International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 65

Industrial-process measurement, control and automation

 
export to xls file

TC 65 Work programme (15)

sort up

Project

Reference

Document

Reference

Init.

Date

sort upsort down

Current

Stage

sort upsort down

Next

Stage

Working

Group

sort upsort down

Project

Leader

sort upsort down

Fcst. Publ.

Date

IEC 61010-2-202 Ed. 1.0  

Safety requirements for electrical equipment for measurement, control and laboratory use - Part 2-2 xx: Particular requirements for electrically operated valve and actuator
65/552/CD2013-08A2CD
  • A2CD
  • Approved for 2nd Committee Draft

2014-07

2CD
  • 2CD
  • 2nd Committee Draft

2014-09

JWG 13R Kretschmann2016-05
IEC 62424 Ed. 2.0  

Representation of process control engineering - Request in P&I diagrams and data exchange between P&ID tools and PCE-CAE tools.
65/544/CDV2012-01ADIS
  • ADIS
  • Approved for FDIS circulation

2014-03

DEC
  • DEC
  • Draft at Editing Check

2014-07

WG 12G Mayr2014-12
IEC 62443-2-4 Ed. 1.0  

Security for industrial process measurement and control - Network and system security - Part 2-4: Certification of IACS supplier security policies and practices
65/545/CDV2011-07APUB
  • APUB
  • Draft approved for publication

2014-03

DEC
  • DEC
  • Draft at Editing Check

2015-07

WG 10L Neitzel2015-12
IEC 62443-3-2 Ed. 1.0  

Industrial communication networks - Network and system security Part 3-2: Security assurance levels for zones and conduits
65/534/DC2011-03ACDV
  • ACDV
  • Draft approved for Committee Draft with Vote

2013-07

CCDV
  • CCDV
  • Draft circulated as Committee Draft with Vote

2014-02

WG 10T. Phinney2015-06
IEC 62443-4-1 Ed. 1.0  

Industrial communication networks - Security for industrial and control systems - Part: 4-1: Product development requirements
65/546/NP2014-03ANW
  • ANW
  • Approved New Work

2014-03

1CD
  • 1CD
  • 1st Committee Draft

2014-04

WG10T Phinney2016-04
IEC 62443-4-2 Ed. 1.0  

Industrial communication networks - Security for industrial automation and control systems - Part 4-2: Technical security requirements for IACS compnents
65/546/NP2014-03ANW
  • ANW
  • Approved New Work

2014-03

1CD
  • 1CD
  • 1st Committee Draft

2014-10

WG10T Phinney2016-07
IEC 62708 Ed. 1.0  

Documents for electrical and instrumentation projects in the process industry
65/527/CDV2010-11DEC
  • DEC
  • Draft at Editing Check

2014-08

 

WG15S. Schuler2015-02
IEC 62832 Ed. 1.0  

Industrial-process measurement, control and automation - Reference model for representation of production facilities (Digital Factory)
65/563/CD2012-08CDM
  • CDM
  • Committee Draft to be discussed at Meeting

2014-07

A2CD
  • A2CD
  • Approved for 2nd Committee Draft

2014-10

WG 16U Doebrich2015-09
IEC 62881 Ed. 1.0  

Cause & Effect Table
65/566/CD2013-071CD
  • 1CD
  • 1st Committee Draft

2014-05

A2CD
  • A2CD
  • Approved for 2nd Committee Draft

2014-09

H Weber2016-09
IEC 62890 Ed. 1.0  

Life-cycle management for systems and products used in industrial-process measurement, control and automation
65/526/NP2013-08ANW
  • ANW
  • Approved New Work

2013-08

CCDV
  • CCDV
  • Draft circulated as Committee Draft with Vote

2013-11

WG19M Ullemeyer2014-08
IEC/TR 62443-2-3 Ed. 1.0  

Industrial communication networks - Network and system security Part 2-3: Patch management in the IACS environment
65/554/DTR2011-03DEC
  • DEC
  • Draft at Editing Check

2014-04

 

WG 10T Phinney2014-09
IEC/TS 62443-1-3 Ed. 1.0  

Industrial communication networks - Network and system security Part 1-3: System security compliance metrics
65/557/DTS2011-03ACDV
  • ACDV
  • Draft approved for Committee Draft with Vote

2014-07

CDTS
  • CDTS
  • Circulated Draft Technical Specification

2015-06

WG10T. Phinney2014-12
IEC/TS 62872 Ed. 1.0  

Industrial process measurement, control and automation - System interface between Industrial Facilities and the Smart Grid.
65/555/CD2013-04A2CD
  • A2CD
  • Approved for 2nd Committee Draft

2014-06

2CD
  • 2CD
  • 2nd Committee Draft

2014-09

WG17T Ishikuma2016-04
ISO/IEC 20140-5 Ed. 1.0  

Automation systems and integration - Evaluating energy efficiency and other factors of manufacturing systems that influence the environment - Part 5: Environmental influence evaluation data
65/516/NP2013-03ANW
  • ANW
  • Approved New Work

2013-03

1CD
  • 1CD
  • 1st Committee Draft

2014-03

WG17G Hoercher2016-03
PNW 65-562 Ed. 1.0  

Power sources for a wireless communication device Part 1: General requirements of power sources Part 2: Battery profile Part 3: Energy harvesting specification
65/562/NP PNW
  • PNW
  • Proposed New Work

2014-04

ANW
  • ANW
  • Approved New Work

2014-08

L Winkel