International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 82

Systèmes de conversion photovoltaïque de l'énergie solaire

 
export to xls file

TC 82 Programme de Travail (69)

Référence

Projet

Référence

Document

Init.

Date

Stage

Courant

Prochain

Stage

Working

Group

Project

Leader

Fcst. Publ.

Date

82/1253/NP PRVN
  • PRVN
  • Preparation of RVN document

2017-05

2017-06

WG 6 Shuichi Sugahara 2018-08
82/1278/NP PNW
  • PNW
  • New Work Item Proposal

2017-04

PRVN
  • PRVN
  • Preparation of RVN document

2017-07

WG 6 Sarah Kurtz 2018-12
prePNW
  • prePNW
  • Preparation of NP

2017-07

PNW
  • PNW
  • Proposed New Work

WG 2 Paul Robusto 2019-02
82/909/RR 2014-11 ACDV
  • ACDV
  • Approved for CDV

2014-11

TCDV
  • TCDV
  • Translation of CDV

2017-06

WG 2 T. Sample 2017-12
82/1289/CD 2016-02 CD
  • CD
  • Draft circulated as CD

2017-05

PCC
  • PCC
  • Preparation of CC document

2017-08

WG 2 Vahid Fakhfouri 2018-03
IEC 60904-3 ED4

Dispositifs photovoltaïques - Partie 3: Principes de mesure des dispositifs solaires photovoltaïques (PV) à usage terrestre incluant les données de l'éclairement spectral de référence

2017-07 ACDV
  • ACDV
  • Approved for CDV

2017-07

TCDV
  • TCDV
  • Translation of CDV

2017-08

WG 2 Stefan Winter 2018-03
82/1194/RR 2016-10 ACD
  • ACD
  • Approved for CD

2016-10

CD
  • CD
  • Draft circulated as CD

2017-06

WG 2 H. Muellejans 2018-12
82/910/RR 2014-11 ACDV
  • ACDV
  • Approved for CDV

2014-11

TCDV
  • TCDV
  • Translation of CDV

2017-06

WG 2 S. Winter 2017-12
82/879/RR 2014-08 ACDV
  • ACDV
  • Approved for CDV

2014-08

TCDV
  • TCDV
  • Translation of CDV

2017-06

WG 2 W. Herrmann 2018-01
82/972/NP 2015-08 ACD
  • ACD
  • Approved for CD

2015-08

CD
  • CD
  • Draft circulated as CD

2017-12

WG 7 S. Askins 2017-06
IEC 60904-10 ED3

Dispositifs photovoltaïques - Partie 10: Méthodes de mesure de la linéarité

82/1261/RR 2017-03 ACD
  • ACD
  • Approved for CD

2017-03

CD
  • CD
  • Draft circulated as CD

2017-06

WG 2 Elena Salis 2018-12
82/1303/CD 2012-04 CD
  • CD
  • Draft circulated as CD

2017-06

PCC
  • PCC
  • Preparation of CC document

2017-09

WG 8 H. Jin 2018-01
82/1109/CD 2014-11 CDM
  • CDM
  • CD to be discussed at Meeting

2017-04

2017-06

WG 2 P. Hacke 2017-05
82/1292/DTS 2015-01 CDTS
  • CDTS
  • Draft circulated as DTS

2017-06

PRVDTS
  • PRVDTS
  • Preparation of RVDTS

2017-08

WG 2 P. Hacke 2018-04
82/1086/RR 2016-02 ACD
  • ACD
  • Approved for CD

2016-02

CD
  • CD
  • Draft circulated as CD

2017-03

WG 6 V. Salas 2018-12
IEC 61701 ED3

Essai de corrosion au brouillard salin des modules photovoltaïques (PV)

82/1219/RR 2016-12 ACD
  • ACD
  • Approved for CD

2016-12

CD
  • CD
  • Draft circulated as CD

2017-04

WG 2 Sean Fowler 2018-10
IEC 61730-1/AMD1 ED2

Amendement 1 - Qualification pour la sûreté de fonctionnement des modules photovoltaïques (PV) - Partie 1: Exigences pour la construction

