International Standards and Conformity Assessment
for all electrical, electronic and related technologies
SC 47D |
Semiconductor devices packaging |

Reference, Title | Downloads | Circulation Date | Closing Date | CENELEC | Voting / Comment | Authorized Committees |
|---|---|---|---|---|---|---|
47D/832/RRReview report on IEC 60191-6-13 Ed.1: Semiconductor packaging - Part 6-13: Design guideline of open-top-type sockets for Fine-pitch Ball Grid Array and Fine-pitch Land Grid Array (FBGA/FLGA) | 2013-05-03 | ? | ||||
47D/833/RRReview report on IEC 60191-6-16 Ed.1: Semiconductor Packaging - Part 6-16: Glossary of semiconductor tests and burn-in sockets for BGA, LGA, FBGA and FLGA | 2013-05-03 | ? | ||||
47D/834/CDIEC 60191-6-13 Ed.2: Mechanical standardization of semiconductor devices - Part 6-13: Design guideline of open-top-type sockets for Fine-pitch Ball Grid Array and Fine-pitch Land Grid Array (FBGA/FLGA) | 2013-05-03 | 2013-08-09 | ? | |||
47D/835/CDIEC 60191-6-16 Ed.2: Mechanical standardization of semiconductor devices - Part 6-16: Glossary of semiconductor tests and burn-in sockets for BGA, LGA, FBGA and FLGA | 2013-05-03 | 2013-08-09 | ? | |||
47D/831/RMUnconfirmed Minutes of SC 47D Meeting held in Jeju, Korea from 24 to 25 October, 2012 | 2013-01-25 | |||||
47D/830/RVDReport of Voting on 47D/829/FDIS: IEC 60191-6-5 Ed.2: Mechanical standardization of semiconductor devices - Part 6-5: General rules for the preparation of outline drawings of surface mounted semiconductor device packages - Design guide for fine-pitch ball grid array (FBGA)
| 2012-12-14 | yes | ||||
47D/829/FDISIEC 60191-6-5 Ed.2: Mechanical standardization of semiconductor devices - Part 6-5: General rules for the preparation of outline drawings of surface mounted semiconductor device packages - Design guide for fine-pitch ball grid array (FBGA) | 2012-10-05 | 2012-12-07 | yes | Voting Result | TC 91 | |
47D/828/PWProgramme of work of SC 47D as recorded by the IEC Central Office in its database. | 2012-09-28 | |||||
47D/826A/DARevised draft agenda for the meeting to be held in Jeju, Korea, from 2012-10-24 (starting time: 9:00) to 2012-10-25 (approximate finishing time: 17:00) | 2012-09-28 | |||||
47D/827/INFCompilation of comments on 47D/825/DC: Maintenance - call for comments/ proposals on publications coming up for review and a call for experts | 2012-08-31 | |||||
47D/826/DADraft agenda for the meeting to be held in Jeju, Korea, from 2012-10-24 (starting time: 9:00) to 2012-10-25 (approximate finishing time: 17:00) | 2012-07-13 | |||||
47D/825/DCMaintenance call for comments/ proposals on publications coming up for review and a call for experts
| 2012-06-01 | 2012-08-03 | Report of Comments |



