International Standards and Conformity Assessment
for all electrical, electronic and related technologies
SC 65A |
System aspects |

Reference, Title | Downloads | Circulation Date | Closing Date | CENELEC | Voting / Comment | Authorized Committees |
|---|---|---|---|---|---|---|
65A/656/CDVManagement of Alarm Systems for the Process Industries | 2013-01-25 | 2013-04-26 | yes | |||
65A/660/INFRESULT OF 65A/655/DC - REVISION OF IEC 61069 Ed 1 Series (1991 - 1999) | 2012-12-21 | |||||
65A/658/RMUNCONFIRMED MINUTES OF THE MEETING OF IEC/SC 65A HELD ON 25TH SEPTEMBER 2012 AT THE ORANGE COUNTY CONVENTION CENTER, ORLANDO, FLORIDA, USA. | 2012-12-07 | |||||
65A/659/MTGMEETING DOCUMENTS OF THE MEETING OF IEC/SC 65A HELD ON 25TH SEPTEMBER 2012 AT THE ORANGE COUNTY CONVENTION CENTER, ORLANDO, FLORIDA, USA. | 2012-12-07 | |||||
65A/657/CCCompilation of comments on 65A/620/CD - IEC 62682 Ed 1: Management alarms for the process industry | 2012-11-30 | yes | ||||
65A/655/DCREVISION OF IEC 61069 Ed 1 Series (1991 - 1999)
| 2012-10-26 | 2012-12-14 | Report of Comments | |||
65A/652/RVDReport of Voting on 65A/641/FDIS - IEC 61326-2-1 Ed.2: Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-1: Particular requirements - Test configurations, operational conditions and performance criteria for sensitive test and measurement equipment for EMC unprotected applications | 2012-09-14 | yes | ||||
65A/654/RVDReport of Voting on 65A/643/FDIS - IEC 61326-2-5 Ed. 2: Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-5: Particular requirements - Test configurations, operational conditions and performance criteria for devices with field bus interfaces according to IEC 61784-1 | 2012-09-14 | yes | ||||
65A/653/RVDReport of Voting on 65A/642/FDIS - IEC 61326-2-2/Ed. 2: Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-2: Particular requirements - Test configurations, operational conditions and performance criteria for portable test, measuring and monitoring equipment used in low-voltage distribution systems | 2012-09-14 | yes | ||||
65A/649/INFStability dates to be reviewed at the meeting of IEC/SC 65a to be held on 25th September 2012 at the orange county convention center, Orlando, Florida, USA. | 2012-08-31 | |||||
65A/636A/DARevised draft agenda for the meeting of IEC/SC 65A to be held on 25th September 2012 in Orlando, Florida, USA | 2012-08-31 | |||||
65A/651/INFREPORT ON WG 4 EMC REQUIREMENTS (CONVENOR: DR BERND JÄKEL) (Item 5.1) | 2012-08-31 | |||||
65A/650/INFACOS activities on functional safety | 2012-08-31 | |||||
65A/648/PWProgramme of Work of the IEC Subcommittee 65A as recorded by the IEC Central Office in its database. | 2012-08-17 | |||||
65A/646/INFResult of 65A/633/DC: Maintenance of EMC standards related to functional safety, IEC 61326-3-1 Ed.1.0 and IEC 61326-3-2 Ed.1.0
| 2012-08-03 | |||||
65A/647/INFResult of 65A/634/DC: Proposals for work on EMF considerations for equipment in the scope of TC 65 | 2012-08-03 | |||||
65A/645/INFREPORT OF AHG 16 - HUMAN FACTORS AND FUNCTIONAL SAFETY | 2012-07-13 | |||||
65A/644/RVDResult of voting on 65A/632/ISH - Interpretation sheet 1 for IEC 61326-3-2 Ed.1, Not C in Table 1b | 2012-07-06 | ? | ||||
65A/641/FDIS IEC 61326-2-1/Ed. 2: Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-1: Particular requirements - Test configurations, operational conditions and performance criteria for sensitive test and measurement equipment for EMC unprotected applications | 2012-06-29 | 2012-09-07 | yes | Voting Result | TC 66 | |
65A/643/FDIS IEC 61326-2-5 Ed. 2: Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-5: Particular requirements - Test configurations, operational conditions and performance criteria for devices with field bus interfaces according to IEC 61784-1 | 2012-06-29 | 2012-09-07 | yes | Voting Result | TC 66 | |
65A/642/FDIS IEC 61326-2-2/Ed. 2: Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-2: Particular requirements - Test configurations, operational conditions and performance criteria for portable test, measuring and monitoring equipment used in low-voltage distribution systems | 2012-06-29 | 2012-09-07 | yes | Voting Result | TC 66 | |
65A/637/RVDReport of Voting on 65A/628/FDIS - IEC 61326-1/Ed.2: Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 1: General requirements | 2012-06-15 | yes | ||||
65A/640/RVDReport of Voting on 65A/631/FDIS - IEC 61326-2-6/Ed.2: Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-6: Particular requirements - In vitro diagnostic (IVD) medical equipment | 2012-06-15 | yes | ||||
