International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 8

Aspects système de la fourniture d'énergie électrique

 
export to xls file

TC 8 Programme de Travail (7)

Référence

Projet

Référence

Document

Init.

Date

Stage

Courant

Prochain

Stage

Working

Group

Project

Leader

Fcst. Publ.

Date

8/1433/CD 2015-05 PCC
  • PCC
  • Preparation of CC

2016-09

2016-10

MT 1 D. Sweeting 2018-04
8/1434/CD 2015-05 PCC
  • PCC
  • Preparation of CC

2016-09

2016-10

MT 1 D. Sweeting 2018-04
8/1439/DTS 2012-02 PRVDTS
  • PRVDTS
  • Preparation of RVDTS

2016-11

2017-02

PT 62786 L. Z. Yao and G. Dell'Olio 2017-08
8/1445/DTS

2013-10 PRVDTS
  • PRVDTS
  • Preparation of RVDTS

2016-12

2017-03

WG 7 Z. Bie, P. Zhang 2017-08
8/1437/CD 2013-10 PCC
  • PCC
  • Preparation of CC document

2016-10

2016-11

WG 7 J. Zhang, P. Zhang 2017-06
8/1427A/NP 2016-08 ACD
  • ACD
  • Approved for CD

2016-08

CD
  • CD
  • Draft circulated as CD

2017-06

WG 7 D. H. Zheng 2019-12
8/1454/CD 2016-05 CD
  • CD
  • Draft circulated as CD

2016-12

PCC
  • PCC
  • Preparation of CC document

2017-03

WG 8 M. Wilch 2017-12