International Standards and Conformity Assessment for all electrical, electronic and related technologies

SC 17B

Low-voltage switchgear and controlgear

 

Vote for P-Members

P-Members

Voting
P-Members

In favour
In favour %
Criteria
Result
0 0 0 >=66.7% REJECTED

All Votes

Total

Votes Cast
Total

Against
Against %
Criteria
Result
32 4 12.5 <=25% APPROVED

 Illustration: Voting

Voting Result

REJECTED

Document 17B/1766/CDV

 

Project : IEC 60947-7-4 Ed. 1.0

IEC 60947-7-4 Ed.1: Low-voltage switchgear and controlgear - Part 7-4: Ancillary equipment - PCB terminal blocks for copper conductors

 

Reference Circulation date Closing date Downloads
17B/1766/CDV 2012-03-02 2012-08-03
Compilation of Comments
CC file    
Voting Result
17B/1812A/RVC 2013-04-05  
 
export to xls file

Result of Voting

Country
Status
Received
Vote
Comments
Australia P* 2012-07-27 Y -
Austria P* 2012-08-01 A -
Belgium P* 2012-07-12 A -
Brazil P* 2012-08-03 Y -
Canada P* 2012-07-24 Y -
China P* 2012-08-02 Y -
Croatia O* 2012-07-30 Y -
Czech Republic P* 2012-07-26 Y -
Denmark P* 2012-07-13 A -
Egypt P* 2012-07-08 Y -
Finland P* 2012-07-30 A -
France P* 2012-07-10 N Y
Germany P* 2012-07-19 Y Y
Greece O* 2012-06-08 N Y
Hungary P* 2012-08-01 A -
India P* 2012-08-03 Y Y
Indonesia P* 2012-07-16 Y -
Ireland P* 2012-07-23 Y -
Italy P* 2012-07-12 Y -
Japan P* 2012-07-27 Y -
Korea, Republic of P* 2012-07-24 Y -
Malta P* 2012-07-31 A -
Mexico O* 2012-08-02 A -
Netherlands P* 2012-07-17 Y -
Oman O* 2012-08-03 Y -
Poland O* 2012-06-06 Y -
Portugal P* 2012-08-03 Y Y*
Qatar - 2012-08-02 Y -
Romania P* 2012-08-03 Y -
Russian Federation P* 2012-07-20 Y -
Saudi Arabia O* 2012-03-03 A -
Serbia P* 2012-06-14 Y -
Slovenia P* 2012-07-17 Y -
South Africa P* 2012-08-03 Y -
Spain P* 2012-07-02 N Y
Sweden P* 2012-06-20 Y -
Switzerland P* 2012-07-09 Y -
Turkey P* 2012-08-01 Y -
United Kingdom P* 2012-07-05 Y -
United States of America P* 2012-08-01 N Y

NOTES:



  1. Vote: Does the National Committee agree to the circulation of the draft as a FDIS:
    Y = In favour; N = Against; A = Abstention.

  2. Only votes received before the closing date are counted in determining the decision.
    Late Votes: (0).

  3. Abstentions are not taken into account when totalizing the votes.

  4. P-members not voting: (0).


*Comments rejected because they were not submitted in the IEC Comment form.
**Vote rejected due to lack of justification statement.