International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 101

Electrostatics

 
export to xls file

TC 101 Work programme (16)

sort up

Project

Reference

Document

Reference

Init.

Date

sort upsort down

Current

Stage

sort upsort down

Next

Stage

Working

Group

sort upsort down

Project

Leader

sort upsort down

Fcst. Publ.

Date

IEC 61340-2-3 Ed. 2.0  

Electrostatics - Part 2-3: Methods of test for determining the resistance and resistivity of solid materials used to avoid electrostatic charge accumulation
101/470/CDV2014-08CCDV
  • CCDV
  • Draft circulated as Committee Draft with Vote

2015-06

ADIS
  • ADIS
  • Approved for FDIS circulation

2015-12

MT 8P. Holdstock2016-07
IEC 61340-4-3 Ed. 2.0  

Electrostatics - Part 4-3: Standard test methods for specific applications - Footwear
101/487/CD2014-031CD
  • 1CD
  • 1st Committee Draft

2015-08

A2CD
  • A2CD
  • Approved for 2nd Committee Draft

2015-12

MT 9K. Duncan2016-12
IEC 61340-4-4 Ed. 3.0  

Electrostatics - Part 4-4: Standard test methods for specific applications - Electrostatic classification of flexible intermediate bulk containers (FIBC)
101/452/RR2014-10AMW
  • AMW
  • Approved Maintenance Work

2014-10

1CD
  • 1CD
  • 1st Committee Draft

2016-07

JMT 7P. Holdstock2017-08
IEC 61340-4-5 Ed. 2.0  

Electrostatics - Part 4-5: Standard test methods for specific applications - Methods for characterizing the electrostatic protection of footwear and flooring in combination with a person
101/488/CD2014-031CD
  • 1CD
  • 1st Committee Draft

2015-08

A2CD
  • A2CD
  • Approved for 2nd Committee Draft

2015-12

MT 9K. Duncan2016-12
IEC 61340-4-7 Ed. 2.0  

Electrostatics - Part 4-7: Standard test methods for specific applications - Ionization
101/445/CDV2011-03ADIS
  • ADIS
  • Approved for FDIS circulation

2015-06

DEC
  • DEC
  • Draft at Editing Check

2015-09

WG 5K. Duncan2016-02
IEC 61340-4-9 Ed. 2.0  

Electrostatics - Part 4-9: Standard test methods for specific applications - Garments
101/433/CDV2011-03ADIS
  • ADIS
  • Approved for FDIS circulation

2015-06

DEC
  • DEC
  • Draft at Editing Check

2015-09

WG 5J. Kinnear2016-02
IEC 61340-5-1 Ed. 2.0  

Electrostatics - Part 5-1: Protection of electronic devices from electrostatic phenomena - General requirements
101/465/CDV2011-03CCDV
  • CCDV
  • Draft circulated as Committee Draft with Vote

2015-05

ADIS
  • ADIS
  • Approved for FDIS circulation

2015-11

WG 5J. Kinnear2016-06
IEC 61340-6-1 Ed. 1.0  

Electrostatic Control in Health Care Facilities
101/466/NP2015-07ANW
  • ANW
  • Approved New Work

2015-07

1CD
  • 1CD
  • 1st Committee Draft

2016-09

PT 61340-6-1T. Viheriaekoski2018-06
IEC/TR 61340-5-2 Ed. 2.0  

Electrostatics - Part 5-2: Protection of electronic devices from electrostatic phenomena - User guide
101/393A/RR2013-03AMW
  • AMW
  • Approved Maintenance Work

2013-03

1CD
  • 1CD
  • 1st Committee Draft

2016-02

WG 5L. Fast2016-04
ISO 18080-1 Ed. 1.0  

Textiles - Test methods for evaluating the electrostatic propensity of fabrics - Part 1: Test method using corona charging
101/490/FDIS2013-06CDIS
  • CDIS
  • Draft circulated as FDIS

2015-08

 

JWG 14P. Holdstock2015-11
ISO 18080-2 Ed. 1.0  

Textiles - Test methods for evaluating the electrostatic propensity of fabrics - Part 2: Test method using rotary mechanical friction
101/491/FDIS2013-06CDIS
  • CDIS
  • Draft circulated as FDIS

2015-08

 

JWG 14P. Holdstock2015-11
ISO 18080-3 Ed. 1.0  

Textiles - Test methods for evaluating the electrostatic propensity of fabrics - Part 3: Test method using manual friction
101/492/FDIS2013-06CDIS
  • CDIS
  • Draft circulated as FDIS

2015-08

 

JWG 14P. Holdstock2015-11
ISO 18080-4 Ed. 1.0  

Textiles - Test methods for evaluating the electrostatic propensity of fabrics - Part 4: Test method using horizontal mechanical friction
101/493/FDIS2013-06CDIS
  • CDIS
  • Draft circulated as FDIS

2015-08

 

JWG 14P. Holdstock2015-11
PWI/TR 101-1 Ed. 1.0  

Packaging systems used in electronic manufacturing
  PWI
  • PWI
  • Preliminary work item

2012-08

 

JWG 13D. Swenson 
PWI/TR 101-2 Ed. 1.0  

Compliance verification
  PWI
  • PWI
  • Preliminary work item

2012-06

 

WG 5B. Grootemaat 
PWI/TR 101-3 Ed. 1.0  

Automated handling equipment and processes
  PWI
  • PWI
  • Preliminary work item

2012-06

 

WG 5B. Grootemaat