International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 82

Solar photovoltaic energy systems

 
export to xls file

TC 82 Work programme (66)

Project

Reference

Document

Reference

Init.

Date

Current

Stage

Next

Stage

Working

Group

Project

Leader

Fcst. Publ.

Date

PNW 82-1163 ED1

Solar trackers - Safety requirements

82/1163/NP PRVN
  • PRVN
  • Preparation of RVN

2016-11

2016-12

WG 7 Shitao Wang 2018-12
PNW TS 82-1167 ED1

Basic requirements for simulator used for testing of photovoltaic power conversion equipment - Part 1: AC power simulator

82/1167/NP PRVN
  • PRVN
  • Preparation of RVN document

2016-12

2017-01

WG 6 H. Shinohara 2018-10
PNW TS 82-1168 ED1

Basic requirements for simulator used for testing of photovoltaic power conversion equipment - Part 2: DC power simulator

82/1168/NP PRVN
  • PRVN
  • Preparation of RVN document

2016-12

2017-01

WG 6 H. Shinohara 2018-10
PNW 82-1198 ED1

Recommendations for renewable energy and hybrid systems for rural electrification - Part 7-4: Generators - Integration of solar with other forms of power generation within hybrid power systems (proposed IEC 62257-7-4 TS)

82/1198/NP PNW
  • PNW
  • New Work Item Proposal

2016-11

PRVN
  • PRVN
  • Preparation of RVN document

2017-01

JWG 1 Ch. West 2019-06
PNW 82-1199 ED1

Recommendations for renewable energy and hybrid systems for rural electrification - Part 9-7: Selection of inverters (proposed IEC 62257-9-7 TS)

82/1199/NP PNW
  • PNW
  • New Work Item Proposal

2016-11

PRVN
  • PRVN
  • Preparation of RVN document

2017-01

JWG 1 Ch. West 2019-12
PNW TS 82-1202 ED1

Measurement procedures for materials used in photovoltaic modules - Part 6-3: Adhesion testing of interfaces within PV modules (proposed IEC 62788-6-3 TS)

82/1202/NP PNW
  • PNW
  • New Work Item Proposal

2016-11

PRVN
  • PRVN
  • Preparation of RVN document

2017-02

WG 2 N. Bosco 2019-09
PNW TS 82-1203 ED1

Photovoltaic (PV) modules - Test methods for the detection of potential-induced degradation - Part 1-1: Delamination for crystalline silicon PV modules (proposed IEC 62804-1-1 TS)

82/1203/NP PNW
  • PNW
  • New Work Item Proposal

2016-11

PRVN
  • PRVN
  • Preparation of RVN document

2017-02

P. Hacke 2019-09
PNW TS 82-1216

Guidelines for qualifying PV modules, components and materials for operation at higher temperatures

82/1216/NP PNW
  • PNW
  • New Work Item Proposal

2016-12

PRVN
  • PRVN
  • Preparation of RVN document

2017-03

WG 2 Tony Sample 2019-09
IEC 60904-1 ED3

Photovoltaic devices - Part 1: Measurement of photovoltaic current-voltage characteristics

82/909/RR 2014-11 ACDV
  • ACDV
  • Approved for CDV

2014-11

TCDV
  • TCDV
  • Translation of CDV

2016-05

WG 2 T. Sample 2017-04
IEC 60904-1-1 ED1

Photovoltaic devices - Part 1-1: Measurement of current-voltage characteristics of multi-junction photovoltaic devices

82/1053/CDV 2013-09 AFDIS
  • AFDIS
  • Approved for FDIS

2016-05

TFDIS
  • TFDIS
  • Translation of FDIS

2016-12

WG 2 H. Muellejans 2017-06
IEC TS 60904-1-2 ED1

Photovoltaic devices - Part 1-2: Measurement of current-voltage characteristics of bifacial photovoltaic (PV) devices

82/1044/NP 2016-02 ACD
  • ACD
  • Approved for CD

2016-02

CD
  • CD
  • Draft circulated as CD

2016-08

WG 2 V. Fakhfouri 2018-06
IEC 60904-4 ED2

Photovoltaic devices - Part 4: Reference solar devices - Procedures for establishing calibration traceability

82/1194/RR 2016-10 ACD
  • ACD
  • Approved for CD

2016-10

CD
  • CD
  • Draft circulated as CD

2017-06

WG 2 H. Muellejans 2018-12
IEC 60904-7 ED4

Photovoltaic devices - Part 7: Computation of the spectral mismatch correction for measurements of photovoltaic devices

