International Standards and Conformity Assessment for all electrical, electronic and related technologies

SC 8A

Grid Integration of Renewable Energy Generation

 
export to xls file

SC 8A Working Documents since 2015-05-02

sort upsort down
Reference, Title
Downloads
sort down

Circulation

Date

sort upsort down

Closing

Date

sort upsort down
CENELEC

Voting /

Comment

Authorized

Committees

8A/24A/RM

Confirmed minutes of SC 8A meeting held in Stresa, Italy on October 1st, 2015.
2016-03-25
8A/26/AC

Set up Working Group (WG 2): Renewable energy power prediction and call for experts
2016-02-05
TC 82
TC 88
TC 95
TC 114
TC 115
TC 117
TC 120
8A/25/RVN

Result of voting on 8A/23/NP: Grid integration of renewable energy generation - Terms, definitions and symbols
2016-01-22?
8A/24/RM

This document has been replaced by 8A/24A/RM
2015-11-20
8A/23/NP

Grid integration of renewable energy generation - Terms, definitions and symbols
2015-09-182015-12-18?Voting Result
TC 82
TC 88
TC 114
TC 115
TC 117
TC 120
8A/21A/DA

Revised draft agenda for the meeting to be held in Stresa, Italy from 2015-10-01 (starting time: 09:00 AM) to 2014-10-01 (approximate finishing time: 05:30 PM)
2015-08-28
8A/22/PW

Programme of Work of SC 8A as recorded by the IEC Central Office in its database
2015-08-28
8A/20/RQ

Result of Questionnaire on 8A/17/Q: Proposal for a modified SC 8A title and scope following TC 8 / SC 8A / TC 88 / TC 82 / TC 114 scope harmonization meeting in Louisville, Colorado, USA, on March 3 - 4, 2015
2015-05-22
8A/21/DA

Draft agenda for the meeting to be held in Stresa, Italy from 2015-10-01 (starting time: 09:00 AM) to 2014-10-01 (approximate finishing time: 05:30 PM)
2015-05-22