International Standards and Conformity Assessment for all electrical, electronic and related technologies

SC 17B

Low-voltage switchgear and controlgear

 

Vote for P-Members

P-Members

Voting
P-Members

In favour
In favour %
Criteria
Result
22 21 95.5 >=66.7% APPROVED

All Votes

Total

Votes Cast
Total

Against
Against %
Criteria
Result
28 1 3.6 <=25% APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document 17B/1839A/FDIS

 

Project : IEC 62626-1 Ed. 1.0

IEC 62626-1 Ed.1: Low-voltage switchgear and controlgear enclosed equipment - Part 1: Enclosed switch-disconnectors outside the scope of IEC 60947-3 to provide isolation during repair and maintenance work

 

Reference Circulation date Closing date Downloads
17B/1839A/FDIS 2013-11-22 2014-01-17


Compilation of Comments
CC file    
Voting Result
121A/3/RVD 2014-01-24  
 
export to xls file

Result of Voting

Country
Status
Received
Vote
Comments
Australia P 2013-12-31 A -
Austria P 2014-01-16 Y -
Belgium O 2013-12-27 A -
Brazil P 2014-01-17 Y -
Canada P 2014-01-15 Y -
China P 2014-01-16 Y -
Croatia O 2014-01-15 Y -
Czech Republic P 2014-01-16 Y -
Denmark P 2014-01-17 A -
Egypt P 2014-01-05 Y -
Finland P 2014-01-15 Y -
France P 2013-12-16 A -
Germany P 2014-01-08 Y -
Greece O 2014-01-15 A -
India P 2014-01-13 Y -
Indonesia P 2014-01-03 Y -
Ireland P 2013-12-04 Y -
Italy P 2013-11-29 Y -
Japan P 2013-12-26 Y -
Korea, Republic of P 2013-12-26 Y -
Latvia - 2014-01-07 A -
Mexico O 2014-01-15 Y -
Netherlands P 2014-01-08 A -
Poland O 2014-01-14 Y -
Portugal O 2014-01-17 A -
Qatar - 2014-01-15 Y -
Russian Federation P 2013-12-25 Y -
Saudi Arabia O 2013-11-25 A -
Serbia P 2014-01-17 Y -
Slovakia O 2014-01-16 Y -
Slovenia P 2014-01-17 Y -
South Africa P 2014-01-17 Y -
Spain P 2013-12-18 Y -
Sweden P 2013-12-16 Y -
Switzerland P 2013-11-26 Y -
Turkey O 2014-01-17 Y -
United Kingdom P 2014-01-10 N Y
United States of America P 2014-01-16 A -

NOTES:



  1. Vote: Does the National Committee agree to publish the FDIS as an International Standard:
    Y = In favour; N = Against; A = Abstention.

  2. Only votes received before the closing date are counted in determining the decision.
    Late Votes: (0).

  3. Abstentions are not taken into account when totalizing the votes.

  4. P-members not voting: (0).


*Comments rejected because they were not submitted in the IEC Comment form.
**Vote rejected due to lack of justification statement.