82/910/RR 2014-11 ACDV
  • ACDV
  • Approved for CDV

2014-11

TCDV
  • TCDV
  • Translation of CDV

2016-05

WG 2 S. Winter 2017-04
IEC 60904-8-1 ED1

Photovoltaic devices - Part 8-1: Measurement of spectral responsivity of multi-junction photovoltaic (PV) devices

82/1054/CDV 2013-09 AFDIS
  • AFDIS
  • Approved for FDIS

2016-05

TFDIS
  • TFDIS
  • Translation of FDIS

2016-12

WG 2 H. Muellejans 2017-06
IEC 60904-9 ED3

Photovoltaic devices - Part 9: Solar simulator performance requirements

82/879/RR 2014-08 ACDV
  • ACDV
  • Approved for CDV

2014-08

TCDV
  • TCDV
  • Translation of CDV

2016-06

WG 2 W. Herrmann 2017-05
IEC 60904-9-1 ED1

Photovoltaic devices - Part 9-1: Collimated beam solar simulator performance requirements

82/972/NP 2015-08 ACD
  • ACD
  • Approved for CD

2015-08

CD
  • CD
  • Draft circulated as CD

2016-09

WG 7 S. Askins 2017-06
IEC 60904-11 ED1

Photovoltaic devices - Part 11: Measurement of initial light-induced degradation of crystalline silicon solar cells and photovoltaic modules

82/654/NP 2012-04 ACD
  • ACD
  • Approved for CD

2012-04

CD
  • CD
  • Draft circulated as CD

2016-06

WG 8 H. Jin 2017-05
IEC TS 60904-12 ED1

Photovoltaic devices - Part 12: Infrared thermography of photovoltaic modules

82/1109/CD 2014-11 PCC
  • PCC
  • Preparation of CC document

2016-07

2016-08

WG 2 P. Hacke 2017-05
IEC TS 60904-13 ED1

Photovoltaic devices - Part 13: Electroluminescence of photovoltaic modules

82/1062/CD 2015-01 ADTS
  • ADTS
  • Approved for DTS

2016-04

CDTS
  • CDTS
  • Draft circulated as DTS

2016-09

WG 2 P. Hacke 2017-04
IEC 61215-1-5 ED1

Terrestrial photovoltaic (PV) modules - Design qualification and type approval - Part 1-5: Special requirements for testing of flexible (non-glass superstrate) photovoltaic (PV) modules

82/983/NP 2015-11 ACD
  • ACD
  • Approved for CD

2015-11

CD
  • CD
  • Draft circulated as CD

2016-11

WG 2 P. Robusto 2017-08
IEC 61683 ED2

Photovoltaic systems - Power conditioners - Procedure for measuring efficiency

82/1086/RR 2016-02 ACD
  • ACD
  • Approved for CD

2016-02

CD
  • CD
  • Draft circulated as CD

2017-03

WG 6 V. Salas 2018-12
IEC 61701 ED3

Salt mist corrosion testing of photovoltaic (PV) modules

82/1219/RR 2016-12 ACD
  • ACD
  • Approved for CD

2016-12

2017-04

WG 2 Sean Fowler 2018-10
IEC 61724-1 ED1

Photovoltaic system performance - Part 1: Monitoring

82/1215/FDIS 2015-03 CFDIS
  • CFDIS
  • Draft circulated as FDIS

2016-12

PRVD
  • PRVD
  • Preparation of RVD document

2017-01

WG 3 2017-03
IEC TS 61724-4 ED1

Photovoltaic system performance - Part 4: Degradation rate evaluation method

82/1061/NP 2016-07 ACD
  • ACD
  • Approved for CD

2016-07

CD
  • CD
  • Draft circulated as CD

2017-03

WG 3 S. Kurtz 2018-03
IEC 61853-3 ED1

Photovoltaic (PV) module performance testing and energy rating - Part 3: Energy Rating of PV Modules

82/1066/CD 2015-02 ACDV
  • ACDV
  • Approved for CDV

2016-04

TCDV
  • TCDV
  • Translation of CDV

2016-09

WG 2 Th. Huld 2018-01
IEC 61853-4 ED1

Photovoltaic (PV) module performance testing and energy rating - Part 4: Standard reference climatic profiles

82/1067/CD 2015-02 ACDV
  • ACDV
  • Approved for CDV

2016-04

TCDV
  • TCDV
  • Translation of CDV

2016-09

WG 2 Th. Huld 2018-01
IEC 62093 ED2

Balance-of-system components for photovoltaic systems - Design qualification natural environments

