International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 4

Hydraulic turbines

 

Detail

Committee
Working Groups
Project Leader

Current

Status

Frcst Pub

Date

Stability

Date

TC 4WG 30Takaya NomuraPWI  

History

Stage
Document
Downloads
Decision Date
Target Date
PWI
2012-10-172014-12-31

Project

PWI 4-5 Ed. 1.0

Hydroelectric machines - Guide for installation procedures and tolerances: Parts 1 (General), 2 (Vertical Francis turbine or pump/turbine) and 11 (Vertical generator with a thrust bearing below the rotor)

 

Remark:

 

Associated Documents:

4/280/RM

4/297/RM

4/290/DC