65A/639/RVDReport of Voting on 65A/630/FDIS - IEC 61326-2-4/Ed.2: Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-4: Particular requirements - Test configurations, operational conditions and performance criteria for insulation monitoring devices according to IEC 61557-8 and fo requipment for insulation fault location according to IEC 61557-9 | 2012-06-15 | yes | ||||
65A/638/RVDReport of Voting on 65A/629/FDIS - IEC 61326-2-3/Ed.2: Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-3: Particular requirements - Test configurations, operational conditions and performance criteria for transducers with integrated or remote signal conditioning | 2012-06-15 | yes | ||||
65A/636/DADRAFT AGENDA FOR THE MEETING OF IEC/SC 65A TO BE HELD ON 25TH SEPTEMBER 2012 AT THE ORANGE COUNTY CONVENTION CENTER, ORLANDO, FLORIDA, USA. | 2012-05-25 | |||||
65A/635/DCRequest for comments on SC65B/809/CDV | 2012-04-27 | 2012-06-15 | Report of Comments | |||
65A/633/DCMaintenance of EMC standards related to functionalsafety, IEC 61326-3-1 Ed1 and IEC 61326-3-2 Ed 1 | 2012-04-13 | 2012-07-27 | Report of Comments | |||
65A/634/DCPROPOSALS FOR WORK ON EMF CONSIDERATIONS FOR EQUIPMENT IN THE SCOPE OF TC 65 | 2012-04-13 | 2012-07-27 | Report of Comments | |||
65A/628/FDISIEC 61326-1 Ed. 2Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 1: General requirements | 2012-04-06 | 2012-06-08 | yes | Voting Result | TC 66 | |
65A/632/ISHInterpretation sheet 1 for IEC 61326-3-2 Ed. 1, Note c in Table 1b | 2012-04-06 | 2012-06-08 | ? | Voting Result | ||
65A/631/FDIS IEC 61326-2-6 Ed. 2: Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-6: Particular requirements - In vitro diagnostic (IVD) medical equipment | 2012-04-06 | 2012-06-08 | yes | Voting Result | TC 66 | |
65A/630/FDIS IEC 61326-2-4 Ed. 2: Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-4: Particular requirements - Test configurations, operational conditions and performance criteria for insulation monitoring devices according to IEC 61557-8 and for equipment for insulation fault location according to IEC 61557-9 | 2012-04-06 | 2012-06-08 | yes | Voting Result | TC 66 | |
65A/629/FDISIEC 61326-2-3 Ed. 2:Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-3: Particular requirements - Test configurations, operational conditions and performance criteria for transducers with integrated or remote signal conditioning | 2012-04-06 | 2012-06-08 | yes | Voting Result | TC 66 | |
65A/621/RRReview report on IEC 61511-1 Ed1: Functional safety - Safety instrumented systems for the process industry sector - Normative (uon) Part 1: Framework, definitions, system, hardware and software requirements | 2012-03-30 | yes | ||||
65A/627/CDIEC 61511-3 Ed. 2: Functional safety - Safety instrumented systems for the process industry sector - Part 3: Guidance for the determination of the required safety integrity levels-Informative | 2012-03-30 | 2012-07-06 | yes | Report of Comments | ||
65A/626/RRReview report on IEC 61511-3 Ed 1: Functional safety - Safety instrumented systems for the process industry sector - Part 3: Guidance for the determination of the required safety integrity levels-Informative | 2012-03-30 | yes | ||||
65A/625/CDIEC 61511-2 Ed. 2: Functional safety - Safety instrumented systems for the process industry sector - Part 2: Guidelines for the application of IEC 61511-1- Informative | 2012-03-30 | 2012-07-06 | yes | Report of Comments | ||
65A/624/RRReview report on IEC 61511-2 Ed. 1: Functional safety - Safety instrumented systems for the process industry sector - Part 2: Guidelines for the application of IEC 61511-1- Informative | 2012-03-30 | yes | ||||
65A/623/INFIEC 61511 Part 1-2nd edition CROSS REFERENCES AND MAJOR REVISON GUIDE | 2012-03-30 | |||||
65A/622/CDIEC 61511-1 Ed. 2: Functional safety - Safety instrumented systems for the process industry sector - Normative (uon) Part 1: Framework, definitions, system, hardware and software requirements | 2012-03-30 | 2012-07-06 | yes | Report of Comments | ||
65A/620/CDIEC 62682 Ed 1: Management alarms for the process industry | 2012-03-23 | 2012-06-29 | yes | Report of Comments | ||
65A/619/INFAPPOINTMENT OF CONVENOR TO MT 61508-3 | 2012-03-16 | |||||
65A/618/RQResult of Questionnaire 65A/616/Q: Questionnaire on the reappointment of Mr Regnar Schultz, as the SC 65A representative on ACOS | 2012-02-24 | |||||
65A/617/RQResult of Questionnaire on 65A/615/Q: Questionnaire on the extension of the term of office of the SC 65a representative in ACEC | 2012-02-17 |