82/862/RR 2014-06 ACD
  • ACD
  • Approved for CD

2014-06

CD
  • CD
  • Draft circulated as CD

2016-07

WG 6 H. Igarashi 2017-04
IEC 62109-3 ED1

Safety of power converters for use in photovoltaic power systems - Part 3: Particular requirements for electronic devices in combination with photovoltaic elements

82/849/CD 2012-05 ACDV
  • ACDV
  • Approved for CDV

2014-11

TCDV
  • TCDV
  • Translation of CDV

2016-06

WG 6 J. Kalfus 2017-10
IEC TS 62257-7 ED2

Recommendations for renewable energy and hybrid systems for rural electrification - Part 7: Generators

82/1201/DTS 2014-07 CDTS
  • CDTS
  • Draft circulated as DTS

2016-11

PRVDTS
  • PRVDTS
  • Preparation of RVDTS

2017-01

JWG 1 S. Jayasinga 2017-10
IEC TS 62257-7-1 ED3

Recommendations for renewable energy and hybrid systems for rural electrification - Part 7-1: Generators - Photovoltaic generators

82/871/RR 2014-07 ADTS
  • ADTS
  • Approved for DTS

2014-07

TDTS
  • TDTS
  • Translation of DTS

2016-06

JWG 1 S. Jayasingam 2017-05
IEC TS 62257-7-3 ED2

Recommendations for renewable energy and hybrid systems for rural electrification - Part 7-3: Generator set - Selection of generators sets for rural electrification systems

82/871/RR 2014-07 ADTS
  • ADTS
  • Approved for DTS

2014-07

TDTS
  • TDTS
  • Translation of DTS

2016-06

JWG 1 S. Jayasingam 2017-05
IEC TS 62257-8-1 ED2

Recommendations for renewable energy and hybrid systems for rural electrification - Part 8-1: Selection of batteries and battery management systems for stand-alone electrification systems - Specific case of automotive flooded lead-acid batteries available in developing countries

82/871/RR 2014-07 ADTS
  • ADTS
  • Approved for DTS

2014-07

TDTS
  • TDTS
  • Translation of DTS

2016-12

JWG 1 R. Kumar 2017-05
IEC TS 62257-9-6 ED2

Recommendations for renewable energy and hybrid systems for rural electrification - Part 9-6: Integrated system - Selection of Photovoltaic Individual Electrification Systems (PV-IES)

82/871/RR 2014-07 ADTS
  • ADTS
  • Approved for DTS

2014-07

TDTS
  • TDTS
  • Translation of DTS

2016-06

JWG 1 A. Jacobson 2017-04
IEC 62446-2 ED1

Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 2: Grid connected systems - Maintenance of PV systems

82/1164/CD 2015-08 PCC
  • PCC
  • Preparation of CC

2016-11

2016-12

WG 3 G. Ball 2017-06
IEC TS 62446-3 ED1

Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 3: Outdoor infrared thermography of photovoltaic modules and plants

82/1188/DTS 2015-09 CDTS
  • CDTS
  • Draft circulated as DTS

2016-10

PRVDTS
  • PRVDTS
  • Preparation of RVDTS

2017-01

WG 3 B. Jaeckel 2017-05
IEC 62670-3 ED1

Photovoltaic concentrators (CPV) - Performance testing - Part 3: Performance measurements and power rating

82/1204/FDIS 2015-04 CFDIS
  • CFDIS
  • Draft circulated as FDIS

2016-11

PRVD
  • PRVD
  • Preparation of RVD document

2016-12

WG 7 M. Muller 2017-02
IEC 62688 ED1

Concentrator photovoltaic (CPV) module and assembly safety qualification

82/1126/CDV 2010-10 PRVC
  • PRVC
  • Preparation of RVC

2016-10

2017-01

WG 7 K. Villegas 2017-08
IEC TS 62738 ED1

Design guidelines and recommendations for ground-mounted photovoltaic power plants

82/1127/CD 2011-06 ADTS
  • ADTS
  • Approved for DTS

2016-08

CDTS
  • CDTS
  • Draft circulated as DTS

2016-12

WG 3 G. Ball 2017-08
IEC 62787 ED1

Concentrator photovoltaic (CPV) solar cells and cell-on-carrier (COC) assemblies - Reliability qualification

82/673/NP 2012-02 ACD
  • ACD
  • Approved for CD

2012-02

CD
  • CD
  • Draft circulated as CD

2016-12

WG 7 C. Algora 2017-05
IEC 62788-1-6 ED1

Measurement procedures for materials used in photovoltaic modules - Part 1-6: Encapsulants - Test methods for determining the degree of cure in Ethylene-Vinyl Acetate

