International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 4

Hydraulic turbines

 

Comments summarized

Comments received
No comments
No response
P-members 4 13 3
O-members 0 5 9
Non-members 0 1 0
Total 4 19 12

P-members with no response: Egypt; Norway; Switzerland

*Comments rejected because they were not submitted in the IEC Comment form.

 Illustration: Voting

Report of Comments

Document 4/290/DC

 

this Draft for Comments with the attached proposed document structure, and draft versions of HYDROELECTRIC MACHINES - GUIDE FOR INSTALLATION PROCEDURES AND TOLERANCES: Parts 1 (General), 2 (Vertical Francis turbine or pump/turbine) and 11 (Vertical generator with a thrust bearing below the rotor).

 

Reference Circulation date Closing date Downloads
4/290/DC 2014-01-31 2014-03-14
Compilation of Comments
CC file    
 
export to xls file

All comments

Country
Status
Received
Comments
Austria P 2014-03-13 N
Belgium P 2014-02-17 N
Brazil -*
Canada P 2014-03-13 Y
China P 2014-03-13 N
Czech Republic P 2014-03-13 N
Egypt P
Finland O 2014-03-14 N
France P 2014-03-10 N
Germany P 2014-03-14 N
Greece O 2014-03-14 N
Hungary O
India P 2014-03-13 N
Indonesia O
Ireland O 2014-02-28 N
Israel O
Italy P 2014-03-14 Y
Japan P 2014-03-14 N
Korea, Republic of P 2014-02-17 N
Malaysia O
Mexico O 2014-03-12 N
Netherlands P 2014-03-10 N
New Zealand O
Norway P
Poland O
Portugal - 2014-03-14 N
Romania O 2014-03-12 N
Russian Federation P 2014-03-11 N
Serbia O
Slovenia O
Spain P 2014-03-14 N
Sweden P 2014-03-13 Y
Switzerland P
Ukraine O
United Kingdom P 2014-02-20 N
United States of America P 2014-03-14 Y