materials
|
82/1466/CDV | 2016-07 |
RFDIS
2019-10 |
CFDIS
2020-01 |
WG 2 | Michael Kempe | 2020-04 |
IEC TS 62788-5-2 ED1
Measurement procedures for materials used in photovoltaic modules - Part 5-2: Edge seals - Edge-seal durability evaluation guideline
|
82/1465/CD | 2016-07 |
TDTS
2019-12 |
CDTS
2020-01 |
WG 2 | Michael Kempe | 2021-02 |
IEC 62788-6-2 ED1
Measurement procedures for materials used in photovoltaic modules - Part 6-2: General tests - Moisture permeation testing with polymeric materials
|
82/1467/CDV | 2016-07 |
RFDIS
2019-10 |
CFDIS
2020-01 |
WG 2 | Michael Kempe | 2020-04 |
IEC TS 62788-6-3 ED1
Measurement procedures for materials used in photovoltaic modules - Part 6-3: Adhesion testing of interfaces within PV modules
|
82/1435/CD | 2017-05 |
ADTS
2018-09 |
TDTS
2018-11 |
WG 2 | Nick Bosco | 2020-12 |
IEC 62788-7-3 ED1
Measurement procedures for materials used in photovoltaic modules - Part 7-3: Environmental exposures - Accelerated abrasion tests of PV module external surfaces
|
82/1591/CD | 2018-02 |
ACDV
2019-08 |
TCDV
2019-10 |
WG 2 | David Miller | 2020-12 |
IEC 62790/AMD1 ED1
Amendment 1 - Junction boxes for photovoltaic modules - Safety requirements and tests
|
82/1434/CDV | 2016-09 |
RFDIS
2019-11 |
CFDIS
2020-01 |
WG 2 | Guido Volberg | 2020-04 |
IEC TS 62804-1-1 ED1
Photovoltaic (PV) modules - Test methods for the detection of potential-induced degradation - Part 1-1: Crystalline silicon - Delamination
|
82/1566/DTS |
2017-06 |
BPUB
2019-11 |
PPUB
2020-01 |
WG 2 | Peter Hacke | 2020-01 |
IEC TS 62804-2 ED1
Photovoltaic (PV) modules - Test methods for the detection of potential-induced degradation - Part 2: Thin-film
|
82/1574/CD | 2016-02 |
CDM
2019-07 |
2019-11 |
WG 2 | Peter Hacke | 2020-12 |
IEC 62852/AMD1 ED1
Amendment 1 - Connectors for DC-application in photovoltaic systems - Safety requirements and tests
|
82/1646/FDIS | 2017-09 |
CFDIS
2019-11 |
PRVD
2020-01 |
WG 2 | Guido Volberg | 2020-03 |
IEC 62891 ED1
Overall efficiency of grid connected photovoltaic inverters
|
82/866/CDV | 2013-08 |
AFDIS
2015-01 |
TFDIS
2019-01 |
WG 6 | Vicente Salas Merino | 2020-08 |
IEC TS 62910 ED2
Utility-interconnected photovoltaic inverters - Test procedure for under voltage ride-through measurements
|
82/1607/DTS |
2018-11 |
APUB
2019-10 |
TPUB
2019-12 |
WG 6 | Chenhui Niu | 2020-05 |
IEC TS 62915 ED2
Photovoltaic (PV) modules - Type approval, design and safety qualification - Retesting
|
82/1651/RR | 2019-11 |
ACD
2019-11 |
CD
2020-09 |
WG 2 | Itai Suez | 2021-05 |
IEC 62920/AMD1 ED1
Amendment 1 - Photovoltaic power generating systems - EMC requirements and test methods for power conversion equipment
|
82/1613/RR | 2019-07 |
ACD
2019-07 |
CD
2020-05 |
WG 6 | Yasutoshi Yoshioka | 2021-06 |
IEC 62938 ED1
Non-uniform snow load testing for photovoltaic (PV) modules
|
82/1195/CDV | 2014-05 |
DECFDIS
2019-12 |
RFDIS
2019-12 |
WG 2 | John Wohlgemuth | 2020-06 |
IEC 63027 ED1
DC arc detection and interruption in photovoltaic power systems
|
82/1636/CDV | 2015-08 |
CCDV
2019-11 |
PRVC
2020-01 |
WG 6 | Nicolas Bogdanski | 2020-12 |
IEC 63092-1 ED1
Photovoltaics in buildings – Part 1: Building integrated photovoltaic modules
|
82/1626/CDV | 2016-10 |
CCDV
2019-10 |
PRVC
2020-01 |
PT 63092 | Thomas Moran | 2020-12 |
IEC 63092-2 ED1