82/1241/RR 2017-01 ACDV
  • ACDV
  • Approved for CDV

2017-01

TCDV
  • TCDV
  • Translation of CDV

2017-07

WG 2 Nancy Phillips 2018-12
82/1066/CD 2015-02 ACDV
  • ACDV
  • Approved for CDV

2016-04

TCDV
  • TCDV
  • Translation of CDV

2017-06

WG 2 Th. Huld 2018-01
82/1067/CD 2015-02 ACDV
  • ACDV
  • Approved for CDV

2016-04

TCDV
  • TCDV
  • Translation of CDV

2017-06

WG 2 Th. Huld 2018-01
82/862/RR 2014-06 ACD
  • ACD
  • Approved for CD

2014-06

CD
  • CD
  • Draft circulated as CD

2017-01

WG 6 H. Igarashi 2017-12
82/1239/CD 2012-05 ACDV
  • ACDV
  • Approved for CDV

2017-05

TCDV
  • TCDV
  • Translation of CDV

2017-12

WG 6 J. Kalfus 2017-10
82/1201/DTS

2014-07 APUB
  • APUB
  • Approved for publication

2017-02

TPUB
  • TPUB
  • Translation of publication

2017-05

JWG 1 Hironobu Igarashi 2017-09
82/871/RR 2014-07 ADTS
  • ADTS
  • Approved for DTS

2014-07

TDTS
  • TDTS
  • Translation of DTS

2017-06

JWG 1 Hironobu Igarashi 2018-01
82/871/RR 2014-07 ADTS
  • ADTS
  • Approved for DTS

2014-07

TDTS
  • TDTS
  • Translation of DTS

2017-06

JWG 1 Wuthipong Suponthana 2018-01
82/1198/NP 2017-02 ACD
  • ACD
  • Approved for CD

2017-02

CD
  • CD
  • Draft circulated as CD

2017-10

JWG 1 Christopher West 2018-10
82/871/RR 2014-07 ADTS
  • ADTS
  • Approved for DTS

2014-07

TDTS
  • TDTS
  • Translation of DTS

2017-06

JWG 1 R. Kumar 2018-01
82/1236/RR 2017-01 ACD
  • ACD
  • Approved for CD

2017-01

CD
  • CD
  • Draft circulated as CD

2017-06

JWG 1 Arne Jacobson 2018-06
82/1279/DTS 2014-07 CDTS
  • CDTS
  • Draft circulated as DTS

2017-04

PRVDTS
  • PRVDTS
  • Preparation of RVDTS

2017-07

JWG 1 A. Jacobson 2018-03
82/1199/NP 2017-02 ACD
  • ACD
  • Approved for CD

2017-02

CD
  • CD
  • Draft circulated as CD

2017-10

JWG 1 Christopher West 2018-10
82/1274/DPAS

BPUB
  • BPUB
  • Being published

2017-07

PPUB
  • PPUB
  • Publication issued

2017-08

2017-08
IEC 62446-1/AMD1 ED1

Systèmes photovoltaïques (PV) - Exigences pour les essais, la documentation et la maintenance - Partie 1: Systèmes connectés au réseau électrique - Documentation, essais de mise en service et examen

82/1314/RR 2017-07 TCDV
  • TCDV
  • Translation of CDV

2017-07

CCDV
  • CCDV
  • Draft circulated as CDV

2017-08

WG 3 Martin Cotterell 2018-10
82/1164/CD 2015-08 ACDV
  • ACDV
  • Approved for CDV

2016-12

TCDV
  • TCDV
  • Translation of CDV

2017-04

WG 3 G. Ball 2017-06
82/1299/FDIS 2010-10 CFDIS
  • CFDIS
  • Draft circulated as FDIS

2017-06

PRVD
  • PRVD
  • Preparation of RVD document

2017-07

WG 7 K. Villegas 2017-10
82/1291/DTS 2011-06 CDTS
  • CDTS
  • Draft circulated as DTS

