International Standards and Conformity Assessment for all electrical, electronic and related technologies

SC 65E

Les dispositifs et leur intégration dans les systèmes de l'entreprise

 
export to xls file

SC 65E Programme de Travail

sort up

Référence

Projet

sort upsort down
Stage

Référence

Document

Init.

Date

sort upsort down

Stage

Courant

sort upsort down

Prochain

Stage

sort upsort down
Mod
sort upsort down

Fcst. Publ.

Date

IEC 61804-2 Ed. 3.0  

Function blocks (FB) for process control and EDDL - Part 2: Specification of FB concept
1CD
  • 1CD
  • 1st Committee Draft
65E/251/CD2011-092012-062012-09no2013-12
IEC 61804-3 Ed. 3.0  

Function blocks (FB) for process control and EDDL - Part 3: EDDL specification and communication profiles
1CD
  • 1CD
  • 1st Committee Draft
65E/248/CD2011-092012-062012-09no2013-12
IEC 61804-4 Ed. 2.0  

Function blocks (FB) for process control - Part 4: EDD interpretation
1CD
  • 1CD
  • 1st Committee Draft
65E/283/CD2011-092012-102013-03no2013-12
IEC 61804-5 Ed. 1.0  

Function blocks (FB) for process control and EDDL - Part 5: EDDL Builtin library
1CD
  • 1CD
  • 1st Committee Draft
65E/249/CD2011-092012-062012-09no2013-12
IEC 61987-12 Ed. 1.0  

Mesure et commande dans les processus industriels - elements et structures de donnees dans les catalogues d'equipements de processus Partie 12: Listes de propriétés (LDP) pour les équipements de mesure de débit pour l'échange électronique de données
CCDV
  • CCDV
  • Draft circulated as Committee Draft with Vote
65E/284/CDV2011-032012-112013-05no2014-01
IEC 61987-13 Ed. 1.0  

Industrial-process measurement and control - Data structures and elements in process equipment catalogues. Part 13: Lists of properties (LOP) for Pressure Measuring Equipment for electronic data exchange
1CD
  • 1CD
  • 1st Committee Draft
65E/246/CD2011-032012-052012-10no2013-06
IEC 62264-1 Ed. 2.0  

Intégration du système de commande d' entreprise Partie 1: Modèles et terminologie
CDIS
  • CDIS
  • Draft circulated as FDIS
65E/285/FDIS2011-072013-012013-03no2013-04
IEC 62264-2 Ed. 2.0  

Intégration du système de commande d'Entreprise Partie 2: Modèles d'objets et attributs
RDIS
  • RDIS
  • Text for FDIS received and registered
65E/277/RVC2011-072012-102013-01no2013-04
IEC 62453-1 Ed. 2.0  

Field Device Tool (FDT) Interface Specification - Part 1 Overwiew and Guidance
AMW
  • AMW
  • Approved Maintenance Work
65E/275/RR2012-082012-082012-10no2014-04
IEC 62453-2 Ed. 2.0  

IEC 62453-2 Ed.1: Field Device Tool (FDT) Interface Specification - Part 2: Concepts and detailed Description
1CD
  • 1CD
  • 1st Committee Draft
65E/286/CD2012-082013-012013-05no2014-04
IEC 62453-301 Ed. 2.0  

Field Device Tool (FDT) Interface Specification - Part 30x: Communication Profile Integration - IEC 61784 CPF x
AMW
  • AMW
  • Approved Maintenance Work
65E/274/RR2012-082012-082012-10no2014-04
IEC 62453-41 Ed. 2.0  

Field device tool (FDT) interface specification series
AMW
  • AMW
  • Approved Maintenance Work
65E/272/RR2012-082012-082012-10no2014-04
IEC 62453-501-x Ed. 2.0  

Field Device Tool (FDT) Interface Specification - Part 50x: Communication implementation for common object model - IEC 61784 CPF x
AMW
  • AMW
  • Approved Maintenance Work
 2012-082012-082012-10no2014-04
IEC 62714-1 Ed. 1.0  

Format d'échange de données techniques pour une utilisation dans l'ingénierie des systèmes d'automatisation industrielle - AutomationML - Partie 1: Architecture et exigences générales
CCDV
  • CCDV
  • Draft circulated as Committee Draft with Vote
65E/280/CDV2011-032012-092013-03no2013-11
IEC 62714-2 Ed. 1.0  

Engineering data exchange format for use in industrial automation systems engineering (AutomationML) Part 2 - Role Libraries
1CD
  • 1CD
  • 1st Committee Draft
65E/250/CD2012-052012-062012-10no2014-01
IEC 62769-1 Ed. 1.0  

Devices and integration in enterprise systems; Field Device Integration - Part 1 Overview
2CD
  • 2CD
  • 2nd Committee Draft
65E/259/CD2012-012012-062012-09no2014-03
IEC 62769-2 Ed. 1.0  

Devices and integration in enterprise systems; Field Device Integration - Part 2: FDI Client
2CD
  • 2CD
  • 2nd Committee Draft
65E/260/CD2012-012012-062012-09no2014-03
IEC 62769-3 Ed. 1.0  

Devices and integration in enterprise systems; Field Device Integration - Part 3: FDI Server
2CD
  • 2CD
  • 2nd Committee Draft
65E/261/CD2012-012012-062012-09no2014-03
IEC 62769-4 Ed. 1.0  

Devices and integration in enterprise systems; Field Device Integration - Part 4: FDI Packages
2CD
  • 2CD
  • 2nd Committee Draft
65E/262/CD2012-012012-062012-09no 
IEC 62769-5 Ed. 1.0  

Devices and integration in enterprise systems; Field Device Integration - Part 5: FDI Information Model
2CD
  • 2CD
  • 2nd Committee Draft
65E/263/CD2012-012012-062012-09no2014-03
IEC 62769-6 Ed. 1.0  

Devices and integration in enterprise systems; Field Device Integration - Part6: Technology Mapping
2CD
  • 2CD
  • 2nd Committee Draft
65E/264/CD2012-012012-062012-09no2014-03
IEC 62769-7 Ed. 1.0  

Devices and integration in enterprise systems; Field Device Integration - Part 7: Communication Devices
2CD
  • 2CD
  • 2nd Committee Draft
65E/265/CD2012-012012-062012-09no2014-03
IEC/TR 62795 Ed. 1.0  

Interoperation Specifications of FDT/DTM and EDDL
CDTR
  • CDTR
  • Circulated Draft Technical Report
65E/240/DTR 2012-032012-08no2013-02
PNW 65e-279 Ed. 1.0  

Devices and integration in enterprise systems; Field Device Integration (FDI) - Profiles - Part 101-1_FDI- Profile Foundation H1, Part 101-2_FDI-Profile Foundation HSE, Part 103-1_FDI- Profile PROFIBUS, Part 103-4_FDI- Profile PROFINET, Part 109-1_FDI- Profile HART
PNW
  • PNW
  • Proposed New Work
65E/279/NP 2012-082013-01no 
PNW 65e-281 Ed. 1.0  

OPC enhancements
PNW
  • PNW
  • Proposed New Work
65E/281/NP 2012-092013-02no