International Standards and Conformity Assessment
for all electrical, electronic and related technologies
SC 65E |
Devices and integration in enterprise systems |

Preview | Reference, Edition, Date, Title | Language |
|---|---|---|
| IEC/TS 61804-1
Edition 1.0 (2003-10-09)Function blocks (FB) for process control - Part 1: Overview of system aspectsStability Date: 2013 | EN |
| IEC 61804-2
Edition 2.0 (2006-09-12)Function blocks (FB) for process control - Part 2: Specification of FB concept Stability Date: 2011 | EN |
| IEC 61804-3
Edition 2.0 (2010-11-29)Function blocks (FB) for process control - Part 3: Electronic Device Description Language (EDDL)Stability Date: 2012 | EN-FR |
| IEC 61804-3
Edition 2.0 (2010-11-29)Function blocks (FB) for process control - Part 3: Electronic Device Description Language (EDDL) Stability Date: 2012 | EN |
| IEC/TR 61804-4
Edition 1.0 (2006-12-08)Function blocks (FB) for process control - Part 4: EDD interoperability guideline Stability Date: 2009 | EN |
| IEC/TR 61804-6
Edition 1.0 (2012-04-04)Function blocks (FB) for process control - Electronic device description language (EDDL) - Part 6: Meeting the requirements for integrating fieldbus devices in engineering tools for field devicesStability Date: 2016 | EN |
| IEC 61987-1
Edition 1.0 (2006-12-14)Industrial-process measurement and control - Data structures and elements in process equipment catalogues - Part 1: Measuring equipment with analogue and digital outputStability Date: 2011 | EN-FR |
| IEC 61987-1
Edition 1.0 (2006-12-14)Industrial-process measurement and control - Data structures and elements in process equipment catalogues - Part 1: Measuring equipment with analogue and digital output Stability Date: 2011 | EN |
| IEC 61987-10
Edition 1.0 (2009-07-23)Industrial-process measurement and control - Data structures and elements in process equipment catalogues - Part 10: List of Properties (LOPs) for Industrial-Process Measurement and Control for Electronic Data Exchange - FundamentalsStability Date: 2014 | EN-FR |
| No preview | IEC 61987-10
Edition 1.0 (2012-05-30)Corrigendum 1 - Industrial-process measurement and control - Data structures and elements in process equipment catalogues - Part 10: Lists of properties (LOPs) for industrial-process measurement and control for electronic data exchange - Fundamentals Stability Date: 2014 | EN-FR |
| IEC 61987-10
Edition 1.0 (2009-07-23)Industrial-process measurement and control - Data structures and elements in process equipment catalogues - Part 10: Lists of properties (LOPs) for industrial-process measurement and control for electronic data exchange - FundamentalsStability Date: 2014 | EN |
| IEC 61987-11
Edition 1.0 (2012-07-24)Industrial-process measurement and control - Data structures and elements in process equipment catalogues - Part 11: List of Properties (LOP) of measuring equipment for electronic data exchange - Generic structuresStability Date: 2016 | EN |
| IEC 62264-1
Edition 1.0 (2003-03-14)Enterprise-control system integration - Part 1: Models and terminologyStability Date: 2010 | EN-FR |
| IEC 62264-1
Edition 1.0 (2003-03-14)Enterprise-control system integration - Part 1: Models and terminologyStability Date: 2010 | EN |
| IEC 62264-2
Edition 1.0 (2004-07-20)Enterprise-control system integration - Part 2: Object model attributesStability Date: 2010 | EN-FR |
| IEC 62264-2
Edition 1.0 (2004-07-20)Enterprise-control system integration - Part 2: Object model attributesStability Date: 2010 | EN |
| IEC 62264-3
Edition 1.0 (2007-06-06)Enterprise-control system integration - Part 3: Activity models of manufacturing operations managementStability Date: 2010 | EN-FR |
| IEC 62264-5
Edition 1.0 (2011-02-23)Enterprise-control system integration - Part 5: Business to manufacturing transactions Stability Date: 2017 | EN-FR |
| IEC 62337
Edition 2.0 (2012-02-22)Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestonesStability Date: 2016 | EN-FR |
| No preview | IEC 62337
Edition 2.0 (2012-12-11)Corrigendum 1 - Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones Stability Date: 2016 | EN-FR |
| IEC 62381
Edition 2.0 (2012-02-22)Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)Stability Date: 2016 | EN-FR |
| IEC 62382
Edition 2.0 (2012-11-08)Control systems in the process industry - Electrical and instrumentation loop checkStability Date: 2014 | EN-FR |
| IEC/TR 62390
Edition 1.0 (2005-01-27)Common automation device - Profile guideline Stability Date: 2015 | EN |
| IEC 62453-1
Edition 1.0 (2009-06-30)Field device tool (FDT) interface specification - Part 1: Overview and guidanceStability Date: 2012 | EN-FR |
| IEC 62453-1
Edition 1.0 (2009-06-30)Field device tool (FDT) interface specification - Part 1: Overview and guidanceStability Date: 2012 | EN |
