International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 8

Systems aspects for electrical energy supply

 
export to xls file

TC 8 Working Documents since 2012-02-04

sort upsort down
Reference, Title
Downloads
sort down

Circulation

Date

sort upsort down

Closing

Date

sort upsort down
CENELEC

Voting /

Comment

Authorized

Committees

8/1317/NP

Guidelines for the General Planning and Design of Micro-Grids
2013-02-012013-05-03?
8/1318/NP

Technical requirements for the Operation and Control of Micro-Grids
2013-02-012013-05-03?
8/1314/CD

IEC/TR 62511 Ed.1: A Guide for the Design of Interconnected Power Systems
2012-12-142013-03-15no
8/1316/AC

WG 5: Methodology and Tools - Call for experts
2012-12-14
8/1315/Q

Approval of TC 8 Strategic Business Plan (SBP)
2012-12-142013-01-25Report of Comments
8/1312/RM

Unconfirmed minutes of TC 8 meeting held in Oslo, Norway on 3 October 2012
2012-11-30
8/1313/RVN

Result of voting on 8/1307/NP: Use Case Approach Part 2 - Definition of Use Case Template, Actor list and Requirement List for Energy Systems
2012-11-30?
8/1310/AC

Appointment of an assistant secretary
2012-09-14
8/1308A/DA

Revised draft agenda for the meeting to be held in Oslo, Norway, from 2012-10-03 (starting time: 09:00 am) to 2012-10-03 (approximate finishing time: 16:00 pm)
2012-09-14
8/1311/INF

Revision of TC 8 SBP (Strategic Business Plan)
2012-09-14
8/1309/PW

Programme of Work of TC 8 as recorded by the IEC Central Office in its database.
2012-09-07
8/1302A/CC

Revised compilation of comments on 8/1293/CD: IEC 60050-614 Ed.1: International Electrotechnical Vocabulary - Maintenance of IEC 60050(614) Generation, transmission and distribution of electricity - Operation
2012-08-31no
8/1308/DA

Draft agenda for the meeting to be held in Oslo, Norway, from 2012-10-03 (starting time: 09:00 am) to 2012-10-03 (approximate finishing time: 16:00 pm)
2012-08-10
8/1307/NP

Use Case Approach Part 2 - Definition of Use Case Template, Actor list and Requirement List for Energy Systems
2012-06-222012-09-28?Voting Result
8/1306A/RVN

Result of voting on 8/1301/NP: Smart Grid User Interface - Part 2: Domain Side Energy Source Interconnection with the Grid
2012-04-20?
8/1306/RVN

This document has been replaced by 8/1306A/RVN
2012-02-10?