International Standards and Conformity Assessment for all electrical, electronic and related technologies

SC 45A

Instrumentation, control and electrical power systems of nuclear facilities

 
export to xls file

SC 45A Work programme (28)

Project

Reference

Document

Reference

Init.

Date

Current

Stage

Next

Stage

Working

Group

Project

Leader

Fcst. Publ.

Date

PWI 45A-6 ED1

Obsolescence management for digital and programmable I&C in nuclear power plant

PWI
  • PWI
  • Preliminary Work Item

2002-10

prePNW
  • prePNW
  • Preparation of NP document

PWI 45a-3 ED1

Management of aging of nuclear power plant connectors

PWI
  • PWI
  • Preliminary Work Item

2002-10

prePNW
  • prePNW
  • Preparation of NP document

PWI 45a-4 ED1

Management of aging of nuclear power plant relays

PWI
  • PWI
  • Preliminary Work Item

2002-10

prePNW
  • prePNW
  • Preparation of NP document

PWI 45a-5 ED1

Management of aging of nuclear power plant electronics

PWI
  • PWI
  • Preliminary Work Item

2002-10

prePNW
  • prePNW
  • Preparation of NP document

IEC 60910 ED2

Nuclear power plants - Instrumentation systems important to safety - Containment monitoring for early detection of developing deviations from normal operation in light water reactors

45A/1246/CD 2017-11 CD
  • CD
  • Draft circulated as CD

2018-11

PCC
  • PCC
  • Preparation of CC document

2019-02

WG 5 Hunter Browning-Smith 2020-12
IEC/IEEE 60980-344 ED1

Nuclear facilities - Equipment important to safety - Seismic qualification

45A/1225/CD 2018-07 ACD
  • ACD
  • Approved for CD

2018-11

2CD
  • 2CD

2019-01

WG 9 Karim Hamidi-Georges 2021-06
IEC 60987 ED3

Nuclear power plants - Instrumentation and control systems important to safety - Hardware design requirements

45A/1243/CD 2018-11 CD
  • CD
  • Draft circulated as CD

2018-11

PCC
  • PCC
  • Preparation of CC document

2019-01

WG 3 Julien Bach 2020-06
IEC 61031 ED2

Nuclear power plants - Instrumentation and control systems - Design, location and application criteria for installed area gamma radiation dose rate monitoring equipment for use during normal operation and anticipated operational occurrences

45A/1107/CD 2015-10 CDM
  • CDM
  • CD to be discussed at meeting

2017-02

2017-11

WG 5 H. Nishizawa 2020-01
IEC 61225 ED3

Nuclear power plants - Instrumentation, control and electrical power systems - Requirements for static uninterruptible DC and AC power supply systems

45A/1235/FDIS


2015-05 BPUB
  • BPUB
  • Being published

2018-11

PPUB
  • PPUB
  • Publication published

2019-01

WG 11 L. Fredlund 2019-01
IEC 61226 ED4

Nuclear power plants - Instrumentation, control and electrical power systems important to safety - Categorization of functions and classification of systems

45A/1221/CDV 2014-03 CCDV
  • CCDV
  • Draft circulated as CDV

2018-09

PRVC
  • PRVC
  • Preparation of RVC

2018-12

WG 7 J. Barbaud 2019-11
IEC 61468 ED2

Nuclear power plants - Instrumentation systems important to safety - In-core instrumentation - Characteristics and test methods of self-powered neutron detectors

45A/1232/CD 2018-08 CD
  • CD
  • Draft circulated as CD

2018-09

PCC
  • PCC
  • Preparation of CC document

2018-12

WG 2 IVAN KRIVONOSOV 2020-09
IEC 62003 ED2

Nuclear power plants - Instrumentation, control, and electrical power systems important to safety - Requirements for electromagnetic compatibility testing

45A/1196/CDV 2014-09 AFDIS
  • AFDIS
  • Approved for FDIS

2018-10

TFDIS
  • TFDIS
  • Translation of FDIS

2019-06

WG 9 C. Kiger 2020-02
IEC 62566-2 ED1

Nuclear power plants - Instrumentation and control systems important to safety - Development of HDL-programmed integrated circuits - Part 2: HDL-programmed integrated circuits for systems performing category B or C functions

45A/1212/CDV 2016-07 AFDIS
  • AFDIS
  • Approved for FDIS

2018-11

TFDIS
  • TFDIS
  • Translation of FDIS

2019-07

WG 3 Alexander WIGG 2020-03
IEC/IEEE 62582-1 ED2

Nuclear power plants - Instrumentation and control important to safety - Electrical equipment condition monitoring methods - Part 1: General

