TC 3

Documentation, graphical symbols and representations of technical information

 
export to xls file

TC 3 Work programme (13)

Project

Reference

Document

Reference

Init.

Date

Current

Stage

Next

Stage

Working

Group

Project

Leader

Fcst. Publ.

Date

PNW TS 3-1471 ED1

Representation of communication in power utility automation

3/1471/NP PNW
  • PNW
  • New work item proposal

2020-12

PRVN
  • PRVN
  • Preparation of RVN

2021-03

JWG 17 Thomas Borglin 2022-08
PNW 3-1473 ED1

Industrial systems, installations and equipment and industrial products -- Structuring principles and reference designations -- Part 101: Power plants -- Modelling concepts and guidelines

3/1473/NP PNW
  • PNW
  • New work item proposal

2021-01

PRVN
  • PRVN
  • Preparation of RVN

2021-04

Eirik Selvik 2021-11
IEC 60152 ED2

Designation of phase differences by hour numbers in three-phase AC systems

3/1459/CDV 2019-12 AFDIS
  • AFDIS
  • Approved for FDIS

2021-02

DECFDIS
  • DECFDIS
  • FDIS at editing check

2021-03

MT 23 Eirik Selvik 2021-09
IEC 60445 ED7

Basic and safety principles for man-machine interface, marking and identification - Identification of equipment terminals, conductor terminations and conductors

3/1461/CDV 2020-03 PRVC
  • PRVC
  • Preparation of RVC

2021-02

2021-05

MT 22 Eirik Selvik 2022-01
IEC 60617 ED0

Maintenance of IEC 60617 through the corresponding database. See report on recently processed change requests and symbols.

SPE
  • SPE

2000-01

IEC 60757 ED2

Code for designation of colours

3/1457/CDV 2019-12 AFDIS
  • AFDIS
  • Approved for FDIS

2021-02

DECFDIS
  • DECFDIS
  • FDIS at editing check

2021-03

MT 23 Eirik Selvik 2021-09
IEC 61666/AMD1 ED2

Amendment 1 - Industrial systems, installations and equipment and industrial products - Identification of terminals within a system

3/1453/CDV 2019-12 RFDIS
  • RFDIS
  • FDIS received and registered

2021-02

CFDIS
  • CFDIS
  • Draft circulated as FDIS

2021-05

MT 61666 Eirik Selvik 2021-08
IEC TR 63266 ED1

Documentation of communication in power utility automation

3/1416/DTR

2019-08 BPUB
  • BPUB
  • Being published

2020-08

PPUB
  • PPUB
  • Publication issued

2020-09

2021-03
IEC TR 63358-1 ED1

GRAPHICAL SYMBOLS FOR DIAGRAMS - Part 1: General, qualifying and generic symbols

3/1469/CD 2020-11 ADTR
  • ADTR
  • Approved for DTR

2021-02

TDTR
  • TDTR
  • Translation of DTR

2021-04

2021-12
IEC 81346-1 ED2

Industrial systems, installations and equipment and industrial products - Structuring principles and reference designations - Part 1: Basic rules

3/1463/CDV 2018-10 PRVC
  • PRVC
  • Preparation of RVC

2021-02

2021-05

MT 81346 Eirik Selvik 2022-01
IEC 81355-1 ED1

Classification and designation of documents for plants, systems and equipment - Part 1: Rules and classification tables

3/1470/RR 2020-12 ACD
  • ACD
  • Approved for CD

2020-12

CD
  • CD
  • Draft circulated as CD

2021-09

JWG 18 Henrik Balslev 2023-10
IEC 82045-2 ED2

Document management - Part 2: Metadata elements and information reference model

3/1438/RR 2019-12 ACD
  • ACD
  • Approved for CD

2019-12

CD
  • CD
  • Draft circulated as CD

2021-03

MT 82045 Thomas Borglin 2022-05
ISO TS 81346-10 ED2

Industrial systems, installations and equipment and industrial products - Structuring principles and reference designation - Part 10: Power plants

3/1455/CD 2020-08 CDM
  • CDM
  • CD to be discussed at meeting

2020-10

2021-01

MT 81346 Eirik Selvik 2022-12