International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 21

Secondary cells and batteries

 
export to xls file

TC 21 Work programme (11)

sort up

Project

Reference

Document

Reference

Init.

Date

sort upsort down

Current

Stage

sort upsort down

Next

Stage

Working

Group

sort upsort down

Project

Leader

sort upsort down

Fcst. Publ.

Date

IEC 61427-2 Ed. 1.0  

Secondary cells and batteries for Renewable Energy Storage - General Requirements and methods of test - Part 2: On-grid application
21/825A/CD2011-103CD
  • 3CD
  • 3rd Committee Draft

2013-12

A4CD
  • A4CD
  • Approved for 4th Committee Draft

2014-04

JWG 82H. Giess2014-10
IEC 61982-4 Ed. 1.0  

Secondary batteries (except lithium) for the propulsion of electric road vehicles - Safety requirements of nickel-metal hydride batteries
21/806/NP2013-09ANW
  • ANW
  • Approved New Work

2013-09

1CD
  • 1CD
  • 1st Committee Draft

2014-06

JWG 69 Pb-NiJ. Nishimura2016-10
IEC 62485-1 Ed. 1.0  

Safety requirements for secondary batteries and battery installations - Part 1: General safety information
21/821/CDV2011-10CCDV
  • CCDV
  • Draft circulated as Committee Draft with Vote

2013-12

ADIS
  • ADIS
  • Approved for FDIS circulation

2014-06

PT 62485F. Kramm2015-02
IEC 62485-3 Ed. 2.0  

Safety requirements for secondary batteries and battery installations - Part 3: Traction batteries
21/834/FDIS2012-03CDIS
  • CDIS
  • Draft circulated as FDIS

2014-04

APUB
  • APUB
  • Draft approved for publication

2014-06

PT 62485O. Lind2014-07
IEC 62485-4 Ed. 1.0  

Safety requirements for secondary batteries and battery installations - Part 4: Valve regulated lead acid batteries for use in portable appliances
21/820/CDV2011-01CCDV
  • CCDV
  • Draft circulated as Committee Draft with Vote

2013-12

ADIS
  • ADIS
  • Approved for FDIS circulation

2014-06

PT 62485 / MT6T. Yoshimine / F. Kramm2015-01
IEC 62660-3 Ed. 1.0  

Secondary lithium-ion cells for the propulsion of electric road vehicles - Part 3: Safety requirements of cells and modules
21/817/CD2013-05A2CD
  • A2CD
  • Approved for 2nd Committee Draft

2014-01

2CD
  • 2CD
  • 2nd Committee Draft

2014-08

JWG69 LiA. Ilyama2016-04
IEC 62877-1 Ed. 1.0  

Electrolyte and water for vented Lead Acid accumulators - Part 1: requirements for electrolyte
21/791/NP2013-05ANW
  • ANW
  • Approved New Work

2013-05

CCDV
  • CCDV
  • Draft circulated as Committee Draft with Vote

2013-10

PT 62877F. Kramm2015-07
IEC 62877-2 Ed. 1.0  

Electrolyte and water for vented Lead Acid accumulators - Part 2: requirements for water
21/792/NP2013-05ANW
  • ANW
  • Approved New Work

2013-05

CCDV
  • CCDV
  • Draft circulated as Committee Draft with Vote

2013-10

PT62877F. Kramm2015-07
PNW 21-819 Ed. 1.0  

Flow batteries - General requirement and test method of vanadium flow batteries
21/819/NP PNW
  • PNW
  • Proposed New Work

2013-10

ANW
  • ANW
  • Approved New Work

2014-02

H. Zhang 
PNW 21-823 Ed. 1.0  

Flow Battery Technologies - Safety
21/823/NP PNW
  • PNW
  • Proposed New Work

2013-11

ANW
  • ANW
  • Approved New Work

2014-03

N. Shiga 
PNW 21-829 Ed. 1.0  

Secondary Cells and Batteries of the Flow Type: Flow Batteries - Guidance on the Specification,Installation and Operation
21/829/NP PNW
  • PNW
  • Proposed New Work

2014-02

ANW
  • ANW
  • Approved New Work

2014-07

B. Ruiz Castello