International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 64

Installations électriques et protection contre les chocs électriques

 
export to xls file

TC 64 Programme de Travail (23)

Référence

Projet

Référence

Document

Init.

Date

Stage

Courant

Prochain

Stage

Working

Group

Project

Leader

Fcst. Publ.

Date

64/2131/CD 2016-07 PCC
  • PCC
  • Preparation of CC

2016-11

2016-12

MT 2 G. Cronshaw 2018-10
64/2123/CDV 2015-11 PRVC
  • PRVC
  • Preparation of RVC

2016-11

2017-02

MT 3 J. Peronnet 2017-09
64/2136/CD 2016-02 PCC
  • PCC
  • Preparation of CC

2016-10

2016-11

MT 39 J. Perronet 2019-01
64/2137/CD 2016-02 PCC
  • PCC
  • Preparation of CC

2016-10

2016-11

MT 39 J. Perronet 2019-01
64/2149A/CD 2016-02 CD
  • CD
  • Draft circulated as CD

2016-10

PCC
  • PCC
  • Preparation of CC document

2017-02

MT 38 E. Fajula 2019-01
64/2133/CD 2016-02 PCC
  • PCC
  • Preparation of CC

2016-11

2016-12

MT 37 C-D. Ziebell 2019-01
64/2120/CD 2016-02 PCC
  • PCC
  • Preparation of CC

2016-08

2016-09

MT 36 Giovanni Cassinelli 2019-01
64/2116/CD 2015-05 ACDV
  • ACDV
  • Approved for CDV

2016-09

TCDV
  • TCDV
  • Translation of CDV

2016-11

MT 34 G. Cronshaw 2018-03
64/2161/CD 2015-01 CD
  • CD
  • Draft circulated as CD

2017-01

PCC
  • PCC
  • Preparation of CC document

2017-04

PT 60364-5-57 E. Tison 2017-10
64/2125/CD 2016-07 PCC
  • PCC
  • Preparation of CC

2016-09

2016-10

Jacques Peronnet
64/2155/FDIS 2015-02 CFDIS
  • CFDIS
  • Draft circulated as FDIS

2016-12

PRVD
  • PRVD
  • Preparation of RVD document

2017-01

MT 9 J. Bradley 2017-04
64/2162/FDIS 2015-08 CFDIS
  • CFDIS
  • Draft circulated as FDIS

2017-01

PRVD
  • PRVD
  • Preparation of RVD document

2017-03

MT 33 2017-05
64/2146/CD 2015-11 PCC
  • PCC
  • Preparation of CC

2016-12

2017-01

MT 40 M. Mueller 2018-12
64/2145/CDV 2015-02 CCDV
  • CCDV
  • Draft circulated as CDV

2016-11

PRVC
  • PRVC
  • Preparation of RVC

2017-02

MT 9 J. Bradley 2017-11
IEC 60364-7-712 ED2

Installations électriques à basse tension - Partie 7-712: Exigences applicables aux installations ou emplacements spéciaux - Installations d'énergie solaire photovoltaïque (PV)

64/2154/FDIS


2015-08 PRVD
  • PRVD
  • Preparation of RVD

2017-01

2017-02

JWG 32 J. Bradley 2017-03
64/2067/NP 2015-12 ACD
  • ACD
  • Approved for CD

2015-12

CD
  • CD
  • Draft circulated as CD

2016-09

PT 60364-7-716 G. Cronshaw 2018-09
64/2109/CDV 2015-08 PRVC
  • PRVC
  • Preparation of RVC

2016-07

2016-10

MT 33 G. Cronshaw 2017-06
64/2099/CD 2016-01 PCC
  • PCC
  • Preparation of CC

2016-04

2016-05

MT 42 C. Pfeiffer 2018-03
64/2158/CD 2016-02 CD
  • CD
  • Draft circulated as CD

2016-12

PCC
  • PCC
  • Preparation of CC document

2017-03

MT 41 J. Peronnet 2018-10
64/2097/CD 2013-10 PCC
  • PCC
  • Preparation of CC

2016-04

2016-04

PT 60364-8-2 E. Tison 2017-05
64/2094/NP 2016-04 ACDV
  • ACDV
  • Approved for CDV

2016-04

TCDV
  • TCDV
  • Translation of CDV

2018-06

PT 60364-8-3 J. Ahn 2019-10
64/2143/DTS

2015-06 PRVDTS
  • PRVDTS
  • Preparation of RVDTS

2016-12

2017-03

MT 4 K. Haverkampf 2017-08
IEC TS 61200-101 ED1

Guide d'application: Installation électrique résidentielle en courant continu non prévue pour être connectée à un Réseau de Distribution Publique

64/2153/CD 2016-04 CD
  • CD
  • Draft circulated as CD

2016-12

PCC
  • PCC
  • Preparation of CC document

2017-03

PT 61200-101 Etienne Tison 2019-02