International Standards and Conformity Assessment for all electrical, electronic and related technologies

SC 23A

Cable management systems

 
export to xls file

SC 23A Work programme (6)

Project

Reference

Document

Reference

Init.

Date

Current

Stage

Next

Stage

Working

Group

Project

Leader

Fcst. Publ.

Date

IEC 61386-21 ED2

Conduit systems for cable management - Part 21: Particular requirements - Rigid conduit systems

23A/895/CD 2019-11 TCDV
  • TCDV
  • Translation of CDV

2020-05

CCDV
  • CCDV
  • Draft circulated as CDV

2020-07

MT 13 Ian Gibson 2021-08
IEC 61386-22 ED2

Conduit Systems for cable management - Part 22: Particular requirements - Pliable conduit systems

23A/896/CD 2019-11 TCDV
  • TCDV
  • Translation of CDV

2020-05

CCDV
  • CCDV
  • Draft circulated as CDV

2020-07

MT 13 Ian Gibson 2021-08
IEC 61386-23 ED2

Conduit systems for cable management - Part 23: Particular requirements - Flexible conduit systems

23A/897/CD 2019-11 TCDV
  • TCDV
  • Translation of CDV

2020-05

CCDV
  • CCDV
  • Draft circulated as CDV

2020-07

MT 13 Ian Gibson 2021-08
IEC 61534-1/AMD2 ED2

Amendment 2 - Powertrack systems - Part 1: General requirements

23A/903/FDIS 2019-01 CFDIS
  • CFDIS
  • Draft circulated as FDIS

2020-04

PRVD
  • PRVD
  • Preparation of RVD document

2020-06

MT 15 Alan Cooper 2020-08
IEC 61537 ED3

Cable management - Cable tray systems and cable ladder systems

23A/880/CD 2015-06 ACDV
  • ACDV
  • Approved for CDV

2019-03

TCDV
  • TCDV
  • Translation of CDV

2019-10

MT 12 Alan Cooper 2021-05
IEC 61914 ED3

Cable cleats for electrical installations

23A/894/CD 2019-01 ACDV
  • ACDV
  • Approved for CDV

2020-03

TCDV
  • TCDV
  • Translation of CDV

2020-07

MT 16 Steve Boyd 2021-05