International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 5

Steam turbines

 
export to xls file

TC 5 Working Documents since 2012-02-04

sort upsort down
Reference, Title
Downloads
sort down

Circulation

Date

sort upsort down

Closing

Date

sort upsort down
CENELEC

Voting /

Comment

Authorized

Committees

5/168/AC

JWG 16: Cogeneration Combined Heat and Power (CHP) with TC 45 and TC 105- Call for experts
2012-09-21
TC 45
TC 105
5/167/RQ

Result of Questionnaire on 5/166/Q: Establishment of a "Chairman Advisory Group" (CAG)
2012-08-03
5/166/Q

Questionnaire to approve the establishment of a TC5/CAG "Chairman's Advisory Group"
2012-06-082012-07-20Report of Comments
5/165/RQ

Result of Questionnaire on 5/161/Q: Maintenance of IEC 60045 Ed 1.0 (Specifications); IEC 61370 TS Ed 1.0 (Steam purity); IEC 60953-1,2,3 Ed 1.0 (Acceptance tests)
2012-03-23
5/164/AC

MT14: Maintenance of IEC 60953 Rules for steam turbine thermal acceptance tests - Part 1: Method A - High accuracy for large condensing steam turbines , Part 2: Method B - Wide range of accuracy for various types and sizes of turbines, Part 3: Thermal performance verification tests of retrofitted steam turbines and IEC61372 Simplified Thermal Performance Testing of Steam Turbines and their cycles - Call for experts
2012-02-10