International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 57

Power systems management and associated information exchange

 
export to xls file

TC 57 Work programme (66)

Project

Reference

Document

Reference

Init.

Date

Current

Stage

Next

Stage

Working

Group

Project

Leader

Fcst. Publ.

Date

PWI TR 57-1000 ED

IEC TR 61850-90-13, Deterministic networking technologies

PWI
  • PWI
  • Preliminary Work Item

2017-03

prePNW
  • prePNW
  • Preparation of NP document

2018-03

PNW 57-1846 ED

Application integration at electric utilities - System interfaces for distribution management – Part 5: Distributed energy optimization (proposed IEC 61968-5)

57/1846/NP PNW
  • PNW
  • New Work Item Proposal

2017-03

PRVN
  • PRVN
  • Preparation of RVN document

2017-05

WG 14 Gerald Gray 2019-04
IEC TS 61850-2 ED2

Communication networks and systems for power utility automation - Part 2: Glossary

57/1832/CD 2016-12 PCC
  • PCC
  • Preparation of CC document

2017-04

2017-05

WG 10 Christoph Brunner 2018-02
IEC 61850-6/AMD1 ED2

Amendment 1 - Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs

57/1697/CDV 2016-02 AFDIS
  • AFDIS
  • Approved for FDIS

2017-03

TFDIS
  • TFDIS
  • Translation of FDIS

2017-03

WG 10 Ch. Brunner 2017-12
IEC 61850-6-2 ED1

Communication networks and systems for power utility automation - Part 6-2: Configuration description language for extensions for human machine interfaces

57/1767/NP 2017-03 ACD
  • ACD
  • Approved for CD

2017-03

CD
  • CD
  • Draft circulated as CD

2017-07

WG 10 Dustin Tessier 2020-08
IEC 61850-7-2/AMD1 ED2

Amendment 1 - Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI)

57/1707/CDV 2016-04 AFDIS
  • AFDIS
  • Approved for FDIS

2017-01

TFDIS
  • TFDIS
  • Translation of FDIS

2017-01

WG 10 Ch. Brunner 2017-08
IEC 61850-7-3/AMD1 ED2

Amendment 1 - Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes

57/1708/CDV 2016-04 AFDIS
  • AFDIS
  • Approved for FDIS

2017-02

TFDIS
  • TFDIS
  • Translation of FDIS

2017-02

WG 10 Ch. Brunner 2017-10
IEC 61850-7-4/AMD1 ED2

Amendment 1 - Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes

57/1644/CDV 2015-10 AFDIS
  • AFDIS
  • Approved for FDIS

2017-01

TFDIS
  • TFDIS
  • Translation of FDIS

2017-05

WG 10 Ch. Brunner 2017-08
PWI 61850-7-5 ED1

IEC 61850 modeling concepts

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 10
IEC TS 61850-7-7 ED1

Communication networks and systems for power utility automation - Part 7-7: Basic communication structure - Machine-processable format of IEC 61850-related data models for tools

57/1768/NP 2017-01 ACD
  • ACD
  • Approved for CD

2017-01

CD
  • CD
  • Draft circulated as CD

2017-03

WG 10 Camille Bloch 2018-03
IEC 61850-7-420 ED2

Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes

57/1655/CD 2012-11 ACD
  • ACD
  • Approved for CD

2017-01

2CD
  • 2CD

2017-03

WG 17 F. Cleveland 2017-04
IEC TR 61850-7-500 ED1

Communication networks and systems for power utility automation – Part 7-500: Basic information and communication structure - Use of logical nodes for modeling application functions and related concepts and guidelines for substations

57/1817/DTR

2016-12 PRVDTR
  • PRVDTR
  • Preparation of RVDTR document

2017-02

APUB
  • APUB
  • Approved for publication

2017-05

2017-10
IEC 61850-8-1/AMD1 ED2

Amendment 1 - Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3

57/1823/CDV 2017-01 CCDV
  • CCDV
  • Draft circulated as CDV

2017-03

2017-05

WG 10 Christoph Brunner 2018-01
IEC 61850-8-2 ED1

Communication networks and systems for power utility automation - Part 8-2: Specific communication service mapping (SCSM) - Mapping to Extensible Messaging Presence Protocol (XMPP)

