International Standards and Conformity Assessment for all electrical, electronic and related technologies

SC 65B

Measurement and control devices

 
export to xls file

SC 65B Work programme (27)

sort up

Project

Reference

Document

Reference

Init.

Date

sort upsort down

Current

Stage

sort upsort down

Next

Stage

Working

Group

sort upsort down

Project

Leader

sort upsort down

Fcst. Publ.

Date

IEC 60534-2-3 Ed. 3.0  

Industrial-process control valves - Part 2-3: Flow capacity - Test procedures
65B/909/CDV2012-03ADIS
  • ADIS
  • Approved for FDIS circulation

2014-08

DEC
  • DEC
  • Draft at Editing Check

2014-11

WG9M Riveland2015-04
IEC 60534-4 Ed. 4.0  

Industrial-process control valves - Part 4: Inspection and routine testing
65B/919/CD2014-02ACDV
  • ACDV
  • Draft approved for Committee Draft with Vote

2014-08

CCDV
  • CCDV
  • Draft circulated as Committee Draft with Vote

2014-10

WG9A Perego2016-02
IEC 60534-8-4 Ed. 3.0  

Industrial-process control valves - Part 8-4: Noise considerations - Prediction of noise generated by hydrodynamic flow
65B/910/CDV2012-04ADIS
  • ADIS
  • Approved for FDIS circulation

2014-08

DEC
  • DEC
  • Draft at Editing Check

2014-11

WG9A Glenn2015-04
IEC 61003-1 Ed. 3.0  

Industrial-process control systems - Instruments with analogue inputs and two- or multi-state outputs - Part 1: Methods of evaluating performance
65B/934/CDV2013-07CCDV
  • CCDV
  • Draft circulated as Committee Draft with Vote

2014-09

ADIS
  • ADIS
  • Approved for FDIS circulation

2015-03

WG6F Kai2015-10
IEC 61003-2 Ed. 2.0  

Industrial-process control systems - Instruments with analogue inputs and two- or multi-state outputs - Part 2: Guidance for inspection and routine testing
65B/935/CDV2013-07CCDV
  • CCDV
  • Draft circulated as Committee Draft with Vote

2014-09

ADIS
  • ADIS
  • Approved for FDIS circulation

2015-03

WG6F Kai2015-10
IEC 61131-10 Ed. 1.0  

XML Exchange Formats for Programs according to IEC 61131-3
65B/912/NP2014-07ANW
  • ANW
  • Approved New Work

2014-07

1CD
  • 1CD
  • 1st Committee Draft

2015-04

WG7R Simon2017-09
IEC 61131-2 Ed. 4.0  

Industrial-process measurement and control - Programmable controllers - Part 2: Equipment requirements and tests
65B/932/CD2014-041CD
  • 1CD
  • 1st Committee Draft

2014-06

A2CD
  • A2CD
  • Approved for 2nd Committee Draft

2014-09

B Kretschmann2017-02
IEC 61207-2 Ed. 2.0  

Expression of Performance of Gas Analyzers - Part 2: Oxygen in Gas (utilizing high-temperature electrochemical sensors)
65B/837/RR2012-08AMW
  • AMW
  • Approved Maintenance Work

2012-08

1CD
  • 1CD
  • 1st Committee Draft

2013-12

WG142016-06
IEC 61207-3 Ed. 3.0  

Expression of Performance of Gas Analyzers- Part 3: Paramagnetic oxygen analysers
65B/838/RR2012-08AMW
  • AMW
  • Approved Maintenance Work

2012-08

CCDV
  • CCDV
  • Draft circulated as Committee Draft with Vote

2014-10

WG14J Tatera2015-12
IEC 61207-6 Ed. 2.0  

Expression of Performance of Gas Analyzers- Part 6: Photometric analyzers
65B/947/FDIS2012-08CDIS
  • CDIS
  • Draft circulated as FDIS

2014-08

APUB
  • APUB
  • Draft approved for publication

2014-10

WG14J Tatera2014-12
IEC 61285 Ed. 3.0  

Industrial-process control - Safety of analyzer houses
65B/954/FDIS2012-08CDIS
  • CDIS
  • Draft circulated as FDIS

2014-10

APUB
  • APUB
  • Draft approved for publication

2014-12

WG14J Tatera2015-02
IEC 61515 Ed. 2.0  

Mineral insulated metal sheathed thermocouple cables and thermocouples
65B/936/CDV2011-12CCDV
  • CCDV
  • Draft circulated as Committee Draft with Vote

2014-09

ADIS
  • ADIS
  • Approved for FDIS circulation

2015-03

WG5M Gotoh2015-10
IEC 61987-21 Ed. 1.0  

Industrial-Process Measurement and Control - Data Structures and Elements in Process Equipment Catalogues Part 21:List of Properties (LOP) of process control valves for electronic data exchange - General structures
65B/926/CDV2011-07CCDV
  • CCDV
  • Draft circulated as Committee Draft with Vote

2014-07

ADIS
  • ADIS
  • Approved for FDIS circulation

2015-01

JWG17P Zgorzelski2015-08
IEC 61987-22 Ed. 1.0  

Industrial-Process Measurement and Control - Data Structures and Elements in Process Equipment Catalogues - Part 22: Lists of Properties (LOP) of control valves and actuators for electronic data exchange
65B/927/CDV2011-07CCDV
  • CCDV
  • Draft circulated as Committee Draft with Vote

