International Standards and Conformity Assessment for all electrical, electronic and related technologies

SC 8B

Decentralized Electrical Energy Systems

 
export to xls file

SC 8B Work programme (8)

Project

Reference

Document

Reference

Init.

Date

Current

Stage

Next

Stage

Working

Group

Project

Leader

Fcst. Publ.

Date

PWI TR 8B-1

Decentralized electrical energy systems roadmap

PWI
  • PWI
  • Preliminary Work Item

2019-10

2021-12

PNW TS 8B-61

Guideline for the planning and design of the decentralized direct current distribution systems

8B/61/NP 2020-07 PRVN
  • PRVN
  • Preparation of RVN document

2020-10

2020-11

2024-06
PNW TS 8B-65 ED1

Microgrids – Technical requirements – Monitoring and Control systems

8B/65/NP PNW
  • PNW
  • New Work Item Proposal

2020-10

PRVN
  • PRVN
  • Preparation of RVN document

2021-01

WG 3 Peng Li 2023-08
IEC TS 62898-3-2 ED1

Microgrids – Part 3-2: Technical requirements - Energy management systems

8B/54/CD 2018-03 CDM
  • CDM
  • CD to be discussed at Meeting

2020-05

2020-10

WG 3 Xavier YANG 2022-12
IEC TS 62898-3-3 ED1

Microgrids - Part 3-3: Technical requirements – Self-regulation of dispatchable loads

8B/63/CD 2018-03 CD
  • CD
  • Draft circulated as CD

2020-09

PCC
  • PCC
  • Preparation of CC document

2020-10

WG 1 Zhaohong Bie 2021-12
IEC 63189-1 ED1

Virtual Power Plants- Part 1: Architecture and Functional Requirements

8B/62/CD 2018-03 PCC
  • PCC
  • Preparation of CC

2020-10

2020-10

WG 4 Jian Su 2021-12
IEC TS 63189-2 ED1

Virtual Power Plants- Part 2: Use Cases

8B/64/CD 2018-03 CD
  • CD
  • Draft circulated as CD

2020-09

PCC
  • PCC
  • Preparation of CC document

2020-12

WG 4 Xuanyuan Wang 2022-12
IEC TS 63276 ED1

Guideline for the hosting capacity evaluation of distribution networks for distributed generations

8B/42/NP 2019-11 ACD
  • ACD
  • Approved for CD

2019-11

CD
  • CD
  • Draft circulated as CD

2021-06

PT 63276 Zheyi Pei 2023-05