International Standards and Conformity Assessment for all electrical, electronic and related technologies

SC 86B

Fibre optic interconnecting devices and passive components

 

Vote for P-Members

P-Members
Voting
P-Members
In favour
In favour %
Criteria
Result
19 17 89.5 >=66.7% APPROVED

All Votes

Total
Votes Cast
Total
Against
Against %
Criteria
Result
23 2 8.7 <=25% APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document 86B/3673/CDV

 

Project : IEC 61300-3-53 Ed. 1.0

IEC 61300-3-53/Ed1: Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 3-53: Examinations and Measurements - Encircled angular flux (EAF) measurement method based on two-dimensional far field data from step index multimode waveguide (including fibre)

 

Reference Circulation date Closing date Downloads
86B/3673/CDV 2013-10-25 2014-01-31
Compilation of Comments
CC file    
Voting Result
86B/3757/RVC 2014-02-28  
 
export to xls file

Result of Voting

Country
Status
Received
Vote
Comments
Australia P 2013-12-10 Y -
Austria P 2014-01-24 Y -
Belgium P 2014-01-07 Y -
Brazil O 2014-01-31 A -
Canada P 2014-01-23 Y -
China P 2014-01-28 Y -
Czech Republic P 2014-01-02 Y -
Denmark P 2014-01-29 A -
Finland P 2014-01-30 Y -
France P 2014-01-27 Y -
Germany P 2014-01-13 Y -
Greece O 2014-01-29 Y -
Ireland O 2013-12-04 Y -
Israel P 2014-01-30 A -
Italy P 2014-01-31 Y Y
Japan P 2014-01-27 N Y
Korea, Republic of P 2013-12-26 Y -
Mexico P 2014-01-30 Y -
Netherlands P 2014-01-23 Y -
Pakistan P
Poland P 2014-01-29 Y -
Portugal P 2014-01-31 A -
Qatar - 2014-01-29 A -
Romania O 2014-01-31 Y -
Russian Federation P 2014-01-31 Y -
Spain O 2014-01-09 Y -
Sweden P 2014-01-28 A -
Switzerland P 2014-01-22 A -
Thailand P 2014-01-30 Y -
United Kingdom P 2014-01-07 N Y
United States of America P 2014-01-28 Y -

NOTES:



  1. Vote: Does the National Committee agree to the circulation of the draft as a FDIS:
    Y = In favour; N = Against; A = Abstention.

  2. Only votes received before the closing date are counted in determining the decision.
    Late Votes: (0).

  3. Abstentions are not taken into account when totalizing the votes.

  4. P-members not voting: Pakistan(1).


*Comments rejected because they were not submitted in the IEC Comment form.
**Vote rejected due to lack of justification statement.