International Standards and Conformity Assessment for all electrical, electronic and related technologies

ISO/IEC JTC 1/SC 25

Interconnection of information technology equipment

 
export to xls file

Other Documents accessible to ISO/IEC JTC 1/SC 25 since 2016-04-26

Reference, Title
Downloads

Circulation

Date

Closing

Date

CENELEC

Voting /

Comment

46C/1045/CD

IEC 61156-5 Ed 3.0: Multicore and symmetrical pair/quad cables for digital communications - Part 5: Symmetrical pair/quad cables with transmission characteristics up to 1 000 MHz - Horizontal floor wiring - Sectional specification

2016-05-13 2016-08-05 E Report of Comments
46C/1046/CD

IEC 61156-6 Ed 4.0: Multicore and symmetrical pair/quad cables for digital communications - Part 6: Symmetrical pair/quad cables with transmission characteristics up to 1 000 MHz - Work area wiring - Sectional specification

2016-05-13 2016-08-05 E Report of Comments
46C/1052A/CC

Compilation of Comments on 46C/1040/CD - IEC 61156-1-4: MULTICORE AND SYMMETRICAL PAIR/QUAD CABLES FOR DIGITAL COMMUNICATIONS - Part 1-4: Assessment of the conductor heating in bundled cables due to the deployment of power transmission based on IEEE802.3 PoE-regime

2017-01-06 E
46C/1063A/CC

Compilation of Comments on 46C/1045/CD - IEC 61156-5 Ed 3.0: Multicore and symmetrical pair/quad cables for digital communications - Part 5: Symmetrical pair/quad cables with transmission characteristics up to 1 000 MHz - Horizontal floor wiring - Sectional specification

2017-03-24 E
46C/1064A/CC

Compilation of Comments on 46C/1046/CD - IEC 61156-6 Ed 4.0: Multicore and symmetrical pair/quad cables for digital communications - Part 6: Symmetrical pair/quad cables with transmission characteristics up to 1 000 MHz - Work area wiring - Sectional specification

2017-03-24 E
46C/1067/CD

IEC 61156-1-4 ED1: Multicore and symmetrical pair/quad cables for digital communications - Assessment of the conductor heating in bundled cables due to the deployment of power transmission based on IEEE 802.3 PoE-regime

2017-02-24 2017-05-19 E
46C/1069/CD

IEC 61156-1-3/AMD1 ED1: Multicore and symmetrical pair/quad cables for digital communications - Part 1-3: Electrical transmission parameters for modelling cable assemblies using symmetrical pair/quad cables

2017-03-24 2017-06-16 E
46C/1070/CD

IEC 61156-5 ED3: Multicore and symmetrical pair/quad cables for digital communications - Part 5: Symmetrical pair/quad cables with transmission characteristics up to 1 000 MHz - Horizontal floor wiring - Sectional specification

2017-04-21 2017-07-14 E
46C/1071/CD

IEC 61156-6 ED4: Multicore and symmetrical pair/quad cables for digital communications - Part 6: Symmetrical pair/quad cables with transmission characteristics up to 1 000 MHz - Work area wiring - Sectional specification

2017-04-21 2017-07-14 E
64/2090A/RVN

Revised result of voting on 64/2067/NP: IEC 60364-7-716: Part 7XX: Requirements for special installations or locations - Direct Current Power Distribution over Information Technology Cable Infrastructure

2016-10-14 Y
64/2184/CD

IEC 60364-7-716 ED1: Low-Voltage electrical installations - Part 7-716: Requirements for special installations or locations – DC power distribution over Information Technology Cable Infrastructure

2017-02-24 2017-05-19 Y
86C/1382/CD

IEC 61282-15/TR/Ed1: Fibre optic communication system design guides - Part 15: Cable plant and link: Testing multi-fibre optic cable plant terminated with MPO connectors

2016-05-27 2016-08-19 U Report of Comments
86C/1418/CC

Compilatin of comments on 86C/1382/CD: IEC 61282-15/TR/Ed1: Fibre optic communication system design guides - Part 15: Cable plant and link: Testing multi-fibre optic cable plant terminated with MPO connectors

2016-11-04 U
86C/1427/DTR

IEC TR 61282-15 ED1: Fibre optic communication system design guides - Part 15: Cable plant and link: Testing multi-fibre optic cable plant terminated with MPO connectors

2016-11-25 2017-01-20 U Voting Result
86C/1443/RVDTR

Result of Voting on 86C/1427/DTR - IEC TR 61282-15 ED1: Fibre optic communication system design guides - Part 15: Cable plant and link: Testing multi-fibre optic cable plant terminated with MPO connectors

2017-02-17 U
108/674/CC

Compilation of comments on 108/639/CD: IEC 62368-3/Ed1: Audio/video, information and communication technology equipment - Safety - Part 3: DC power transfer through communication cables and ports

2016-11-18 Y
108/675/CDV

IEC 62368-3/Ed1: Audio/video, information and communication technology equipment - Safety - Part 3: DC power transfer through communication cables and ports

2017-01-13 2017-04-07 Y Voting Result