International Standards and Conformity Assessment for all electrical, electronic and related technologies

SC 86C

Systèmes et dispositifs actifs à fibres optiques

 
export to xls file

SC 86C Programme de Travail (19)

sort up

Référence

Projet

Référence

Document

Init.

Date

sort upsort down

Stage

Courant

sort upsort down

Prochain

Stage

Working

Group

sort upsort down

Project

Leader

sort upsort down

Fcst. Publ.

Date

IEC 61280-4-1 Ed. 3.0  

Fibre-optic communication subsystem test procedures - Part 4-1: Installed cable plant - Multimode attenuation measurement
86C/1335/CD2015-06A2CD
  • A2CD
  • Approved for 2nd Committee Draft

2016-01

2CD
  • 2CD
  • 2nd Committee Draft

2016-05

WG 1Seymour Goldstein2016-11
IEC 61280-4-4 Ed. 2.0  

Fibre optic communication subsystem test procedures - Part 4-4: Cable plants and links - Polarization mode dispersion measurement for installed links
86C/1338/CD2015-06ACDV
  • ACDV
  • Draft approved for Committee Draft with Vote

2016-01

CCDV
  • CCDV
  • Draft circulated as Committee Draft with Vote

2016-03

WG 1Peter Pondillo2017-07
IEC 61281-1 Ed. 2.0  

Fibre optic communication subsystems - Part 1:Generic specification
86C/1363/CD2015-121CD
  • 1CD
  • 1st Committee Draft

2015-12

A2CD
  • A2CD
  • Approved for 2nd Committee Draft

2016-04

WG 1Yoshinori Yamamoto2017-04
IEC 61290-4-1 Ed. 2.0  

Amplificateurs optiques - Méthodes d'essai - Partie 4-1: Paramètres de gain transitoire - Méthode à deux longueurs d'onde
86C/1347/CDV2014-12CCDV
  • CCDV
  • Draft circulated as Committee Draft with Vote

2015-11

ADIS
  • ADIS
  • Approved for FDIS circulation

2016-05

WG 3Atul Srivastava2016-12
IEC 61291-5-2 Ed. 2.0  

Optical amplifiers - Part 5-2: Qualification specifications - Reliability qualification for optical fibre amplifiers
86C/1331/CD2013-11ACDV
  • ACDV
  • Draft approved for Committee Draft with Vote

2016-04

CCDV
  • CCDV
  • Draft circulated as Committee Draft with Vote

2016-06

WG 3Ian McClean2017-07
IEC 62150-5 Ed. 1.0  

Composants et dispositifs actifs à fibres optiques - Procédures d'essai et de mesure - Partie 5: Durée d'accordement des émetteurs accordables en longueurs d'onde sur un canal de longueur d'onde
86C/1356/CDV2014-11CCDV
  • CCDV
  • Draft circulated as Committee Draft with Vote

2016-01

ADIS
  • ADIS
  • Approved for FDIS circulation

2016-07

WG4Ms. Jie Hyun Lee2017-03
IEC 62343 Ed. 2.0  

Dynamic modules - General and guidance
86C/1373/RR2016-04AMW
  • AMW
  • Approved Maintenance Work

2016-04

CCDV
  • CCDV
  • Draft circulated as Committee Draft with Vote

2016-06

WG 5Greg Cowle2017-07
IEC 62343-6-10 Ed. 1.0  

Dynamic modules - Part 6-10: Design guide - Intermediate controller for multiple dynamic module systems
86C/1359/CD2015-121CD
  • 1CD
  • 1st Committee Draft

2015-12

A2CD
  • A2CD
  • Approved for 2nd Committee Draft

2016-04

WG 5Junya Kurumida2016-11
IEC/TR 62343-6-4 Ed. 1.0  

Dynamic modules - Design guides - Part 6-4: Reconfigurable optical add/drop multiplexer
86C/1361/CD2014-072CD
  • 2CD
  • 2nd Committee Draft

2015-12

A3CD
  • A3CD
  • Approved for 3rd Committee Draft

2016-04

WG 5Atul Srivastava 
PWI 86C-12 Ed. 1.0  

Future IEC 62343-5-2/Ed1: Dynamic modules - test methods - Part 5-2 : transient crosstalk measurement for wavelength selective switch (WSS)
  PWI
  • PWI
  • Preliminary work item

2012-11

 

WG 5Youhei Sakamaki 
PWI 86C-16 Ed. 1.0  

Future IEC 61292-8/TR/Ed1: Optical amplifiers - Part 8: High power amplifiers
  PWI
  • PWI
  • Preliminary work item

2012-11

 

WG 3Jutaro Miura 
PWI 86C-2 Ed. 1.0  

IEC 61280-4-4/Ed2: Fibre-optic communication subsystem test procedures - Part 4-4: Polarization mode dispersion measurement for installed links
  PWI
  • PWI
  • Preliminary work item

2010-10

 

Richard Ednay 
PWI 86C-23 Ed. 1.0  

Maintenance - IEC 61282-9/Ed1
  PWI
  • PWI
  • Preliminary work item

2013-11

 

WG 1Peter Pondillo 
PWI 86C-26 Ed. 1.0  

Maintenance - IEC 61290-4-1/Ed1
  PWI
  • PWI
  • Preliminary work item

2013-11

 

WG 3Atul Srivastava 
PWI 86C-27 Ed. 1.0  

Maintenance - IEC 62343-3-1/Ed1
  PWI
  • PWI
  • Preliminary work item

2013-11

 

WG 5Atul Srivastava 
PWI 86C-30 Ed. 1.0  

Future IEC 61282-15: Design guide on multi-fibre testing
  PWI
  • PWI
  • Preliminary work item

2015-10

 

WG 1Seymour Goldstein 
PWI 86C-31 Ed. 1.0  

Future IEC 62148-19: PIC packaging and interface standards (P-CSP)
  PWI
  • PWI
  • Preliminary work item

2015-10

 

WG 4Ichiro Ogura 
PWI 86C-32 Ed. 1.0  

Future IEC 62148-20: PIC packaging and interface standards (PIC-PKG)
  PWI
  • PWI
  • Preliminary work item

2015-10

 

WG 4 
PWI 86C-33 Ed. 1.0  

Future IEC 62149-10: RoF (Radio over Fiber) transceivers for Mobile front-haul
  PWI
  • PWI
  • Preliminary work item

2015-10

 

WG 4Seung-Hyun Cho