International Standards and Conformity Assessment for all electrical, electronic and related technologies

CIS/B

Interference relating to industrial, scientific and medical radio-frequency apparatus, to other (heavy) industrial equipment, to overhead power lines, to high voltage equipment and to electric traction

 

Detail

Committee
Working Groups
Project Leader

Current

Status

Frcst Pub
Date

Stability

Date

CIS/BWG1Y. YoshiokaCCDV2015-022017

History

Stage
Document
Downloads
Decision Date
Target Date
AMW
CIS/B/512/RR pdf file 64 kB
2010-11-05 
1CD
CIS/B/533/CD pdf file 419 kB
2012-04-202012-01-31
CDM
CIS/B/546/CC doc file 283 kB
pdf file 325 kB
CIS/B/546A/CC doc file 303 kB
pdf file 251 kB
2012-08-102012-08-31
A2CD
CIS/B/546/CC doc file 283 kB
pdf file 325 kB
CIS/B/546A/CC doc file 303 kB
pdf file 251 kB
2013-02-012012-12-31
2CD
CIS/B/562/CD pdf file 168 kB
2013-02-082013-02-28
CDM
CIS/B/577/CC doc file 3704 kB
pdf file 1123 kB
CIS/B/577A/CC doc file 3700 kB
pdf file 1116 kB
2013-05-312013-06-15
ACDV
CIS/B/577/CC doc file 3704 kB
pdf file 1123 kB
CIS/B/577A/CC doc file 3700 kB
pdf file 1116 kB
2013-06-212013-07-15
CCDV
CIS/B/595/CDV
pdf file 667 kB
pdf file 731 kB
2014-01-102014-01-31
ADIS
 2014-07-15
DEC
 2014-08-15

Project

CISPR 11 f5 Ed. 6.0

Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of measurement - Supplement of CISPR 11 with emission requirements for Grid Connected Power Conditioners (GCPC)

 

Remark:

- Project plan: CDV: 2013-05, FDIS: 2014-03 - Fraction 5 has been created following CISPR/B/544A/INF and CISPR/B/553/RM and is related to fraction 1. If possible, the results of CISPR/B/561/CD (f1) and CISPR/B/562/CD (f5) will be merged at the CDV stage.

 

Associated Documents:

CIS/B/534/DC

CIS/B/544A/INF

CIS/B/553/RM