2017-06

PRVDTS
  • PRVDTS
  • Preparation of RVDTS

2017-08

WG 3 G. Ball 2018-04
82/673/NP 2012-02 ACD
  • ACD
  • Approved for CD

2012-02

CD
  • CD
  • Draft circulated as CD

2016-12

WG 7 C. Algora 2018-01
IEC 62788-1-6/AMD1 ED1

Procédures de mesure des matériaux utilisés dans les modules photovoltaïques - Partie 1-6: Encapsulants - Méthodes d'essai pour déterminer le degré de durcissement dans l'éthylène-acétate de vinyle

82/1308/RR 2017-06 ACD
  • ACD
  • Approved for CD

2017-06

CD
  • CD
  • Draft circulated as CD

2017-09

WG 2 David Miller 2018-07
82/1189/DTS

2013-03 BPUB
  • BPUB
  • Being published

2017-07

PPUB
  • PPUB
  • Publication issued

2017-08

WG 2 J. Jung 2017-08
82/1102/NP 2016-07 ACD
  • ACD
  • Approved for CD

2016-07

CD
  • CD
  • Draft circulated as CD

2017-03

WG 2 M. Kempe 2018-09
82/1103/NP 2016-07 ACD
  • ACD
  • Approved for CD

2016-07

CD
  • CD
  • Draft circulated as CD

2017-03

WG 2 M. Kempe 2018-09
82/1104/NP 2016-07 ACD
  • ACD
  • Approved for CD

2016-07

CD
  • CD
  • Draft circulated as CD

2017-07

WG 2 Michael Kempe 2018-09
82/1202/NP 2017-05 ACD
  • ACD
  • Approved for CD

2017-05

CD
  • CD
  • Draft circulated as CD

2017-10

WG 2 Nick Bosco 2018-10
82/1212/DTS

2015-03 RPUB
  • RPUB
  • Publication received and registered

2017-07

BPUB
  • BPUB
  • Publication being printed

2017-10

WG 2 Nancy Phillips 2017-10
82/1309/CD 2016-09 CD
  • CD
  • Draft circulated as CD

2017-06

PCC
  • PCC
  • Preparation of CC document

2017-09

WG 2 G. Volberg 2017-11
82/1203/NP ACD
  • ACD
  • Approved for CD

2017-06

CD
  • CD
  • Draft circulated as CD

2017-12

WG 2 Peter Hacke
82/1238/CD 2016-02 ADTS
  • ADTS
  • Approved for DTS

2017-05

TDTS
  • TDTS
  • Translation of DTS

2017-12

WG 2 Peter Hacke 2017-10
IEC 62805-1 ED1

Méthode de mesure du verre photovoltaïque (PV) - Partie 1: Mesurage de la brume totale et de la répartition spectrale de la brume

82/1297/FDIS 2012-06 CFDIS
  • CFDIS
  • Draft circulated as FDIS

2017-06

PRVD
  • PRVD
  • Preparation of RVD document

2017-07

WG 2 Xiao Pengjun 2017-10
IEC 62805-2 ED1

Méthode de mesure du verre photovoltaïque (PV) - Partie 2: Mesurage du facteur de transmission et du facteur de réflexion

82/1298/FDIS 2012-06 CFDIS
  • CFDIS
  • Draft circulated as FDIS

2017-06

PRVD
  • PRVD
  • Preparation of RVD document

2017-07

WG 2 Xiao Pengjun 2017-10
IEC 62817/AMD1 ED1

Amendement 1 - Systèmes photovoltaïques - Qualification de conception des suiveurs solaires

82/1018/CDV BPUB
  • BPUB
  • Being published

2017-06

PPUB
  • PPUB
  • Publication issued

2017-07

WG 7 M. Muller
82/866/CDV 2013-08 AFDIS
  • AFDIS
  • Approved for FDIS

2015-01

TFDIS
  • TFDIS
  • Translation of FDIS

2017-03

WG 6 V. Salas Merino 2017-06
82/1200/CD 2016-03 ACDV
  • ACDV
  • Approved for CDV