Photovoltaics in buildings – Part 2: Building integrated photovoltaic systems
|
82/1627/CDV | 2015-01 |
CCDV
2019-10 |
PRVC
2020-01 |
PT 63092 | Thomas Moran | 2020-12 |
IEC 63104 ED1
Solar trackers - Safety requirements
|
82/1427/CD | 2016-12 |
CDM
2018-08 |
2018-11 |
WG 7 | Shitao Wang | 2021-03 |
IEC TS 63106-1 ED1
Basic requirements for simulator used for testing of photovoltaic power conversion equipment - Part 1: a.c. power simulator
|
82/1481/CD | 2016-12 |
CDM
2019-01 |
2019-06 |
WG 6 | Hirofumi SHINOHARA | 2020-12 |
IEC TS 63106-2 ED1
Basic requirements for simulator used for testing of photovoltaic power conversion equipment - Part 2: d.c. power simulator
|
82/1482/CD | 2016-12 |
CDM
2019-01 |
2019-06 |
WG 6 | Hirofumi SHINOHARA | 2020-12 |
IEC TS 63109 ED1
Measurement of diode ideality factor by quantitative analysis of electroluminescence images
|
82/1538/NP | 2019-04 |
ACD
2019-04 |
CD
2019-11 |
WG 2 | Keizo ASAOKA | 2021-09 |
IEC 63112 ED1
Safety, functionality and classification of Photovoltaic Earth Fault Protection (PV EFP) equipment
|
82/1621/CD | 2017-02 |
ACDV
2019-11 |
TCDV
2020-06 |
WG 6 | Jim Eichner | 2021-02 |
IEC TS 63126 ED1
Guidelines for qualifying PV modules, components and materials for operation at high temperatures
|
82/1662/DTS | 2017-03 |
CDTS
2019-12 |
PRVDTS
2020-03 |
WG 2 | Kent Whitfield | 2020-11 |
IEC TS 63140 ED1
Photovoltaic (PV) modules – Partial shade endurance testing for monolithically integrated products
|
82/1448/CD | 2017-06 |
ACD
2019-07 |
2CD
2019-08 |
WG 2 | Timothy Silverman | 2020-12 |
IEC TS 63156 ED1
Photovoltaic systems – Power conditioners - Energy evaluation method
|
82/1446/CD | 2017-09 |
CDM
2018-09 |
2018-11 |
WG 6 | Shuichi Sugahara | 2020-12 |
IEC 63163 ED1
Terrestrial photovoltaic (PV) modules for consumer products - Design qualification and type approval
|
82/1647/CD | 2017-10 |
CD
2019-11 |
PCC
2020-02 |
WG 2 | Paul Robusto | 2021-02 |
IEC TS 63202-2 ED1
Photovoltaic cells - Part 2: Electroluminescence image for crystalline silicon solar cells
|
82/1486/CD | 2018-05 |
ADTS
2019-01 |
TDTS
2019-07 |
WG 8 | Christos Monokroussos | 2020-12 |
IEC TS 63209 ED1
Extended-stress testing of photovoltaic modules for risk analysis
|
82/1592/CD | 2018-08 |
ADTS
2019-08 |
TDTS
2019-10 |
WG 2 | Sarah Kurtz | 2020-12 |
IEC TR 63217 ED1
Utility-interconnected photovoltaic (PV) inverters – Test procedure of high-voltage ride-through measurements
|
82/1480/CD | 2018-09 |
ADTR
2019-01 |
TDTR
2019-04 |
2020-10 | ||
IEC TR 63226 ED1
Managing risk related to photovoltaic (PV) systems on buildings
|
82/1500/DTR |
2018-11 |
APUB
2019-01 |
TPUB
2019-05 |
2020-05 | ||
IEC TR 63227 ED1
Lightning and surge voltage protection for photovoltaic (PV) power supply systems
|
82/1501/DTR |
2018-11 |
APUB
2019-01 |
TPUB
2019-05 |
2020-05 | ||
IEC 63257 ED1
Power line communication for DC shutdown equipment
|
82/1585/NP | 2019-07 |
ACD
2019-07 |
CD
2019-12 |
WG 6 | Christian Fasthuber | 2021-12 |
IEC TS 63265 ED1
Reliability practices for the operation of photovoltaic power systems
|
82/1598/NP | 2019-08 |
ACD
2019-08 |
CD
2020-03 |
WG 3 | Roger Hill | 2021-03 |
IEC TR 63279 ED1
Sequential and combined accelerated stress testing for de-risking photovoltaic modules
|
82/1657/DTR | 2019-12 |
CDTR
2019-12 |
PRVDTR
2020-02 |
2020-10 |
