International Standards and Conformity Assessment
for all electrical, electronic and related technologies
SC 65A |
System aspects |

Detail
Committee | Working Groups | Project Leader | Current Status | Frcst Pub Date | Stability Date |
|---|---|---|---|---|---|
| SC 65A | WG4 | B. Jaekel | PPUB | 2012-07 | 2016 |
History
Stage | Document | Downloads | Decision Date | Target Date | ||
|---|---|---|---|---|---|---|
| AMW |
| 2010-01-08 | ||||
| 1CD |
| 2010-01-15 | 2010-02-28 | |||
| ACDV |
| 2010-10-29 | 2010-06-15 | |||
| CCDV |
| 2011-01-21 | 2011-01-31 | |||
| ADIS |
| 2011-09-09 | 2011-09-30 | |||
| DEC | 2012-02-24 | 2011-10-31 | ||||
| RDIS | 2012-03-07 | 2012-03-15 | ||||
| CDIS |
| 2012-04-06 | 2012-05-31 | |||
| APUB |
| 2012-06-15 | 2012-06-15 | |||
| BPUB | 2012-06-18 | 2012-06-30 | ||||
| PPUB | 2012-07-10 | 2012-07-31 | ||||
Project
IEC 61326-2-4 Ed. 2.0
Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-4: Particular requirements - Test configurations, operational conditions and performance criteria for insulation monitoring devices according to IEC 61557-8 and for equipment for insulation fault location according to IEC 61557-9
Remark:
- Project plan: CDV 2012-01, FDIS 2013-01 - The CD on this subpart of IEC 61326-2 should be read in conjunction with the CD on IEC 61326-1 which is circulated in parallel