International Standards and Conformity Assessment for all electrical, electronic and related technologies

SC 17C

High-voltage switchgear and controlgear assemblies

 

Detail

Committee
Working Groups
Project Leader

Current

Status

Frcst Pub

Date

Stability

Date

SC 17CMT 18D. KunzePPUB2007-092017

History

Stage
Document
Downloads
Decision Date
Target Date
AMW
17C/297/MCR pdf file 82 kB
17C/297A/MCR pdf file 87 kB
2003-06-13 
1CD
17C/351/CD pdf file 394 kB
2005-05-202005-03-31
CDM
17C/361/CC doc file 232 kB
pdf file 227 kB
17C/361A/CC doc file 261 kB
pdf file 246 kB
2005-09-162005-10-15
ACDV
2005-10-192005-11-30
CCDV
17C/372/CDV pdf file 1284 kB
2006-03-102006-03-31
ADIS
17C/385/RVC doc file 343 kB
pdf file 274 kB
2006-10-202006-11-15
DEC
2007-02-212007-01-31
RDIS
2007-03-072007-03-31
CDIS
17C/405/FDIS

2007-05-112007-06-15
APUB
17C/412/RVD pdf file 111 kB
2007-07-162007-07-15
BPUB
2007-07-172007-07-31
PPUB
2007-08-092007-08-31

Project

IEC 62271-209 Ed. 1.0

High-voltage switchgear and controlgear - Part 209: Cable connections for gas-insulated metal-enclosed switchgear for rated voltages above 52 kV - Fluid-filled and extruded insulation cables - Fluid-filled and dry-type cable-terminations

 

Remark:

- Next review in 2014 - Change of project No. former IEC 60859, TS. This project becomes an IS - Change of project No. former IEC 62271-305 Ed.1 - Target dates: CCDV 2005-06 CDIS 2006-06 - Also of interest to TC 14, SC 17A, TC 20

 

Associated Documents:

17C/306/AC

17C/330/DC

17C/341/INF

17C/343/INF

17C/365/RM

17C/465/MCR

17C/550/RR