82/1197/FDIS 2011-12 CFDIS
  • CFDIS
  • Draft circulated as FDIS

2016-11

PRVD
  • PRVD
  • Preparation of RVD document

2016-12

WG 2 Xiaowu Yang/David Miller 2017-02
IEC TS 62788-2 ED1

Measurement procedures for materials used in photovoltaic modules - Part 2: Polymeric materials used for frontsheets and backsheets

82/1189/DTS 2013-03 CDTS
  • CDTS
  • Draft circulated as DTS

2016-10

PRVDTS
  • PRVDTS
  • Preparation of RVDTS

2017-01

WG 2 J. Jung 2017-09
IEC 62788-5-1 ED1

Measurement procedures for materials used in photovoltaic modules - Part 5-1: Suggested test methods for use with edge seal materials

82/1102/NP 2016-07 ACD
  • ACD
  • Approved for CD

2016-07

CD
  • CD
  • Draft circulated as CD

2017-03

WG 2 M. Kempe 2018-09
IEC 62788-5-2 ED1

Measurement procedures for materials used in photovoltaic modules - Part 5-2: Edge-seal durability evaluation guideline

82/1103/NP 2016-07 ACD
  • ACD
  • Approved for CD

2016-07

CD
  • CD
  • Draft circulated as CD

2017-03

WG 2 M. Kempe 2018-09
IEC 62788-6-2 ED1

Measurement procedures for materials used in photovoltaic modules - Part 6-2: Moisture permeation testing with polymeric films

82/1104/NP 2016-07 ACD
  • ACD
  • Approved for CD

2016-07

CD
  • CD
  • Draft circulated as CD

2017-03

WG 2 M. Kempe 2018-09
IEC TS 62788-7-2 ED1

Measurement procedures for materials used in photovoltaic modules - Part 7-2: Environmental exposures - Accelerated weathering tests of polymeric materials

82/1212/DTS 2015-03 CDTS
  • CDTS
  • Draft circulated as DTS

2016-11

PRVDTS
  • PRVDTS
  • Preparation of RVDTS

2017-02

WG 2 2017-10
IEC 62790:2014/AMD1 ED1

Amendment 1 - Junction boxes for photovoltaic modules - Safety requirements and tests

82/1181/RR 2016-09 ACD
  • ACD
  • Approved for CD

2016-09

CD
  • CD
  • Draft circulated as CD

2016-10

WG 2 G. Volberg 2017-11
IEC TS 62804-2 ED1

Photovoltaic (PV) modules - Test methods for the detection of potential-induced degradation - Part 2: Thin-film

82/1042/NP 2016-02 ACD
  • ACD
  • Approved for CD

2016-02

CD
  • CD
  • Draft circulated as CD

2016-08

WG 2 P. Hacke 2017-08
IEC 62805-1 ED1

Method for measuring photovoltaic (PV) glass - Part 1: Measurement of total haze and spectral distribution of haze

82/1099/CDV 2012-06 AFDIS
  • AFDIS
  • Approved for FDIS

2016-09

TFDIS
  • TFDIS
  • Translation of FDIS

2017-01

WG 2 Xiao Pengjun 2017-05
IEC 62805-2 ED1

Method for measuring photovoltaic (PV) glass - Part 2: Measurement of transmittance and reflectanc

82/1100/CDV 2012-06 AFDIS
  • AFDIS
  • Approved for FDIS

2016-09

TFDIS
  • TFDIS
  • Translation of FDIS

2017-01

WG 2 Xiao Pengjun 2017-05
IEC 62817:2014/AMD1 ED1

Amendment 1 to IEC 62817 Ed.1: Photovoltaic systems - Design qualification of solar trackers

82/1018/CDV 2015-08 APUB
  • APUB
  • Approved for publication

2016-03

TPUB
  • TPUB
  • Translation of publication

2016-06

WG 7 M. Muller 2017-06
IEC 62891 ED1

Overall efficiency of grid connected photovoltaic inverters

82/866/CDV 2013-08 AFDIS
  • AFDIS
  • Approved for FDIS

2015-01

TFDIS
  • TFDIS
  • Translation of FDIS

2016-06

WG 6 V. Salas Merino 2017-06
IEC 62892-1 ED1

Testing of PV modules to differentiate performance in multiple climates and applications - Part 1: Requirements for testing

