SC 65B |
Measurement and control devices |

Detail
Committee | Working Groups | Project Leader | Current Status | Frcst Pub Date | Stability Date |
|---|---|---|---|---|---|
| SC 65B | WG6 | Dehui Sun | DEL | 2010-11 |
History
Stage | Document | Downloads | Decision Date | Target Date | ||
|---|---|---|---|---|---|---|
| PNW |
| 2010-02-19 | ||||
| DEL |
| 2010-08-27 | 2010-07-15 | |||
Project
PNW 65B-745 Ed. 1.0
Methods for calculating the main static performance specification of transducers and transmitters for use in process measurement and control systems
Remark:
- Project plan: CD 2010-09 IS 2012-09 - Relevant documents to be considered: IEC 60770-1 : 1999 Transmitters for Use in Industrial-process Control Systems, Part 1: Methods for Performance Evaluation, IEC 60050(351): 1999 International Electrotechnical Vocabulary - Part 351: Automatic Control, IEC 61298: 1995 Process Measurement and Control Devices , General Methods and Procedures for Evaluating Performance, Part 1: General Considerations; Part 2: Tests under Reference Conditions, SAMA PMC20.1: 1973 Process Measurement and Control Terminology (An Industrial Standard of American Scientific Apparatus Makers Association (endorsed by ISA), ANSI/ISA-S37.1: 1975 (Revised 1982, formerly ANSI MC6.1-1975) Electrical Transducer Nomenclature and Terminology (American National Standard), GB/T 18459: 2001 Methods for Calculating the Main Static Performance Specifications of Transducers (A Chinese national standard, printed in Chinese)