57/1833/CDV 2012-03 CCDV
  • CCDV
  • Draft circulated as CDV

2017-03

PRVC
  • PRVC
  • Preparation of RVC

2017-05

WG 17 B. Bony 2018-03
IEC 61850-9-2/AMD1 ED2

Amendment 1 - Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3

57/1709/CDV 2016-03 AFDIS
  • AFDIS
  • Approved for FDIS

2016-12

TFDIS
  • TFDIS
  • Translation of FDIS

2016-12

WG 10 Ch. Brunner 2017-09
PWI 61850-80-3 ED1

Communication networks and systems for power utility automation - Part 80-3: mapping to web protocols - requirement analysis and technology assessment

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 17
IEC TS 61850-80-5 ED1

Communication networks and systems for power utility automation - Part 80-5: Guideline for mapping information between IEC 61850 and IEC 61158-6 (Modbus)

57/1829/CD 2014-05 PCC
  • PCC
  • Preparation of CC document

2017-04

2017-05

WG 10 Seong-Jeong RIM 2017-07
PWI 61850-90-6 ED1

Use of IEC 61850 for distribution automation systems

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 17
PWI 61850-90-8 ED1

IEC 61850 object models for electrical mobility

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 17
PWI 61850-90-9 ED1

Use of IEC 61850 for electrical storage systems

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 17
IEC TR 61850-90-10 ED1

Communication networks and systems for power utility automation - Part 90-10: IEC 61850 objects for scheduling

57/1762/DTR 2016-08 PRVDTR
  • PRVDTR
  • Preparation of RVDTR document

2016-09

2016-12

PWI 61850-90-10 ED1

IEC 61850 object models for scheduling

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 17
PWI 61850-90-11 ED1

Methodologies for modeling of logics for IEC 61850 based applications

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 10
PWI 61850-90-14 ED1

Using IEC 61850 for FACTS data modeling

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 10
PWI 61850-90-15 ED1

Hierarchical architecture of a DER system

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 17
IEC TS 61850-90-16 ED1

Communication networks and systems for power utility automation - Part 90-16: System management for IEC 61850

57/1775/NP 2017-01 ACD
  • ACD
  • Approved for CD

2017-01

CD
  • CD
  • Draft circulated as CD

2017-06

WG 10 Thierry Coste 2019-05
IEC TR 61850-90-17 ED1

Communication networks and systems for power utility automation - Part 90-17: Using IEC 61850 to transmit power quality data

57/1676/DTR 2016-02 BPUB
  • BPUB
  • Publication being printed

2017-04

PPUB
  • PPUB
  • Publication issued

2017-05

2017-05
PWI 61850-90-19 ED1

Communication networks and systems for power utility automation - Part 90-19: Using Role Based Access Control (RBAC) and IEC 61850

PWI
  • PWI
  • Preliminary Work Item

2016-09

prePNW
  • prePNW
  • Preparation of NP document

WG 10
IEC TR 61850-90-19 ED1

Communication networks and systems for power utility automation - Part 90-19: Using Role Based Access Control (RBAC) and IEC 61850

PWI
  • PWI
  • Preliminary Work Item

2016-12

WG 10
PWI 61850-90-20 ED1

Communication networks and systems for power utility automation - Part 90-20: Guideline to redundancy systems

PWI
  • PWI
  • Preliminary Work Item

2016-11

CDTR
  • CDTR
  • Circulation of DTR

2017-12

WG 10
PWI 61850-99-99 ED1

Communication network in hydropower plants

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 18
PWI 61850-100-1 ED1

Commissioning testing of IEC 61850 based systems

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 10
IEC 61968-1 ED3

Application integration at electric utilities - System interfaces for distribution management - Part 1: Interface architecture and general recommendations

57/1742/RR 2016-07 ACDV
  • ACDV
  • Approved for CDV

2016-07

TCDV
  • TCDV
  • Translation of CDV

2017-12

WG 14 Sh. Hu 2019-04
PWI 61968-5 ED1

Operational Planning

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 14
IEC 61968-9 ED3

Application integration at electric utilities - System interfaces for distribution management - Part 9: Interfaces for meter reading and control

