International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 65

Industrial-process measurement, control and automation

 
export to xls file

TC 65 Working Documents since 2012-02-05

sort upsort down
Reference, Title
Downloads
sort down

Circulation

Date

sort upsort down

Closing

Date

sort upsort down
CENELEC

Voting /

Comment

Authorized

Committees

65/523A/CD

IEC 62443-2-4/Ed.1: Security for industrial automation and control systems - Network and system security - Part 2-4: Requirements for IACS solution suppliers
2013-01-252013-04-19?
65/524/CD

IEC 62424/Ed 1/Amd 1: Representation of process control engineering - Request in P&I diagrams and data exchange between P&ID tools and PCE-CAE tools.
2013-01-252013-04-26yes
65/502A/RVC

Revised result of voting on 65/489/CDV - IEC 62443-3-3 Ed. 1.0: Industrial communication networks - Network and system security Part 3-3: System security requirements and security assurance level
2013-01-25no
65/523/CD

IEC 62443-2-4/Ed.1: Security for industrial automation and control systems - Network and system security - Part 2-4: Requirements for IACS solution suppliers
2013-01-18?
65/522/NP

Safety requirements for electrical equipment for measurement, control and laboratory use - Part 2-2 xx: Particular requirements for electrically operated valve and actuator
2013-01-112013-04-12?
65/519/NP

Industrial process measurement, control and automation - System interface between Industrial Facilities and the Smart Grid.
2012-12-212013-03-22?
65/521/RVD

Report of Voting on 65/515/FDIS - IEC 61010-2-201 Ed.1:Safety requirements for electrical equipment for measurement, control and laboratory use - Part 2-201: Particular requirements for control equipment, excluding functional safety, in the scope of industrial-process measurement, control and automation
2012-12-21yes
65/520/CC

Compilation of comments on 65/509/CD: IEC 62708 Ed. 1.0: Document kinds for Electrical and Instrumentation Projects in the Process Industry
2012-12-21yes
65/517/RVC

Result of voting on 65/513/DTR - IEC/TR 62837/Ed.1 :Industrial-process measurement, control and automation - Energy Efficiency through Automation Systems
2012-11-30no
65/518/INF

RESULT OF 65/514/DC - IEC 62443 2 1(Ed.2.0), SECURITY FOR INDUSTRIAL AUTOMATION AND CONTROL SYSTEMS, PART 2 1: REQUIREMENTS FOR AN IACS SECURITY MANAGEMENT SYSTEM
2012-11-30
65/516/NP

Automation systems and integration - Evaluating energy efficiency and other factors of manufacturing systems that influence the environment - Part 5: Environmental influence evaluation data
2012-11-232013-03-01?
65/515/FDIS

IEC 61010-2-201 Ed.1:Safety requirements for electrical equipment for measurement, control and laboratory use - Part 2-201: Particular requirements for control equipment, excluding functional safety, in the scope of industrial-process measurement, control and automation
2012-09-282012-11-30yesVoting Result
TC 17
TC 22
TC 44
TC 57
TC 66
TC 108
65/512/INF

Minutes of the last Advisory Group meeting, held in Nice 2012-02.
2012-09-21
65/514/DC

Document for comments - IEC 62443 2 1(Ed.2.0), Security for industrial automation and control systems, Part 2 1: Requirements for an IACS security management system
2012-09-212012-11-23Report of Comments
65/487B/RVN

Result of voting on 65/482/NP: Security for industrial process measurement and control - Network and system security Part 2-4: Certification of IACS supplier security policies and practices
2012-09-21?
65/513/DTR

IEC/TR 62837/Ed.1: Industrial-process measurement, control and automation - Energy Efficiency through Automation Systems
2012-09-212012-11-23noVoting Result
TC 2
TC 17
TC 22
TC 23
65/510/INF

Advisory Group Agenda for the meeting on September 24, 2012 (3.00pm - 5.00pm) at the Orange County Convention Center, Orlando Florida, USA
2012-09-14
65/511/RQ

Result of Questionnaire on 65/505/Q: Extension of the term of office of the chairman of SC 65C: Industrial networks.
2012-09-14
65/504B/DA

Revised draft agenda for the meeting to be held in Orlando, Florida, USA on 28th September 2012 (9.00 - 12.00 - 13.30 - 16.30)
2012-08-31
65/507/RVN

Result of voting on 65/500/NP - Industrial-process measurement, control and automation - Reference model for representation of production facilities (Digital Factory)
2012-08-24?
65/509/CD

IEC 62708: Document kinds for Electrical and Instrumentation Projects in the Process Industry
2012-08-242012-11-30yesReport of Comments
65/508/RVC

Result of voting on 65/499/DTR - IEC/TR 62794 Ed. 1: Industrial-process measurement, control and automation - Reference model for representation of production facilities (Digital Factory)
2012-08-24no
65/506/PW

Programme of Work of the Technical Committee 65 as recorded by the IEC Central Office in its data base.
2012-08-17
65/504A/DA

Draft agenda for the meeting to be held in Orlando, Florida, USA on 28th September 2012 (9.00 - 12.00 - 13.30 - 16.30)
2012-07-13
65/505/Q

Further extension of the term of office of the chairman of SC 65C: Industrial networks
2012-07-132012-09-07Report of Comments
65/504/DA

Draft agenda for the meeting to be held in Orlando, Florida, USA on 28th September 2012 (9.00 - 12.00 - 13.30 - 16.30)
2012-06-15
65/503/AC

Next meeting of TC 65 and SCs to be held in Florida, US from 17th to 28th September 2012 (Registration)
2012-04-27
65/502/RVC

Result of voting on 65/489/CDV - IEC 62443-3-3 Ed. 1.0: Industrial communication networks - Network and system security Part 3-3: System security requirements and security assurance level
2012-04-13no
65/501/AC

Next meeting of TC 65 and SCs to be held in Florida, US from 17th - 28th September 2012
2012-03-30
65/492A/RVC

Revised result of voting on 65/484/CDV - IEC 61010-2-201: Ed1:Safety requirements for electrical equipment for measurement, control, and laboratory use -Part 2-201: Particular requirements for industrial-process measurement, control and automation equipment, specifically control equipment (excluding functional safety)
2012-03-23yes
65/500/NP

Industrial-process measurement, control and automation - Reference model for representation of production facilities (Digital Factory)
2012-03-232012-06-29?Voting Result
65/499/DTR

IEC/TR 62794: Industrial-process measurement, control and automation - Reference model for representation of production facilities (Digital Factory)
2012-03-232012-05-25noVoting Result
65/498/AC

Appointment of a secretary and assistant secretary
2012-03-02