2017-02

TCDV
  • TCDV
  • Translation of CDV

2017-07

WG 2 N. Bosco 2018-03
82/1190/CD 2016-04 ACDV
  • ACDV
  • Approved for CDV

2017-01

TCDV
  • TCDV
  • Translation of CDV

2017-07

WG 2 D. Miller 2018-03
82/1264/CD ADTS
  • ADTS
  • Approved for DTS

2017-06

2017-09

WG 2 J. Althaus
IEC 62920 ED1

Systèmes de production d'énergie photovoltaïque - Exigences de CEM et méthodes d'essai pour les équipements de conversion de puissance

82/1288/FDIS


2014-02 BPUB
  • BPUB
  • Being published

2017-06

PPUB
  • PPUB
  • Publication issued

2017-08

WG 6 Y. Yoshioka 2017-08
82/1195/CDV 2014-05 AFDIS
  • AFDIS
  • Approved for FDIS

2017-04

TFDIS
  • TFDIS
  • Translation of FDIS

2017-08

WG 2 J. Althaus 2018-03
82/1269/FDIS

2015-01 BPUB
  • BPUB
  • Being published

2017-06

PPUB
  • PPUB
  • Publication issued

2017-08

WG 2 Y. Uchida 2017-08
82/888/NP 2015-01 ACD
  • ACD
  • Approved for CD

2015-01

CD
  • CD
  • Draft circulated as CD

2017-12

WG 2 Jonghwa Song 2017-12
82/1281/DTS 2015-02 CDTS
  • CDTS
  • Draft circulated as DTS

2017-04

PRVDTS
  • PRVDTS
  • Preparation of RVDTS

2017-07

WG 7 R. Leutz 2018-03
82/1220/CD 2015-03 ACDV
  • ACDV
  • Approved for CDV

2017-03

TCDV
  • TCDV
  • Translation of CDV

2017-09

PT 62994-1 Changho Lim 2018-02
82/1217/CD 2015-07 ADTS
  • ADTS
  • Approved for DTS

2017-03

TDTS
  • TDTS
  • Translation of DTS

2017-09

WG 3 R. Hill 2018-01
82/973/NP 2015-08 ACD
  • ACD
  • Approved for CD

2015-08

CD
  • CD
  • Draft circulated as CD

2017-06

WG 6 N. Bogdanski 2017-06
82/1234/DTS

2016-02 APUB
  • APUB
  • Approved for publication

2017-06

TPUB
  • TPUB
  • Translation of publication

2017-06

WG 3 S.Kurtz 2017-10
82/1055/NP 2016-10 ACD
  • ACD
  • Approved for CD

2016-10

CD
  • CD
  • Draft circulated as CD

2017-03

WG 2 H.-A. Kim 2019-03
82/1163/NP 2016-12 ACD
  • ACD
  • Approved for CD

2016-12

CD
  • CD
  • Draft circulated as CD

2018-03

WG 7 Bruce Wang 2020-03
82/1167/NP 2016-12 ACD
  • ACD
  • Approved for CD

2016-12

CD
  • CD
  • Draft circulated as CD

2018-03

WG 6 Hirofumi SHINOHARA 2019-12
82/1168/NP 2016-12 ACD
  • ACD
  • Approved for CD

2016-12

CD
  • CD
  • Draft circulated as CD

2018-03

WG 6 Hirofumi SHINOHARA 2019-12
82/1187/NP 2017-02 ACD
  • ACD
  • Approved for CD

2017-02

CD
  • CD
  • Draft circulated as CD

2018-01

WG 6 Jim Eichner 2019-06
82/1216/NP 2017-03 ACD
  • ACD
  • Approved for CD

2017-03

CD
  • CD
  • Draft circulated as CD

2017-10

WG 2 Tony Sample 2019-04
82/1237/NP 2017-06 ACD
  • ACD
  • Approved for CD

2017-06

CD
  • CD
  • Draft circulated as CD

2017-10

WG 2 Timothy Silverman 2019-04
2017-07 TDTR
  • TDTR
  • Translation of DTR

2017-07

CDTR
  • CDTR
  • Circulation of DTR

2017-09