International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 65

Industrial-process measurement, control and automation

 

Detail

Committee
Working Groups
Project Leader

Current

Status

Frcst Pub
Date

Stability

Date

TC 65WG17T IshikumaA2CD2016-04 

History

Stage
Document
Downloads
Decision Date
Target Date
PNW
65/519/NP pdf file 257 kB
2012-12-21 
PNW
65/519/NP pdf file 257 kB
2012-12-21 
PNW
65/519/NP pdf file 257 kB
2012-12-21 
ANW
65/530/RVN pdf file 296 kB
65/530A/RVN pdf file 63 kB
2013-04-122013-05-15
ANW
65/530/RVN pdf file 296 kB
65/530A/RVN pdf file 63 kB
2013-04-122013-05-15
1CD
65/555/CD pdf file 1373 kB
2014-02-142014-03-30
CDM
65/565/CC doc file 120 kB
pdf file 192 kB
65/565A/CC doc file 129 kB
pdf file 218 kB
2014-04-252014-05-30
A2CD
65/565/CC doc file 120 kB
pdf file 192 kB
65/565A/CC doc file 129 kB
pdf file 218 kB
2014-06-272014-06-15
2CD
 2014-09-30
1CD
 2013-03-30
ANW
 2013-05-15

Project

IEC/TS 62872 Ed. 1.0

Industrial process measurement, control and automation - System interface between Industrial Facilities and the Smart Grid.

 

Remark:

Project plan: DTS 2013-11, Relevant docs: IEC 62439, IEC 62443, IEC 61508, IEC 61511, IEC 61010-2-201, IEC 61326, IEC 61588, IEC 61158, IEC 61784, IEC 61918,IEC/TR 62685, IEC 61784-3, IEC 62541, IEC/TR 62837, IEC/TR 62357, IEC 61970, IEC 61850, IEC 61968, IEC 62351, IEC 62056, IEC 62325 Liaisons: TC 57, PC118, ODVA, PI, SERCOS