2014-07

ADIS
  • ADIS
  • Approved for FDIS circulation

2015-01

JWG17P Zgorzelski2015-08
IEC 61987-23 Ed. 1.0  

Industrial-Process Measurement and Control - Data Structures and Elements in Process Equipment Catalogues Part 23: List of Properties (LOP) of valve actuators for electronic data exchange
65B/928/CDV2011-07CCDV
  • CCDV
  • Draft circulated as Committee Draft with Vote

2014-07

ADIS
  • ADIS
  • Approved for FDIS circulation

2015-01

P Zgorzelski2015-08
IEC 61987-24-1 Ed. 1.0  

Industrial-Process Measurement and Control - Data Structures and Elements in Process Equipment Catalogues Part 24-1: List of Properties (LOP) of positioners for electronic data exchange
65B/929/CDV2011-07CCDV
  • CCDV
  • Draft circulated as Committee Draft with Vote

2014-07

ADIS
  • ADIS
  • Approved for FDIS circulation

2015-01

P Zgorzelski2015-08
IEC 62828-1 Ed. 1.0  

Reference conditions and procedures for industrial measurement transmitters - Part 1: General procedures for all types of transmitters
65B/941/CD2012-083CD
  • 3CD
  • 3rd Committee Draft

2014-08

A4CD
  • A4CD
  • Approved for 4th Committee Draft

2014-12

WG 6R Redaelli2014-12
IEC 62828-2 Ed. 1.0  

Reference conditions and procedures for industrial measurement transmitters - Part 2: Specific procedures for pressure transmitters
65B/942/CD2012-082CD
  • 2CD
  • 2nd Committee Draft

2014-08

A4CD
  • A4CD
  • Approved for 4th Committee Draft

2014-12

WG6R Redaelli2014-12
IEC 62828-3 Ed. 1.0  

Reference conditions and procedures for testing industrial measurement transmitters - Part 3: Specific procedures for temperature transmitters
65B/946/CD2012-081CD
  • 1CD
  • 1st Committee Draft

2014-08

A2CD
  • A2CD
  • Approved for 2nd Committee Draft

2014-12

2014-12
IEC 62952-1 Ed. 1.0  

Power sources for a wireless communication device - Part 1: General requirements of power sources
65/562/NP2014-09ANW
  • ANW
  • Approved New Work

2014-09

1CD
  • 1CD
  • 1st Committee Draft

2014-12

WG16L Winkel2017-02
IEC 62952-2 Ed. 1.0  

Power sources for a wireless communication device - Part 2: Battery profile
65/562/NP2014-09ANW
  • ANW
  • Approved New Work

2014-09

1CD
  • 1CD
  • 1st Committee Draft

2014-12

WG16L Winkel2017-02
IEC 62952-3 Ed. 1.0  

Power sources for a wireless communication device - Part 3: Energy harvesting specification
65/562/NP2014-09ANW
  • ANW
  • Approved New Work

2014-09

1CD
  • 1CD
  • 1st Committee Draft

2015-04

WG16L WInkel2017-12
IEC/TR 61131-8 Ed. 3.0  

Industrial-process measurement and control - Programmable controllers
65B/925/RR2014-04AMW
  • AMW
  • Approved Maintenance Work

2014-04

CDTR
  • CDTR
  • Circulated Draft Technical Report

2016-07

WG7I Weber2017-03
IEC/TR 61832 Ed. 2.0  

Analyser Systems - Guide to Technical Enquiry and Bid Evaluation
65B/841/RR2012-08AMW
  • AMW
  • Approved Maintenance Work

2012-08

CDTR
  • CDTR
  • Circulated Draft Technical Report

2015-06

WG 14J Tatera 
IEC/TR 62010 Ed. 2.0  

Analyser Systems - Guidance for Maintenance Management
65B/842/RR2012-08AMW
  • AMW
  • Approved Maintenance Work

2012-08

CDTR
  • CDTR
  • Circulated Draft Technical Report

2015-02

WG14J Tatera2014-12
IEC/TR 62829 Ed. 1.0  

Chemometrics for Process Analytical Technologies
65B/812/NP2012-08ANW
  • ANW
  • Approved New Work

2012-08

CDTR
  • CDTR
  • Circulated Draft Technical Report

2014-02

PT 62829Dr M Maiwald2015-11
PNW 65B-953 Ed. 1.0  

Future IEC 61987-24-2 Ed.1: Industrial-Process Measurement and Control - Data Structures and Elements in Process Equipment Catalogues - Part 24-2: List of Properties (LOP) of valve/actuator accessories for electronic data exchange Future IEC 61987-24-3 Ed.1: Industrial-Process Measurement and Control - Data Structures and Elements in Process Equipment Catalogues - Part 24-3: List of Properties (LOP) of flow modification accessories for electronic data exchange
65B/953/NP PNW
  • PNW
  • Proposed New Work

2014-10

ANW
  • ANW
  • Approved New Work

2015-02

JWG17P. Zgorzelski2016-12