International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 4

Hydraulic turbines

 

Vote for P-Members

P-Members

Voting
P-Members

In favour
In favour %
Criteria
Result
14 14 100 >=66.7% APPROVED

All Votes

Total

Votes Cast
Total

Against
Against %
Criteria
Result
17 0 0 <=25% APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document 4/284/FDIS

 

Project : IEC 62270 Ed. 2.0

IEC 62270/Ed2: Guide for Computer-Based Control for Hydroelectric Power Plant Automation

 

Reference Circulation date Closing date Downloads
4/284/FDIS 2013-06-07 2013-08-09


Compilation of Comments
CC file    
Voting Result
4/287/RVD 2013-08-16  
 
export to xls file

Result of Voting

Country
Status
Received
Vote
Comments
Austria P 2013-08-01 Y -
Belgium P 2013-07-12 Y -
Canada P 2013-07-29 Y -
China P 2013-08-08 Y -
Czech Republic P 2013-07-30 Y -
Egypt P
France P 2013-06-27 Y -
Germany P 2013-07-26 Y -
Greece O 2013-08-07 A -
India P 2013-08-07 Y -
Ireland O 2013-08-06 Y -
Italy P 2013-07-22 Y -
Japan P 2013-07-19 Y -
Korea, Republic of O 2013-07-26 Y -
Mexico O 2013-08-07 A -
Netherlands P 2013-08-07 A -
Norway P
Portugal - 2013-08-09 A -
Romania O 2013-08-08 Y -
Russian Federation P 2013-08-08 Y -
Spain P 2013-07-26 Y -
Sweden P 2013-08-07 Y -
Switzerland P 2013-07-02 A -
United Kingdom P 2013-07-19 A -
United States of America P 2013-08-07 Y -

NOTES:



  1. Vote: Does the National Committee agree to publish the FDIS as an International Standard:
    Y = In favour; N = Against; A = Abstention.

  2. Only votes received before the closing date are counted in determining the decision.
    Late Votes: (0).

  3. Abstentions are not taken into account when totalizing the votes.

  4. P-members not voting: Egypt; Norway(2).


*Comments rejected because they were not submitted in the IEC Comment form.
**Vote rejected due to lack of justification statement.