| IEC 62453-2
Edition 1.0 (2009-06-30)Field device tool (FDT) interface specification - Part 2: Concepts and detailed descriptionStability Date: 2012 | EN |
| IEC/TR 62453-41
Edition 1.0 (2009-08-18)Field device tool (FDT) interface specification - Part 41: Object model integration profile - Common object modelStability Date: 2012 | EN |
| IEC/TR 62453-61
Edition 1.0 (2009-08-18)Field device tool interface specification - Device Type Manager (DTM) Styleguide for common object modelStability Date: 2012 | EN |
| IEC 62453-301
Edition 1.0 (2009-06-30)Field device tool (FDT) interface specification - Part 301: Communication profile integration - IEC 61784 CPF 1Stability Date: 2012 | EN |
| IEC 62453-302
Edition 1.0 (2009-06-30)Field device tool (FDT) interface specification - Part 302: Communication profile integration - IEC 61784 CPF 2Stability Date: 2012 | EN |
| IEC 62453-303-1
Edition 1.0 (2009-06-30)Field device tool (FDT) interface specification - Part 303-1: Communication profile integration - IEC 61784 CP 3/1 and CP 3/2Stability Date: 2012 | EN-FR |
| IEC 62453-303-1
Edition 1.0 (2009-06-30)Field device tool (FDT) interface specification - Part 303-1: Communication profile integration - IEC 61784 CP 3/1 and CP 3/2Stability Date: 2012 | EN |
| IEC 62453-303-2
Edition 1.0 (2009-06-30)Field device tool (FDT) interface specification - Part 303-2: Communication profile integration - IEC 61784 CP 3/4, CP 3/5 and CP 3/6Stability Date: 2012 | EN |
| IEC 62453-306
Edition 1.0 (2009-06-30)Field device tool (FDT) interface specification - Part 306: Communication profile integration - IEC 61784 CPF 6Stability Date: 2012 | EN |
| IEC 62453-309
Edition 1.0 (2009-07-08)Field device tool (FDT) interface specification - Part 309: Communication profile integration - IEC 61784 CPF 9Stability Date: 2012 | EN |
| IEC 62453-315
Edition 1.0 (2009-07-08)Field device tool (FDT) interface specification - Part 315: Communication profile integration - IEC 61784 CPF 15Stability Date: 2012 | EN |
| IEC/TR 62453-501
Edition 1.0 (2009-08-18)Field device tool (FDT) interface specification - Part 501: Communication implementation for common object model - IEC 61784 CPF 1Stability Date: 2012 | EN |
| IEC/TR 62453-502
Edition 1.0 (2009-08-18)Field device tool (FDT) interface specification - Part 502: Communication implementation for common object model - IEC 61784 CPF 2Stability Date: 2012 | EN |
| IEC/TR 62453-503-1
Edition 1.0 (2009-08-18)Field device tool (FDT) interface specification - Part 503-1: Communication implementation for common object model - IEC 61784 CP 3/1 and CP 3/2Stability Date: 2012 | EN |
| IEC/TR 62453-503-2
Edition 1.0 (2009-08-18)Field device tool (FDT) interface specification - Part 503-2: Communication implementation for common object model - IEC 61784 CP 3/4, CP 3/5 and CP 3/6Stability Date: 2012 | EN |
| IEC/TR 62453-506
Edition 1.0 (2009-08-18)Field device tool (FDT) interface specification - Part 506: Communication implementation for common object model - IEC 61784 CPF 6Stability Date: 2012 | EN |
| IEC/TR 62453-509
Edition 1.0 (2009-08-18)Field device tool (FDT) interface specification - Part 509: Communication implementation for common object model - IEC 61784 CPF 9Stability Date: 2012 | EN |
| IEC/TR 62453-515
Edition 1.0 (2009-08-18)Field device tool (FDT) interface specification - Part 515: Communication implementation for common object model - IEC 61784 CPF 15Stability Date: 2012 | EN |
| IEC/TR 62541-1
Edition 1.0 (2010-02-18)OPC Unified Architecture - Part 1: Overview and ConceptsStability Date: 2013 | EN |
| IEC/TR 62541-2
Edition 1.0 (2010-02-18)OPC Unified Architecture - Part 2: Security ModelStability Date: 2013 | EN |
| IEC 62541-3
Edition 1.0 (2010-07-29)OPC unified architecture - Part 3: Address Space ModelStability Date: 2013 | EN-FR |
| IEC 62541-3
Edition 1.0 (2010-07-29)OPC unified architecture - Part 3: Address Space ModelStability Date: 2013 | EN |
| IEC 62541-4
Edition 1.0 (2011-10-20)OPC unified architecture - Part 4: ServicesStability Date: 2013 | EN-FR |
| IEC 62541-5
Edition 1.0 (2011-10-18)OPC unified architecture - Part 5: Information ModelStability Date: 2013 | EN-FR |
| IEC 62541-6
Edition 1.0 (2011-10-18)OPC unified architecture - Part 6: MappingsStability Date: 2013 | EN-FR |
| IEC 62541-7
Edition 1.0 (2012-07-31)OPC unified architecture - Part 7: ProfilesStability Date: 2013 | EN-FR |
| IEC 62541-8
Edition 1.0 (2011-10-18)OPC unified architecture - Part 8: Data AccessStability Date: 2013 | EN-FR |
| IEC 62541-9
Edition 1.0 (2012-07-27)OPC unified architecture - Part 9: Alarms and conditionsStability Date: 2013 | EN-FR |
| IEC 62541-10
Edition 1.0 (2012-07-27)OPC unified architecture - Part 10: ProgramsStability Date: 2013 | EN-FR |