57/1787/RR 2016-11 ACDV
  • ACDV
  • Approved for CDV

2016-11

TCDV
  • TCDV
  • Translation of CDV

2017-12

WG 14 D. Bishop 2019-05
IEC 61968-11 ED3

Application integration at electric utilities - System interfaces for distribution management - Part 11: Common information model (CIM) extensions for distribution

57/1791/CDV
2016-05 PRVC
  • PRVC
  • Preparation of RVC

2017-04

2017-07

WG 14 M. Goodrich 2018-01
IEC 61968-13 ED2

Application integration at electric utilities - System interfaces for distribution management - Part 13: Common distribution power system model profiles

57/1714/CD 2015-03 PCC
  • PCC
  • Preparation of CC

2016-07

2016-08

WG 13 E. Lambert 2017-10
PWI 61970-302 ED1

CIM for Dynamics Specification

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 13
IEC 61970-302 ED1

Energy Management System Application Program Interface (EMS-API) - Part 302: CIM for Dynamics

57/1685/CDV 2016-02 AFDIS
  • AFDIS
  • Approved for FDIS

2016-12

TFDIS
  • TFDIS
  • Translation of FDIS

2016-11

WG 13 Patricia Brown 2017-08
IEC 61970-452 ED3

Energy management system application program interface (EMS-API) - Part 452: CIM static transmission network model profiles

57/1868/FDIS 2016-04 CFDIS
  • CFDIS
  • Draft circulated as FDIS

2017-04

PRVD
  • PRVD
  • Preparation of RVD document

2017-06

WG 13 K. Hunter 2017-08
IEC 61970-453/AMD1 ED2

Amendment 1 - Energy management system application program interface (EMS-API) - Part 453: Diagram layout profile

57/1677/CDV 2015-10 AFDIS
  • AFDIS
  • Approved for FDIS

2017-04

TFDIS
  • TFDIS
  • Translation of FDIS

2017-04

WG 13 Alan McMorran 2017-12
IEC 61970-456 ED2

Energy management system application program interface (EMS-API) - Part 456: Solved power system state profiles

57/1861/RR 2017-04 ACDV
  • ACDV
  • Approved for CDV

2017-04

TCDV
  • TCDV
  • Translation of CDV

2017-04

WG 13 Lars-Ola Österlund 2018-08
PWI 61970-457 ED1

Dynamics Profile

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 13
IEC 61970-458 ED1

Energy management system application program interface (EMS-API) - Part 458: Common information model (CIM) extension to generation

57/1114/NP 2012-01 PWI
  • PWI
  • Preliminary Work Item

2014-02

prePNW
  • prePNW
  • Preparation of NP document

WG 13 J.-F. Cabadi
IEC 61970-502-8 ED1

Energy Management System Application Program Interface (EMS-API) - Part 502-8: Web Services Profile for 61970-4 Abstract Services

57/1012/CD 2008-01 PWI
  • PWI
  • Preliminary Work Item

2010-10

prePNW
  • prePNW
  • Preparation of NP document

WG 13 J. Gillerman
IEC TS 61970-600-1 ED1

Energy management system application program interface (EMS-API) - Part 600-1: Common Grid Model Exchange Specification (CGMES) - Structure and rules

57/1815/DTS

2016-12 PRVDTS
  • PRVDTS
  • Preparation of RVDTS

2017-03

2017-06

WG 13 Dario Frazzetta 2017-11
IEC TS 61970-600-2 ED1

Energy management system application program interface (EMS-API) - Part 600-2: Common Grid Model Exchange Specification (CGMES) - Exchange profiles specification

57/1816/DTS

2016-12 PRVDTS
  • PRVDTS
  • Preparation of RVDTS

2017-03

2017-06

WG 13 Dario Frazzetta 2017-11
IEC 62325-301 ED2

Framework for energy market communications - Part 301: Common Information Model (CIM) extensions for markets

