International Standards and Conformity Assessment for all electrical, electronic and related technologies

PC 118

Smart grid user interface

 
export to xls file

PC 118 Working Documents since 2016-05-25

Reference, Title
Downloads

Circulation

Date

Closing

Date

CENELEC

Voting /

Comment

Authorized

Committees

118/72/INF

Report on the request from PC 118 to TC 57 for collaboration in the context of national comments received on documents 118/55/CDV, 118/56/CDV, and 118/57/DC

2017-04-07 N/A
TC 57
118/71/AC

MTGS 2017 - Next meeting to be held in Seoul (Korea) from 14th to 16th November 2017 (Announcement)

2017-03-31 N/A
118/69/CD

IEC 62746-10-1 ED1: Systems interface between customer energy management system and the power management system - Part 10-1: Open Automated Demand Response

2017-02-24 2017-04-21 Y Report of Comments
TC 57
TC 65
118/70/CD

PWI 118-2: Systems interface between customer energy management system and the power management system - Part 10-3: Adapting smart grid user interface to IEC CIM

2017-02-24 2017-04-21 U Report of Comments
TC 57
118/59B/RVC

Result of Voting on 118/55/CDV - IEC 62746-10-1 Ed.1: Systems interface between customer energy management system and the power management system - Part 10-1: Open automated demand response

2017-02-17 Y
TC 57
TC 65
118/68/RM

Unconfirmed minutes of the 5th plenary meeting held in Frankfurt, Germany, on October 13th, 2016

2016-11-18 N/A
118/67/MTG

Reports and presentations given at the PC 118 plenary meeting (2016-10-13) in Frankfurt, Germany

2016-10-28 N/A
118/66/INF

Report of comments on 118/57/DC: Call for comments on a draft International Standard "IEC 62746-10-3 Adapting Smart Grid User Interface to IEC CIM"

2016-10-07 N/A
118/62A/DA

Revised draft agenda for the meeting to be held in Frankfurt, Germany, on 2016-10-13 (starting time: 09:00, approximate finishing time: 17:00)

2016-09-23 N/A
118/65/PW

Programme of work of the Committee, as recorded by the IEC Central Office in its database

2016-09-23 N/A
118/59A/RVC

Revised voting result on 118/55/CDV: IEC 62746-10-1 Ed.1: Systems interface between customer energy management system and the power management system - Part 10-1: Open automated demand response

2016-09-16 Y
TC 57
TC 65
118/60A/RVC

Revised voting result on 118/56/CDV: IEC 62939-3 Ed.1: Smart grid user interface - Part 3: Energy interoperation services

2016-09-16 Y
TC 57
118/64/INF

Announcement of a vote to take place at the PC 118 plenary meeting in Frankfurt, Germany, on 2016-10-13, on the adoption of IEEE 2030.5-2013, "Standard for Smart Energy Profile 2.0 Application Protocol" under the IEC/IEEE Dual Logo Agreemen

2016-08-19 N/A
TC 57
118/63/INF

Report of comment on 118/44/DC: Call for comments on considering the adoption of IEEE 2030.5-2013, "Standard for Smart Energy Profile 2.0 Application Protocol" under the IEC/IEEE Dual Logo Agreement

2016-06-10 N/A
TC 57
118/59/RVC

Voting result on 118/55/CDV: IEC 62746-10-1 Ed.1: Systems interface between customer energy management system and the power management system - Part 10-1: Open automated demand response

2016-06-03 Y
TC 57
TC 65
118/60/RVC

Voting result on 118/56/CDV: IEC 62939-3 Ed.1: Smart grid user interface - Part 3: Energy interoperation services

2016-06-03 Y
TC 57
118/61/INF

Report of comments on 118/57/DC: draft International Standard IEC 62746-10-3 Adapting Smart Grid User Interface to IEC CIM

2016-06-03 N/A
TC 57
118/62/DA

Draft agenda for the meeting to be held in Frankfurt, Germany, on 2016-10-13 (starting time: 09:00, approximate finishing time: 17:00)

2016-06-03 N/A