TC 4 |
Hydraulic turbines |

Convenor | NationalCommittee | |
---|---|---|
Mr Yuji Hamaoka | JP | |
Mr Francois Sergerie | CA |
Member | NationalCommittee |
---|---|
Peter Altzar | SE |
Mr Robert Arseneault | CA |
Mr Francois Boulet | CA |
Mr Stéphane Herbivo | FR |
Mr Jie LIU | CN |
Mr Gongmei Liu | CN |
Mr Michael Markovich | CA |
Mr Kiyoshi Matsumoto | JP |
Mr Alexander Mosbacher | AT |
Mr Eldar Nezametdinov | RU |
Mr Franco Podio | IT |
Mr Stephane Roy | CA |
Mr Gerhard Salcher | DE |
Mr Ronald L Stringfellow | US |
Mr Masaru Takagi | JP |
Mr Robert Wäckerle | DE |
Title & Task
WG 30
Guide for Installation procedures of hydropower machines
To deliver a new document giving guidelines for vertical large Francis turbine or pump-turbine (discharge diameter of runner >4m) and semi-umbrella type generators (IM82xx series and IM83xx series according to IEC60034-7 Rev. 4):
• providing tolerances as standard guideline to equipment installation;
• and additionally to provide sufficient technical clarification information , to aid even less experienced engineers understand the WHY of the proposed approaches.
These objectives to be achieved by:
• developing generic installation method since there are many installation methods;
• describing the installation method by flow charts;
• adding explanations on work at each step, indicating important points in conducting the work and recommendations;
• including figures and recommendations.