57/1785/CDV 2016-07 PRVC
  • PRVC
  • Preparation of RVC

2017-03

2017-06

WG 16 B. Iverson 2018-01
IEC 62325-451-3/AMD1 ED1

Amendment 1 - Framework for energy market communications - Part 451-3: Transmission capacity allocation business process (explicit or implicit auction) and contextual models for European market

57/1755/CDV 2016-07 BPUB
  • BPUB
  • Being published

2017-03

PPUB
  • PPUB
  • Publication issued

2017-04

WG 16 M. Monti 2017-04
PWI 62325-451-6 ED1

Communication Transparency

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 16
PWI 62325-452-1 ED1

Day Ahead Market

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 16
PWI 62325-452-4 ED1

Weather data to support market operations

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 16
PWI 62325-452-5 ED1

Communications with Demand Response Systems

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 16
PWI 62325-550-2 ED1

Common Dynamic Data Structures for DAM, RT, FTR

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 16
PWI 62325-552-1 ED1

Dynamic Data Structures for DAM

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 16
IEC 62351-4 ED1

Power systems management and associated information exchange - Data and communications security - Part 4: Profiles including MMS

57/1476/RR 2014-05 TCDV
  • TCDV
  • Translation of CDV

2017-03

CCDV
  • CCDV
  • Draft circulated as CDV

2017-05

WG 15 H. Falk 2018-07
IEC 62351-7 ED1

Power systems management and associated information exchange - Data and communications security - Part 7: Network and System Management (NSM) data object models

57/1857/FDIS 2014-04 CFDIS
  • CFDIS
  • Draft circulated as FDIS

2017-03

PRVD
  • PRVD
  • Preparation of RVD document

2017-05

WG 15 G.L. Pugni 2017-07
IEC 62351-9 ED1

Power systems management and associated information exchange - Data and communications security - Part 9: Cyber security key management for power system equipment

57/1838/FDIS

2011-07 BPUB
  • BPUB
  • Being published

2017-03

PPUB
  • PPUB
  • Publication issued

2017-05

WG 15 2017-05
IEC 62351-14 ED1

Power systems management and associated information exchange - Data and communications security - Part 14: Cyber security event logging

57/1746/NP 2016-12 ACD
  • ACD
  • Approved for CD

2016-12

CD
  • CD
  • Draft circulated as CD

2017-04

WG 15 Stephan Hutterer 2018-12
IEC TS 62351-100-1 ED1

Power systems management and associated information exchange - Data and communications security - Part 100-1: Conformance test cases for the IEC 62351-5 and its companion standards for secure data exchange communication interfaces

57/1852/CD 2016-11 CD
  • CD
  • Draft circulated as CD

2017-03

PCC
  • PCC
  • Preparation of CC document

2017-06

WG 15 M. Grechi 2018-09
PWI 62357-2 ED1

Power systems management and associated information exchange - Part 2: Use Cases

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 19
IEC TS 62361-102 ED1

Power systems management and associated information exchange - Interoperability in the long term - Part 102: CIM - IEC 61850 harmonization

57/1706/DTS 2014-04 PRVDTS
  • PRVDTS
  • Preparation of RVDTS

2016-07

2016-09

WG 19 L. Schmitt 2017-11
IEC TS 62361-104-10 ED1

Power systems management and associated information exchange – Interoperability in the long term - Part 104-10: Guideline for Technical Committees and Working Groups on extending IEC 61850 (proposed IEC TS 62361-104-10)

57/1803/NP 2017-04 ACD
  • ACD
  • Approved for CD

2017-04

CD
  • CD
  • Draft circulated as CD

2017-06

WG 10 Laurent Guise 2019-01
IEC 62488-2 ED1

Power line communication systems for power utility applications - Part 2: Analogue power line carrier terminals or APLC

57/1867/FDIS 2015-06 CFDIS
  • CFDIS
  • Draft circulated as FDIS

2017-04

PRVD
  • PRVD
  • Preparation of RVD document

2017-06

WG 20 J. Newbury 2017-08
PWI 62488-3 ED1

Digital Interfaces operating over EHV/HV/MV/LV electricity grids

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 20
PWI 62488-4 ED1

Broadband systems operating over EHV/HV/MV/LV electricity grids

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 20