International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 85

Measuring equipment for electrical and electromagnetic quantities

 

Vote for P-Members

P-Members

Voting
P-Members

In favour
In favour %
Criteria
Result
19 19 100 >=66.7% APPROVED

All Votes

Total

Votes Cast
Total

Against
Against %
Criteria
Result
21 0 0 <=25% APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document 85/465/FDIS

 

Project : IEC 61557-15 Ed. 1.0

IEC 61557-15: Electrical safety in low voltage distribution systems up to 1000 V AC and 1500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 15: functional safety requirements for insulation monitoring devices in it systems and equipment for insulation fault location in it systems

 

Reference Circulation date Closing date Downloads
85/465/FDIS 2013-11-15 2014-01-17


Compilation of Comments
CC file    
Voting Result
85/470/RVD 2014-01-24  
 
export to xls file

Result of Voting

Country
Status
Received
Vote
Comments
Austria P 2014-01-16 Y -
Belgium P 2013-12-26 Y -
Brazil O 2014-01-17 A -
Canada P 2014-01-15 Y -
China P 2014-01-17 Y -
Croatia P 2014-01-16 Y -
Czech Republic P 2014-01-13 Y -
Denmark O 2013-12-10 A -
Egypt P 2014-01-05 Y -
Finland P 2014-01-15 A -
France P 2014-01-16 Y -
Germany P 2013-12-13 Y -
Greece - 2014-01-15 A -
Hungary P 2014-01-17 Y -
Ireland - 2013-12-04 Y -
Italy P 2014-01-15 Y -
Japan P 2014-01-16 Y -
Korea, Republic of P 2013-12-26 Y -
Latvia - 2014-01-07 A -
Pakistan P 2014-01-10 Y -
Poland P 2014-01-10 Y -
Portugal P 2014-01-17 A -
Qatar - 2014-01-15 Y -
Romania P 2013-12-13 Y -
Russian Federation P 2013-12-25 Y -
Slovenia P 2014-01-16 Y -
South Africa P 2014-01-17 A -
Spain P 2014-01-17 A -
Ukraine P 2014-01-17 Y -
United Kingdom P 2013-12-20 A -
United States of America P 2014-01-09 A -

NOTES:



  1. Vote: Does the National Committee agree to publish the FDIS as an International Standard:
    Y = In favour; N = Against; A = Abstention.

  2. Only votes received before the closing date are counted in determining the decision.
    Late Votes: (0).

  3. Abstentions are not taken into account when totalizing the votes.

  4. P-members not voting: (0).


*Comments rejected because they were not submitted in the IEC Comment form.
**Vote rejected due to lack of justification statement.