International Standards and Conformity Assessment for all electrical, electronic and related technologies

SC 17A

High-voltage switchgear and controlgear

 

Detail

Committee
Working Groups
Project Leader

Current

Status

Frcst Pub
Date

Stability

Date

SC 17A41 PPUB 2016

History

Stage
Document
Downloads
Decision Date
Target Date
PNW
17A/437/NP  
1994-11-25 
ANW
17A/450/RVN  
1995-03-241995-04-01
1CD
17A/503/CD  
1997-08-081997-03-23
A2CD
1998-06-261998-07-31
2CD
17A/547/CD pdf file 337 kB
1999-05-071999-03-31
CDM
17A/560/CC pdf file 374 kB
17A/560A/CC pdf file 14 kB
1999-09-031999-09-30
CCDV
17A/570/CDV
pdf file 1085 kB
17A/570A/CDV
pdf file 17 kB
2000-01-281999-11-30
ADIS
17A/585/RVC pdf file 185 kB
2000-07-142000-09-30
DEC
2001-06-152000-10-31
ADISSB
2001-06-29 
DEC
2001-07-122001-07-16
RDIS
2001-07-122001-07-31
CDIS
17A/617/FDIS
2001-09-072001-10-15
APUB
17A/619/RVD pdf file 34 kB
2001-11-192001-12-31
BPUB
2001-11-202002-01-31
PPUB
2001-12-192002-01-31

Project

IEC 62271-102 Ed. 1.0

High-voltage switchgear and controlgear - Part 102: High-voltage alternating current disconnectors and earthing switches

 

Remark:

- Need coord. 17C. - Previous project number: 60129 Ed.4 (change done 2001-06-22) - Supersedes IEC 60129, Ed.3, Amend. 1 (1992), Amend. 2 (1996), IEC 61128, Ed.1 (1992), Amend. 1 (1994), IEC 61129, Ed.1 (1992), Amend. 1 (1994) and IEC 61259, Ed.1 (1994)- Change MRD from 2013 to 2009 (see SMB/2955A/RV)

 

Associated Documents:

17A/455/RM

 
17A/525/CC

 
17A/535A/RM

17C/279/DC

17C/286/INF

SMB/2955A/RV