TC 99

Insulation co-ordination and system engineering of high voltage electrical power installations above 1,0 kV AC and 1,5 kV DC

 
export to xls file

TC 99 Work programme (5)

Project

Reference

Document

Reference

Init.

Date

Current

Stage

Next

Stage

Working

Group

Project

Leader

Fcst. Publ.

Date

PWI 99-2

Drafting an outline of a safety principles document for high voltage equipment and installations

PWI
  • PWI
  • Preliminary Work Item

2018-12

prePNW
  • prePNW
  • Preparation of NP document

2019-03

IEC 60071-1 ED9

Insulation co-ordination - Part 1: Definitions, principles and rules (Proposed horizontal standard)

99/199/CDV 2016-12 APUB
  • APUB
  • Approved for publication

2019-02

2019-05

MT 10 Eung-Bo Shim 2019-11
IEC 60071-2 ED5

Insulation co-ordination - Part 2: Application guidelines (Proposed horizontal standard)

99/224/RR 2018-11 ACD
  • ACD
  • Approved for CD

2018-11

CD
  • CD
  • Draft circulated as CD

2019-11

MT 9 Eiichi Zaima 2021-11
IEC 61936-1 ED3

Power installations exceeding 1 kV AC and 1,5 kV DC - Part 1: AC

99/226/CD 2019-01 CD
  • CD
  • Draft circulated as CD

2019-01

PCC
  • PCC
  • Preparation of CC document

2019-04

MT 4 Lars Hansson 2020-12
IEC 61936-2 ED1

Power installations exceeding 1 kV a.c. and 1,5 kV d.c. - Part 2: d.c.

99/168/RR 2017-06 ACD
  • ACD
  • Approved for CD

2017-06

CD
  • CD
  • Draft circulated as CD

2019-10

JMT 7 Leslie Brand 2020-04