82/1155/CD 2013-08 ACDV
  • ACDV
  • Approved for CDV

2016-10

TCDV
  • TCDV
  • Translation of CDV

2017-06

WG 2 J. Wohlgemuth 2018-10
IEC 62892-2 ED1

Testing of PV modules to differentiate performance in multiple climates and applications - Part 2: Test procedure for thermal cycling

82/1200/CD 2016-03 CD
  • CD
  • Draft circulated as CD

2016-11

PCC
  • PCC
  • Preparation of CC document

2017-01

WG 2 N. Bosco 2018-03
IEC 62892-3 ED1

Testing of PV modules to differentiate performance in multiple climates and applications - Part 3: Test Procedure for encapsulant transmittance

82/1190/CD 2016-04 CD
  • CD
  • Draft circulated as CD

2016-10

PCC
  • PCC
  • Preparation of CC document

2017-01

WG 2 D. Miller 2018-03
IEC TS 62915 ED1

Photovoltaic (PV) Modules - Retesting for type approval, design and safety qualification

82/976/CD 2014-01 ADTS
  • ADTS
  • Approved for DTS

2015-08

CDTS
  • CDTS
  • Draft circulated as DTS

2016-12

WG 2 J. Althaus 2017-06
IEC TS 62916 ED1

Bypass diode electrostatic discharge susceptibility testing for photovoltaic modules

82/1059/DTS 2014-01 PRVDTS
  • PRVDTS
  • Preparation of RVDTS

2016-04

2016-06

WG 2 K. Whitfield 2017-04
IEC 62920 ED1

EMC requirements and test methods for power conversion equipment applying to photovoltaic power generating systems

82/1113/CDV 2014-02 AFDIS
  • AFDIS
  • Approved for FDIS

2016-09

TFDIS
  • TFDIS
  • Translation of FDIS

2017-04

WG 6 Y. Yoshioka 2017-09
IEC 62938 ED1

Non-uniform snow load testing for photovoltaic (PV) modules

82/930/CD 2014-05 TCDV
  • TCDV
  • Translation of CDV

2016-10

CCDV
  • CCDV
  • Draft circulated as CDV

2016-12

WG 2 J. Althaus 2018-02
IEC 62979 ED1

Photovoltaic module bypass diode thermal runaway test

82/1141/CDV 2015-01 PRVC
  • PRVC
  • Preparation of RVC

2016-11

2017-02

WG 2 Y. Uchida 2017-10
IEC 62980 ED1

Photovoltaic modules for building curtain wall applications

82/888/NP 2015-01 ACD
  • ACD
  • Approved for CD

2015-01

CD
  • CD
  • Draft circulated as CD

2016-12

WG 2 Jonghwa Song 2017-04
IEC TS 62989 ED1

Primary optics for concentrator photovoltaic systems

82/1136/CD 2015-02 ADTS
  • ADTS
  • Approved for DTS

2016-09

CCDV
  • CCDV
  • Draft circulated as CDV

2017-04

WG 7 R. Leutz 2018-04
IEC 62994-1 ED1

Environmental health and safety (EH&S) risk assessment of the PV module through the life cycle – Part 1: General principles and definitions of terms

82/1220/CD 2015-03 CD
  • CD
  • Draft circulated as CD

2016-12

PCC
  • PCC
  • Preparation of CC document

2017-03

PT 62994-1 Changho Lim 2018-02
IEC TS 63019 ED1

Information model for availability of photovoltaic (PV) power systems

82/1217/CD 2015-07 CD
  • CD
  • Draft circulated as CD

2016-12

PCC
  • PCC
  • Preparation of CC document

2017-03

WG 3 R. Hill 2017-05
IEC 63027 ED1

DC arc detection and interruption in photovoltaic power systems

82/973/NP 2015-08 ACD
  • ACD
  • Approved for CD

2015-08

CD
  • CD
  • Draft circulated as CD

2016-05

WG 6 N. Bogdanski 2017-06
IEC TS 63049 ED1

Terrestrial photovoltaic (PV) systems - Guideline for increased confidence in PV system installation

82/1135/CD 2016-02 ADTS
  • ADTS
  • Approved for DTS

2016-09

CCDV
  • CCDV
  • Draft circulated as CDV

2016-12

WG 3 S.Kurtz 2017-12
IEC 63092 ED1

Photovoltaics (PV) on roof

82/1055/NP 2016-10 ACD
  • ACD
  • Approved for CD

2016-10

CD
  • CD
  • Draft circulated as CD

2017-03

WG 2 H.-A. Kim 2019-03