International Standards and Conformity Assessment for all electrical, electronic and related technologies

SC 48B

Electrical connectors

 

Vote for P-Members

P-Members

Voting
P-Members

In favour
In favour %
Criteria
Result
21 21 100 >=66.7% APPROVED

All Votes

Total

Votes Cast
Total

Against
Against %
Criteria
Result
26 0 0 <=25% APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document 48B/2291/FDIS

 

Project : IEC 60512-99-001 Ed. 1.0

IEC 60512-99-001 Ed 1.0: Connectors for electronic equipment - Tests and measurements - Part 99-001: Test schedule for engaging and separating connectors under electrical load - Test 99a: Connectors used in twisted pair communication cabling with remote power

 

Reference Circulation date Closing date Downloads
48B/2291/FDIS 2012-03-16 2012-05-18


Compilation of Comments
CC file    
Voting Result
48B/2306/RVD 2012-05-25  
 
export to xls file

Result of Voting

Country
Status
Received
Vote
Comments
Australia O 2012-05-18 Y -
Austria P 2012-04-25 Y -
Belgium P 2012-04-23 Y -
Brazil P 2012-05-18 Y -
China P 2012-05-18 Y -
Czech Republic P 2012-04-19 Y -
Denmark P 2012-05-15 Y -
Finland P 2012-05-18 Y -
France P 2012-05-14 Y -
Germany P 2012-05-10 Y -
Greece - 2012-05-17 Y -
Hungary P 2012-05-16 Y -
Ireland P 2012-04-23 Y -
Israel P 2012-05-16 A -
Italy P 2012-05-17 Y -
Japan P 2012-05-17 Y -
Korea, Republic of O 2012-04-03 Y -
Netherlands P 2012-05-08 Y -
Pakistan P 2012-05-18 Y -
Poland O 2012-05-08 Y -
Portugal - 2012-05-18 A -
Qatar - 2012-05-17 Y -
Romania P 2012-05-17 Y -
Russian Federation P 2012-05-17 Y -
Spain P 2012-05-17 Y -
Switzerland P 2012-03-29 Y -
United Kingdom P 2012-04-26 Y -
United States of America P 2012-04-05 Y -

NOTES:



  1. Vote: Does the National Committee agree to publish the FDIS as an International Standard:
    Y = In favour; N = Against; A = Abstention.

  2. Only votes received before the closing date are counted in determining the decision.
    Late Votes: (0).

  3. Abstentions are not taken into account when totalizing the votes.

  4. P-members not voting: (0).


*Comments rejected because they were not submitted in the IEC Comment form.
**Vote rejected due to lack of justification statement.