45A/1239/RR 2018-11 ACD
  • ACD
  • Approved for CD

2018-10

CD
  • CD
  • Draft circulated as CD

2019-08

WG 10 Sven Olof Palm 2021-09
IEC/IEEE 62582-2 ED2

Nuclear power plants - Instrumentation and control important to safety - Electrical equipment condition monitoring methods - Part 2: Indenter modulus

45A/1240/RR 2018-11 ACD
  • ACD
  • Approved for CD

2018-10

CD
  • CD
  • Draft circulated as CD

2019-08

WG 10 Sven Olof Palm 2021-06
IEC/IEEE 62582-4 ED2

Nuclear power plants - Instrumentation and control important to safety - Electrical equipment condition monitoring methods - Part 4: Oxidation induction techniques

45A/1241/RR 2018-11 ACD
  • ACD
  • Approved for CD

2018-10

CD
  • CD
  • Draft circulated as CD

2019-08

WG 10 Sven Olof Palm 2021-06
IEC/IEEE 62582-6 ED1

Nuclear power plants - Instrumentation and control important to safety - Electrical equipment condition monitoring methods - Part 6: Insulation resistance

45A/1180/CDV 2016-04 RFDIS
  • RFDIS
  • FDIS received and registered

2018-11

CFDIS
  • CFDIS
  • Draft circulated as FDIS

2019-02

WG 10 K. Spang/J. White 2019-05
IEC 62645 ED2

Nuclear power plants - Instrumentation, control and electrical power systems - Cybersecurity requirements

45A/1219/CDV 2015-03 PRVC
  • PRVC
  • Preparation of RVC

2018-12

2019-03

WG 9 T.Quinn/L.Pietre-C/T.Walter 2019-11
IEC 62765-2 ED1

Nuclear power plants - Instrumentation and control important to safety - Management of ageing of sensors and transmitters - Part 2: Temperature sensors

45A/1218/FDIS


2015-07 BPUB
  • BPUB
  • Being published

2018-09

PPUB
  • PPUB
  • Publication published

2018-10

WG 10 O.-P. Zhu 2018-12
IEC 62859/AMD1 ED1

Amendment 1 - Nuclear power plants - Instrumentation and control systems - Requirements for coordinating safety and cybersecurity

45A/1249/RR 2018-11 TCDV
  • TCDV
  • Translation of CDV

2018-12

CCDV
  • CCDV
  • Draft circulated as CDV

2019-01

WG 9 Ludovic Pietre-Cambacedes 2020-03
IEC 62954 ED1

Nuclear power plants - Control rooms - Requirements for emergency response facilities

45A/1236/FDIS


2014-09 BPUB
  • BPUB
  • Being published

2018-11

PPUB
  • PPUB
  • Publication published

2019-01

WG 8 Parsons/Dall'Agnol/Blas 2019-01
IEC 63046 ED1

Nuclear power plants - Electrical systems - General requirements

45A/1238/CD 2016-02 CD
  • CD
  • Draft circulated as CD

2018-10

PCC
  • PCC
  • Preparation of CC document

2019-01

WG 11 J.-M. Haure 2020-02
IEC 63096 ED1

Nuclear power plants - Instrumentation, control and electrical power systems - Security controls

45A/1191/CD 2016-11 ACD
  • ACD
  • Approved for CD

2018-07

2CD
  • 2CD

2018-11

WG 9 J. Bochtler/T. Quinn 2020-07
IEC/IEEE 63113 ED1

Nuclear facilities - Instrumentation important to safety - Spent fuel pool instrumentation

45A/1202/CD 2017-02 CDM
  • CDM
  • CD to be discussed at meeting

2018-09

2019-05

WG 5 Gary L. Johnson 2021-06
IEC 63160 ED1

Nuclear power plants – Instrumentation, control and electrical power systems important to safety - Common cause failure systems analysis and diversity

45A/1166/NP 2017-09 ACD
  • ACD
  • Approved for CD

2017-09

CD
  • CD
  • Draft circulated as CD

2018-05

WG 7 Nick Wall 2020-09
IEC 63186 ED1

Nuclear power plants - Instrumentation and control systems important to safety - Recommended design criteria for seismic trip system

45A/1178/NP 2018-02 ACD
  • ACD
  • Approved for CD

2018-02

CD
  • CD
  • Draft circulated as CD

2019-05

WG 2 Daowei Bi 2022-07
IEC TR 63192 ED1

Nuclear power plants – Instrumentation and control systems important to safety – Hazard analysis: A review of current approaches

45A/1197/DTR

2018-03 BPUB
  • BPUB
  • Publication being printed

2018-12

PPUB
  • PPUB
  • Publication published

2019-01

2019-01
IEC TR 63214 ED1

Nuclear Power Plants - Control rooms - Human Factor Engineering

45A/1226/DTR

2018-09 APUB
  • APUB
  • Approved for publication

2018-11

TPUB
  • TPUB
  • Translation of publication

2019-07

2019-11